CN201507049U - Glass curtain wall structure - Google Patents

Glass curtain wall structure Download PDF

Info

Publication number
CN201507049U
CN201507049U CN2009202165198U CN200920216519U CN201507049U CN 201507049 U CN201507049 U CN 201507049U CN 2009202165198 U CN2009202165198 U CN 2009202165198U CN 200920216519 U CN200920216519 U CN 200920216519U CN 201507049 U CN201507049 U CN 201507049U
Authority
CN
China
Prior art keywords
curtain wall
bar
glass
wall structure
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202165198U
Other languages
Chinese (zh)
Inventor
班广生
李玉霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009202165198U priority Critical patent/CN201507049U/en
Application granted granted Critical
Publication of CN201507049U publication Critical patent/CN201507049U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to a novel glass curtain wall structure which is assembled by vertical posts, crossbeams and hollow glass, wherein the middle portions of each vertical post and the crossbeam are provided with strip-shaped grooves, a peripheral framework of the hollow glass is provided with clamping grooves, and curtain wall pressing block connecting pieces can fix the hollow glass on the vertical posts and the crossbeams through the clamping grooves. The novel glass curtain wall structure is characterized in that the original mode of connecting glass and pressing plates is changed into the mode of fastening the curtain wall pressing block connecting pieces to the nylon clamping grooves, thereby omitting materials of an auxiliary frame, structural adhesive, double-sided adhesive tape and the like in an original curtain wall, saving energy sources and material, reducing the construction procedure of adhering the glass with the auxiliary frame and the transportation procedure of secondary carrying and the like, and decreasing transportation cost. Besides, section bar of the structure has strong universality, and is convenient to install. Compared with the original curtain wall structure, the glass curtain wall structure has the most advanced point that the crossbeams and the vertical posts are universally used on exposed framing or hidden framing glass curtain wall systems.

Description

A kind of glass curtain wall structure
Technical field
The utility model belongs to building field, relates to a kind of novel glass curtain wall structure.
Background technology
Curtain wall is meant building external envelope structure or decorating structure, generally is the body of wall with individual layer or double-layer glass.In the structure of existing building curtain wall, particularly latent full curtain wall and half latent curtain wall adopt the double layer glass structure usually.Hollow layer adopts the mode of structure glue bonding between 9-12mm between the hollow glass.Its structure is bonding by the structure glue of glass and the secondary frame of aluminium alloys, again the mode that is connected and fixed by connector and horizontal, vertical keel.Need directly pressing plate to be pressed on outer sheet glass when installing as half latent frame and fix, frame concealed curtain wall glass is installed need be with the secondary frame of aluminium alloys and a large amount of structure glue and two-sided subsides, and along with the increase of material requested, expense is also increasing.Glass and attached frame need to become assembly in that factory is bonding, through loading and unloading, transport to the building site again and install.This mounting means has strengthened the difficulty of transit link.
Summary of the invention
In order to overcome the deficiencies in the prior art, the utility model provides a kind of novel glass curtain wall structure, can reduce the material that uses, and is quick for installation, and the succinct and convenient transportation of operation is saved cost.
The utility model provides a kind of novel glass curtain wall structure, is assembled by column, crossbeam and hollow glass; Be provided with bar-shaped trough at every root post and crossbeam middle part, bar-shaped trough is relative with seam crossing between per two blocks of hollow glasss; The framework place is provided with draw-in groove around hollow glass, is provided with the curtain wall briquetting connector that hollow glass is fixed on column and the crossbeam between each draw-in groove and described bar-shaped trough; Described curtain wall briquetting connector comprises a bar, is set with a pressing plate on bar, and the two ends of pressing plate snap in respectively in the relative draw-in groove of two blocks of adjacent hollow glasss; One end of bar is a thick head, and its size is positioned at described bar-shaped trough greater than the bar diameter, and a securing member is housed on the other end of bar.
The utility model changes original glass and pressing plate connected mode into the snap fit of curtain wall briquetting connector and nylon draw-in groove, by curtain wall briquetting connector curtain wall is directly pressed solidly on column and crossbeam, saved the material such as secondary frame, structure glue, two-sided subsides of original curtain wall, transit links such as energy conservation, the working procedure of saving material, minimizing glass and secondary frame bonding and rehandling, reduce cost of transportation, the section bar highly versatile and install convenient.This structure than original curtain wall construction more advanced be that crossbeam, column can be common to bright frame, concealed frame glass curtain wall system, avoided the shortcoming that old-fashioned element type curtain wall profiles can not be general, bring great convenience in latent frame, half latent frame, Curtain wall with open frame system.Mounting structure of the present utility model has increased the safety and the steadiness of glass-wall building greatly.
Description of drawings
Fig. 1 is the schematic top plan view of the utility model frame concealed curtain wall structure;
Fig. 2 is the schematic side view of the utility model frame concealed curtain wall structure;
Fig. 3 is the schematic top plan view of the utility model Curtain wall with open frame structure;
Fig. 4 is the schematic side view of the utility model Curtain wall with open frame structure;
Fig. 5 be draw-in groove be positioned on the hollow glass structural representation (local figure);
Fig. 6 is the curtain wall briquetting connector structure chart that is used for frame concealed curtain wall
Fig. 7 is the curtain wall briquetting connector structure chart that is used for Curtain wall with open frame.
Mark among the figure:
1 column, 2 crossbeams, 3 hollow glasss, 4 draw-in grooves, 5 curtain wall briquetting connectors, 51 bars, 52 pressing plates, 53 securing members, 6 bar-shaped troughs, 7 structure glue, 8 adhesive tape.
The specific embodiment
Referring to Fig. 1 to Fig. 4, the utility model provides a kind of novel glass curtain wall structure, is assembled with a piece hollow glass 3 on the keel frame that several columns 1, crossbeam 2 constitute.Specifically: be provided with bar-shaped trough 6 at every root post 1 and crossbeam 2 middle parts, bar-shaped trough 6 is relative with seam crossing between per two blocks of hollow glasss 3; The framework place is provided with draw-in groove 4 (referring to Fig. 5) around hollow glass 3, draw-in groove 4 is a nylon material, it is bonded in the framework of hollow glass 3 by structure glue 7, the shape of draw-in groove 4 can be the rectangle draw-in groove, it also can be arc-shaped slot, it and firm being combined into one of described framework, the quantity of draw-in groove 4 is determined by the size and the integrated curtain-wall structure of hollow glass on each frame.Be provided with the curtain wall briquetting connector 5 that hollow glass 3 is fixed on column 1 and the crossbeam 2 between each draw-in groove 4 and the described bar-shaped trough 6; Described curtain wall briquetting connector 5 comprises a bar 51, is set with a pressing plate 52 on bar 51, and the two ends of pressing plate 52 are convex, snaps in respectively in the relative draw-in groove 4 of two blocks of adjacent hollow glasss 3; One end of bar 51 is a thick head, its size is greater than bar 51 diameters, be positioned at described bar-shaped trough 6, it is limited by bar-shaped trough 6, bar 51 can not be rotated, one securing member 53 is housed, when when fastening, being fixed on pressing plate 52 securing member 53 firmly in the draw-in groove 4 of two blocks of relative hollow glasss 3 on the other end of bar 51.Fastening effect by curtain wall briquetting connector 5 promptly is fixed on hollow glass 3 on column 1 and the crossbeam 2 like this, again.Referring to Fig. 1 to Fig. 4, on column 1, crossbeam 2, also be provided with adhesive tape 8 with hollow glass 3 opposite positions, when making hollow glass 3 be fastened on column 1 and the crossbeam 2, avoid damage to hollow glass.
What Fig. 1 and Fig. 2 represented is the structure of the utility model frame concealed curtain wall, and what Fig. 3 and Fig. 4 represented is the structure of the utility model Curtain wall with open frame.Below two kinds of embodiments are specified:
Illustrated in figures 1 and 2 is first kind of embodiment, is the structure of concealed frame glass curtain wall.Wherein the bar 51 of curtain wall briquetting connector 5 is bolt (referring to Fig. 6), the turret head of bolt (being the thick head end of described bar) snaps in the bar-shaped trough of column or crossbeam, the two ends projection of pressing plate 52 snaps in respectively in the relative draw-in groove 4 of two blocks of adjacent hollow glasss 3, the securing member 53 of curtain wall briquetting connector 5 is a nut, by fastening nut, hollow glass 3 is fixed on column 1 and the crossbeam 2.Conceal after nut is fastening in the seam of hollow glass 3, formed concealed frame glass curtain wall.
Fig. 3 and shown in Figure 4 be second kind of embodiment, be the structure of bright frame glass curtain wall.Wherein the bar 51 of curtain wall briquetting connector 5 is polished rod (referring to Fig. 7), the thick head end of bar 51 snaps in the bar-shaped trough of column or crossbeam, the two ends projection of pressing plate 52, snap in respectively in the relative draw-in groove 4 of two blocks of adjacent hollow glasss 3, the securing member 53 of curtain wall briquetting connector 5 is outer briquettings, during installation, block, hollow glass 3 is fixed on column 1 and the crossbeam 2 by outer briquetting 53 being rotated to the position parallel with pressing plate 52.

Claims (7)

1. a novel glass curtain wall structure is assembled by column, crossbeam and hollow glass, it is characterized in that: be provided with bar-shaped trough at every root post and crossbeam middle part, bar-shaped trough is relative with seam crossing between per two blocks of hollow glasss; The framework place is provided with draw-in groove around hollow glass, is provided with the curtain wall briquetting connector that hollow glass is fixed on column and the crossbeam between each draw-in groove and described bar-shaped trough; Described curtain wall briquetting connector comprises a bar, is set with a pressing plate on bar, and the two ends of pressing plate snap in respectively in the relative draw-in groove of two blocks of adjacent hollow glasss; One end of bar is a thick head, and its size is positioned at described bar-shaped trough greater than the bar diameter, and a securing member is housed on the other end of bar.
2. glass curtain wall structure according to claim 1 is characterized in that described draw-in groove bonds in the framework of hollow glass by structure glue.
3. glass curtain wall structure according to claim 1 and 2 is characterized in that, described draw-in groove is nylon rectangle draw-in groove or nylon arc-shaped slot.
4. glass curtain wall structure according to claim 1 is characterized in that, described curtain wall briquetting connector comprises a bar, on bar, be set with a pressing plate, one end of bar is a thick head, and its size is equipped with a securing member greater than the bar diameter on the other end of bar.
5. glass curtain wall structure according to claim 4 is characterized in that the two ends of described pressing plate are convex.
6. glass curtain wall structure according to claim 4 is characterized in that, the bar of described curtain wall briquetting connector is a bolt, and the securing member of curtain wall briquetting connector is a nut.
7. glass curtain wall structure according to claim 4 is characterized in that, the bar of described curtain wall briquetting connector is a polished rod, and the securing member of curtain wall briquetting connector is outer briquetting.
CN2009202165198U 2009-09-18 2009-09-18 Glass curtain wall structure Expired - Fee Related CN201507049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202165198U CN201507049U (en) 2009-09-18 2009-09-18 Glass curtain wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202165198U CN201507049U (en) 2009-09-18 2009-09-18 Glass curtain wall structure

Publications (1)

Publication Number Publication Date
CN201507049U true CN201507049U (en) 2010-06-16

Family

ID=42468178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202165198U Expired - Fee Related CN201507049U (en) 2009-09-18 2009-09-18 Glass curtain wall structure

Country Status (1)

Country Link
CN (1) CN201507049U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994355A (en) * 2010-10-14 2011-03-30 广东金刚玻璃科技股份有限公司 Unit-type components of fireproofing glass curtain wall
CN102359325A (en) * 2011-06-29 2012-02-22 安徽同曦金鹏铝业有限公司 Window frame opening structure on full hidden frame aluminum alloy glass curtain wall
CN102359207A (en) * 2011-06-29 2012-02-22 安徽同曦金鹏铝业有限公司 Transverse frame profile of all-concealed frame aluminum alloy glass curtain wall
CN102392504A (en) * 2011-10-10 2012-03-28 苏州柯利达装饰股份有限公司 Clamping groove type profiled color steel plate curtain wall
CN102733516A (en) * 2012-06-06 2012-10-17 苏州金螳螂幕墙有限公司 Inter-floor unit curtain wall structure
CN102995798A (en) * 2012-11-30 2013-03-27 上海玻机智能幕墙股份有限公司 Safety hook system with integral structure of hidden framing glass curtain wall
CN103015594A (en) * 2012-12-26 2013-04-03 湖北科翼建筑科技研究有限公司 Fit formation and installation method of panel of arc-shaped glass curtain wall
CN103758355A (en) * 2014-02-20 2014-04-30 成军 Hollow glass no-auxiliary-frame installation method of hidden frame glass curtain wall
CN105064572A (en) * 2015-09-08 2015-11-18 哈尔滨森鹰窗业股份有限公司 Fixing method for curtain wall glass peripheral structure
CN106968393A (en) * 2017-05-23 2017-07-21 清华大学 Two layers of sun protection glass of fixed sunshade expanded metals are put in a kind of
CN106988460A (en) * 2017-05-23 2017-07-28 清华大学 Three layers of sun protection glass of fixed sunshade expanded metals are put in a kind of
CN108661220A (en) * 2018-07-24 2018-10-16 中建装饰海南有限公司 A kind of glass curtain wall system and its installation method
CN112459319A (en) * 2020-12-02 2021-03-09 中铁十四局集团建筑工程有限公司 Heat-insulated aluminum alloy through-shaft assembled curtain wall window

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101994355A (en) * 2010-10-14 2011-03-30 广东金刚玻璃科技股份有限公司 Unit-type components of fireproofing glass curtain wall
CN102359325A (en) * 2011-06-29 2012-02-22 安徽同曦金鹏铝业有限公司 Window frame opening structure on full hidden frame aluminum alloy glass curtain wall
CN102359207A (en) * 2011-06-29 2012-02-22 安徽同曦金鹏铝业有限公司 Transverse frame profile of all-concealed frame aluminum alloy glass curtain wall
CN102359325B (en) * 2011-06-29 2013-03-27 安徽同曦金鹏铝业有限公司 Window frame opening structure on full hidden frame aluminum alloy glass curtain wall
CN102392504A (en) * 2011-10-10 2012-03-28 苏州柯利达装饰股份有限公司 Clamping groove type profiled color steel plate curtain wall
CN102733516A (en) * 2012-06-06 2012-10-17 苏州金螳螂幕墙有限公司 Inter-floor unit curtain wall structure
CN102995798A (en) * 2012-11-30 2013-03-27 上海玻机智能幕墙股份有限公司 Safety hook system with integral structure of hidden framing glass curtain wall
CN103015594A (en) * 2012-12-26 2013-04-03 湖北科翼建筑科技研究有限公司 Fit formation and installation method of panel of arc-shaped glass curtain wall
CN103758355A (en) * 2014-02-20 2014-04-30 成军 Hollow glass no-auxiliary-frame installation method of hidden frame glass curtain wall
CN103758355B (en) * 2014-02-20 2016-08-17 南通锦鸿建筑科技有限公司 Concealed frame glass curtain wall double glazing is without auxiliary frame installation method
CN105064572A (en) * 2015-09-08 2015-11-18 哈尔滨森鹰窗业股份有限公司 Fixing method for curtain wall glass peripheral structure
CN105064572B (en) * 2015-09-08 2018-02-02 哈尔滨森鹰窗业股份有限公司 A kind of fixing means of cladding glass peripheral structure
CN106968393A (en) * 2017-05-23 2017-07-21 清华大学 Two layers of sun protection glass of fixed sunshade expanded metals are put in a kind of
CN106988460A (en) * 2017-05-23 2017-07-28 清华大学 Three layers of sun protection glass of fixed sunshade expanded metals are put in a kind of
CN106988460B (en) * 2017-05-23 2023-02-07 清华大学 Three-layer sunshade glass with middle fixed sunshade plate net
CN108661220A (en) * 2018-07-24 2018-10-16 中建装饰海南有限公司 A kind of glass curtain wall system and its installation method
CN112459319A (en) * 2020-12-02 2021-03-09 中铁十四局集团建筑工程有限公司 Heat-insulated aluminum alloy through-shaft assembled curtain wall window

Similar Documents

Publication Publication Date Title
CN201507049U (en) Glass curtain wall structure
CN201581527U (en) Novel glass plate hanging device for invisible-frame curtain wall
CN202299039U (en) Connecting device of steel keel frame hidden-frame glass curtain wall
CN102888926A (en) Keel connecting component for curtain wall board
CN102184982A (en) Installation assembly and installation method for solar cell panel
CN201679127U (en) Combined safe and energy-saving curtain wall
CN203392263U (en) Novel container
CN102888924A (en) Keel connecting component for mounting curtain wall board
CN203270868U (en) Steel mullion-aluminum transverse frame type hidden-frame glass curtain wall
CN202049963U (en) Solar cell panel mounting component
CN202809930U (en) Keel connecting assembly for curtain wallboards
CN201850676U (en) Horizontal-frame-free curtain wall pendant
CN202809932U (en) Keel connecting component used for installing curtain wall plates
CN202299040U (en) Connection device for steel joist exposed frame glass curtain wall
CN212336461U (en) Steel-aluminum combined anti-falling magic cube glass box curtain wall
CN204290826U (en) Photovoltaic system flexible installing device
CN210507963U (en) Detachable panel unit curtain wall
CN210104970U (en) Connection structure of light gauge steel
CN209975818U (en) Glass curtain wall node structure of diamond body daylighting top
CN209429343U (en) A kind of plate-jointing structure of concealed frame glass curtain wall
CN201627288U (en) Hidden frame glass curtain wall device
CN201933654U (en) Point-supported photovoltaic glass curtain wall
CN206673875U (en) Anti- high wind solar cell module mounting bracket
CN205647381U (en) Photovoltaic cell board subassembly fixed mounting device
CN204539060U (en) A kind of photovoltaic green-house and photovoltaic module fixed structure thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jinyige Curtain Wall Decoration Engineering Co., Ltd., Beijing

Assignor: Ban Guangsheng| Li Yuxia

Contract record no.: 2011110000110

Denomination of utility model: Glass curtain wall structure

Granted publication date: 20100616

License type: Exclusive License

Record date: 20110715

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100616

Termination date: 20150918

EXPY Termination of patent right or utility model