CN103015594A - Fit formation and installation method of panel of arc-shaped glass curtain wall - Google Patents

Fit formation and installation method of panel of arc-shaped glass curtain wall Download PDF

Info

Publication number
CN103015594A
CN103015594A CN2012105721089A CN201210572108A CN103015594A CN 103015594 A CN103015594 A CN 103015594A CN 2012105721089 A CN2012105721089 A CN 2012105721089A CN 201210572108 A CN201210572108 A CN 201210572108A CN 103015594 A CN103015594 A CN 103015594A
Authority
CN
China
Prior art keywords
glass
curtain
keel
arc
unit
Prior art date
Application number
CN2012105721089A
Other languages
Chinese (zh)
Other versions
CN103015594B (en
Inventor
易静
黄胜
王军
叶丽丽
Original Assignee
湖北科翼建筑科技研究有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 湖北科翼建筑科技研究有限公司 filed Critical 湖北科翼建筑科技研究有限公司
Priority to CN201210572108.9A priority Critical patent/CN103015594B/en
Publication of CN103015594A publication Critical patent/CN103015594A/en
Application granted granted Critical
Publication of CN103015594B publication Critical patent/CN103015594B/en

Links

Abstract

The invention relates to a fit formation and installation method of a panel of an arc-shaped glass curtain wall, belonging to the technical field of construction of a glass curtain wall. The method comprises installation of a keel framework of the glass curtain wall and installation of glass of unit curtain walls, wherein the keel framework of the glass curtain wall consists of vertical straight keels and horizontal arc-shaped keels, and unit keel frameworks of the glass curtain wall are formed by the vertical straight keels arranged in parallel at intervals and the horizontal arc-shaped keels arranged in parallel at intervals; and small unit straight glass of unit glass panels of the curtain wall are subject to one-by-one micro arc fixation and connection through fixing frames, pressure blocks and the small unit keel frameworks formed by the vertical straight keels and the horizontal micro arc-shaped keels, thereby realizing fit formation of the curved surface of the overall arc-shaped curtain wall. By adopting the installation method, smooth transition from small unit curtain wall glass to the curved surface of the overall arc-shaped curtain wall and attractive appearance of the arc-shaped curtain wall can be ensured. The method has the advantages of simple installation structure, easy installation and maintenance and high operability. Moreover, resources can be saved, the construction period can be shortened, and the cost can be reduced effectively.

Description

A kind of arc glass curtain wall slab match shaping mounting method

Technical field:

A kind of arc glass curtain wall slab of the present invention match shaping mounting method belongs to the CONSTRUCTION TECHNOLOGY FOR GLASS CURTAIN WALL field.

Background technology:

Building teacher of being designed of increasing curved surface form designs, and this just has higher requirement to the construction of building curtain wall especially curtain wall.In order to realize the curved surface effect of building, we can select the glass bending method at normal conditions, with glass high temperature hot bending.Cost increases much but the hot bending of glass is processed, and cost and difficulty are all higher.This way has also been brought the design difficulty of opening tophinged window in addition, is difficult to guarantee watertightness and the tightness of curtain wall, so make the application of arc glass curtain wall in the building curtain wall field be subject to very large limitation.

Summary of the invention:

The purpose of this invention is to provide a kind of arc glass curtain wall slab match shaping mounting method, can greatly lower construction costs, for the owner saves investment, shorten the construction period, thereby realize that the arc glass curtain wall is in the extensive use in building curtain wall field.

The present invention is achieved by the following technical solutions:

The present invention is a kind of arc glass curtain wall slab match shaping mounting method, comprise that the curtain wall keel frame is installed and unit curtain wall glass is installed, characteristics are that described curtain wall keel frame is comprised of vertical straight keel and horizontal drag keel, the horizontal drag keel that the vertical straight keel that parallel interval arranges and parallel interval arrange, the unit keel frame of formation arc glass curtain wall; The curtain wall unit face glass, connect with the corresponding pressing of unit keel frame of arc glass curtain wall with briquetting by unit face glass fixed frame, namely with briquetting vertical frame, the transverse frame of glass plate fixed frame are exerted pressure and are connected with the vertical straight keel of the unit keel frame of arc glass curtain wall, horizontal differential of the arc shape keel respectively, thereby the match shaping that realizes integral curved curtain wall is installed.

The vertical straight keel of described formation curtain wall keel frame and horizontal drag keel are aluminium alloy joist.

Described unit face glass is two-sided hollow glass.

Described unit face glass fixed frame is affixed by structure viscose glue and the face glass back side, unit periphery.

The periphery that the periphery of described face glass fixed frame exceeds face glass is fillet.

Installation steps are as follows:

1, mounting glass curtain skeleton framework; By the vertical straight keel of parallel interval setting and the horizontal drag keel of parallel interval setting, consist of the unit keel frame of arc glass curtain wall;

2, production unit cladding glass, unit keel frame specification according to the arc glass curtain wall, cutter unit glass plate and making glass plate fixed frame, adopt the structure viscose glue with face glass fixed frame and the face glass back side, unit periphery fixed bonding, and glass plate fixed frame periphery is the briquetting mounting edge greater than the periphery of face glass.

3, respectively with briquetting with the vertical frame of glass plate fixed frame, transverse frame with the vertical straight keel of the unit keel frame of arc glass curtain wall, laterally differential of the arc keel are exerted pressure and are fixedly connected with, carry out so one by one unit curtain wall glass and install, thereby the match arc of realizing integral curved curtain wall is installed.

4, after the match of integral curved curtain wall is shaped and installs, carry out seam injecting glue, maintenance and cleaning.

The invention provides a kind of arc glass curtain wall slab match shaping mounting method, the invention is one by one with the straight glass of junior unit, forming the differential of the arc with briquetting with the junior unit keel frame that is made of vertical straight keel and horizontal differential of the arc keel by its fixed frame is fixedly connected with, thereby the integral curved curtain wall curved surface of match moulding, this installation method have guaranteed that curtain wall of small unit glass is to the requirement with aesthetic property of seamlessly transitting of integral curved curtain wall curved surface; Its mounting structure of this method is simple, is easy to installation and maintenance, and is workable, and economizes on resources, and shortens the construction period, effectively reduces cost.

Description of drawings:

Fig. 1 is arc glass curtain wall overall structure schematic diagram of the present invention;

Fig. 2 is the unit keel frame schematic diagram of the arc glass curtain wall of the straight keel of glass curtain wall vertical of the present invention and horizontal drag keel formation;

Fig. 3 is the arc schematic diagram of the horizontal drag keel relative level of curtain wall of the present invention face;

Fig. 4 is that unit of the present invention glass plate is connected front view with unit glass plate fixed frame;

Fig. 5 is that unit of the present invention glass plate is connected lateral view with unit glass plate fixed frame;

Fig. 6 is that unit of the present invention face glass fixed frame is by the unit keel frame corresponding pressing connection diagram of briquetting with the arc glass curtain wall.

The specific embodiment:

How now further specify by reference to the accompanying drawings the present invention implements:

1, mounting glass curtain skeleton framework, the horizontal drag keel 2 that the vertical straight keel 1 that arranged by parallel interval are connected with parallel interval is connected with fabric structure respectively, consists of the unit keel frame of arc glass curtain wall;

2, production unit cladding glass, unit keel frame specification according to the arc glass curtain wall, cutter unit glass plate 3 and making glass plate fixed frame 5, adopt structure viscose glue 6 with face glass fixed frame 5 and unit face glass 3 back sides periphery fixed bonding, and glass plate fixed frame 5 peripheries are briquetting 4 mounting edges greater than the periphery of face glass 3.

3, respectively with briquetting 4 with the vertical frame of glass plate fixed frame 5, transverse frame with the vertical straight keel 1 of the unit keel frame of arc glass curtain wall, laterally differential of the arc keel 2 are exerted pressure and are fixedly connected with, carry out so one by one unit curtain wall glass and install, thereby the match arc of realizing integral curved curtain wall is installed.

4, after the match of integral curved curtain wall is shaped and installs, carry out seam injecting glue, maintenance and cleaning.

Claims (6)

1. arc glass curtain wall slab match shaping mounting method, comprise that the curtain wall keel frame is installed and unit curtain wall glass is installed, it is characterized in that, described curtain wall keel frame is comprised of vertical straight keel and horizontal drag keel, the horizontal drag keel that the vertical straight keel that parallel interval arranges and parallel interval arrange, the unit keel frame of formation arc glass curtain wall; The curtain wall unit face glass, connect with the corresponding pressing of unit keel frame of arc glass curtain wall with briquetting by unit face glass fixed frame, namely with briquetting vertical frame, the transverse frame of glass plate fixed frame are exerted pressure and are connected with the vertical straight keel of the unit keel frame of arc glass curtain wall, horizontal differential of the arc shape keel respectively, thereby the match shaping that realizes integral curved curtain wall is installed.
2. a method as claimed in claim 1 is characterized in that comprising the steps:
1., mounting glass curtain skeleton framework; By the vertical straight keel of parallel interval setting and the horizontal drag keel of parallel interval setting, consist of the unit keel frame of arc glass curtain wall;
2., production unit cladding glass, unit keel frame specification according to the arc glass curtain wall, cutter unit glass plate and making glass plate fixed frame, adopt the structure viscose glue with face glass fixed frame and the face glass back side, unit periphery fixed bonding, and glass plate fixed frame periphery is the briquetting mounting edge greater than the periphery of face glass.
3., respectively with briquetting with the vertical frame of glass plate fixed frame, transverse frame with the vertical straight keel of the unit keel frame of arc glass curtain wall, laterally differential of the arc keel are exerted pressure and are fixedly connected with, carry out so one by one unit curtain wall glass and install, thereby the match arc of realizing integral curved curtain wall is installed.
4., after the match of integral curved curtain wall is shaped and installs, carry out seam injecting glue, maintenance and cleaning.
3. a kind of arc glass curtain wall slab match shaping mounting method according to claim 1 is characterized in that, the vertical straight keel and the horizontal drag keel that consist of the curtain wall keel frame are aluminium alloy joist.
4. a kind of arc glass curtain wall slab match shaping mounting method according to claim 1 is characterized in that, the unit face glass is two-sided hollow glass.
5. a kind of arc glass curtain wall slab match shaping mounting method according to claim 1 is characterized in that, unit face glass fixed frame is affixed by structure viscose glue and the face glass back side, unit periphery.
6. a kind of arc glass curtain wall slab match shaping mounting method according to claim 1 is characterized in that, the periphery that the periphery of face glass fixed frame exceeds face glass is fillet.
CN201210572108.9A 2012-12-26 2012-12-26 Fit formation and installation method of panel of arc-shaped glass curtain wall CN103015594B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210572108.9A CN103015594B (en) 2012-12-26 2012-12-26 Fit formation and installation method of panel of arc-shaped glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210572108.9A CN103015594B (en) 2012-12-26 2012-12-26 Fit formation and installation method of panel of arc-shaped glass curtain wall

Publications (2)

Publication Number Publication Date
CN103015594A true CN103015594A (en) 2013-04-03
CN103015594B CN103015594B (en) 2015-02-25

Family

ID=47964651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210572108.9A CN103015594B (en) 2012-12-26 2012-12-26 Fit formation and installation method of panel of arc-shaped glass curtain wall

Country Status (1)

Country Link
CN (1) CN103015594B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503454A (en) * 2017-08-14 2017-12-22 中建八局第三建设有限公司 Super large width bend glass curtain wall mechanization installation method
CN108590000A (en) * 2018-05-11 2018-09-28 中国五冶集团有限公司 A kind of rotary curtain wall construction
CN108612241A (en) * 2018-05-11 2018-10-02 中国五冶集团有限公司 Non-coplanar Curtain wall frame for external wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06207442A (en) * 1992-12-17 1994-07-26 Y K K Architect Prod Kk Panel unit mounting structure for curtain wall
CN201305938Y (en) * 2008-11-10 2009-09-09 广东金刚幕墙工程有限公司 Curtain wall used corner profile system with adjustable angle
CN201507049U (en) * 2009-09-18 2010-06-16 班广生 Glass curtain wall structure
CN102031838A (en) * 2010-12-31 2011-04-27 苏州柯利达建筑装饰工程有限公司 Cambered fully-hidden frame glass curtain wall system
CN201850680U (en) * 2010-11-09 2011-06-01 苏州柯利达建筑装饰工程有限公司 Exposed frame curtain wall system capable of rotating any degrees
KR101056746B1 (en) * 2011-05-26 2011-08-12 주식회사 테크론 The adiabatic structures and methodes of the glass curtain wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06207442A (en) * 1992-12-17 1994-07-26 Y K K Architect Prod Kk Panel unit mounting structure for curtain wall
CN201305938Y (en) * 2008-11-10 2009-09-09 广东金刚幕墙工程有限公司 Curtain wall used corner profile system with adjustable angle
CN201507049U (en) * 2009-09-18 2010-06-16 班广生 Glass curtain wall structure
CN201850680U (en) * 2010-11-09 2011-06-01 苏州柯利达建筑装饰工程有限公司 Exposed frame curtain wall system capable of rotating any degrees
CN102031838A (en) * 2010-12-31 2011-04-27 苏州柯利达建筑装饰工程有限公司 Cambered fully-hidden frame glass curtain wall system
KR101056746B1 (en) * 2011-05-26 2011-08-12 주식회사 테크론 The adiabatic structures and methodes of the glass curtain wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503454A (en) * 2017-08-14 2017-12-22 中建八局第三建设有限公司 Super large width bend glass curtain wall mechanization installation method
CN108590000A (en) * 2018-05-11 2018-09-28 中国五冶集团有限公司 A kind of rotary curtain wall construction
CN108612241A (en) * 2018-05-11 2018-10-02 中国五冶集团有限公司 Non-coplanar Curtain wall frame for external wall

Also Published As

Publication number Publication date
CN103015594B (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN204278192U (en) The vertical assembling die of sectionalized house production line
CN201665971U (en) Ceramic polyurethane composite decorative sheet
CN201933665U (en) Exposed frame curtain wall realizing indoor mounting and replacement of glass
CN107060166B (en) A kind of circular arc diamond shape stone curtain wall
CN203569752U (en) Building curtain wall
CN102505783A (en) Adjacent panel misplacement unit glass wall system
CN103485460B (en) Be convenient for changing the curtain wall of face glass
CN202120956U (en) Connection structure of frame of solar assembly
CN203782939U (en) Novel stainless steel fireproof curtain wall
CN203834758U (en) Device for connecting decorative mouldings in glass curtain wall system
CN203383680U (en) Bottom sectional material of sliding window
CN103469943B (en) Multi-angle glass curtain wall unit plate and consisting of glass curtain wall system
CN202809913U (en) Hidden frame curtain wall glass hanging connection structure
CN102535698B (en) Heat insulation curtain wall
CN204091635U (en) A kind of structure of blind box cover
CN202248467U (en) Stereoscopic suspended ceiling
CN205077819U (en) Convenient assembled support of guaranteing
CN103696518B (en) A kind of aluminium suspension member is to formula dry seal stone curtain wall system
CN203640115U (en) Modular curtain wall panel
CN206289813U (en) A kind of big lattice type unitized curtain wall with central post
CN203514587U (en) Glass curtain wall used for building shaped like frustum of cone
CN205399974U (en) Can pull open formula baseboard
CN201605971U (en) Anti-loosing corner connector
CN203129378U (en) Hidden-frame curtain wall inter-story structure capable of achieving integral displacement
CN203034647U (en) Keel-free curtain wall

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225

Termination date: 20151226

EXPY Termination of patent right or utility model