CN201502175U - Hanging-hole supporting-model device for pipeline floor slab - Google Patents
Hanging-hole supporting-model device for pipeline floor slab Download PDFInfo
- Publication number
- CN201502175U CN201502175U CN2009203090451U CN200920309045U CN201502175U CN 201502175 U CN201502175 U CN 201502175U CN 2009203090451 U CN2009203090451 U CN 2009203090451U CN 200920309045 U CN200920309045 U CN 200920309045U CN 201502175 U CN201502175 U CN 201502175U
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- pipeline
- hanging
- steel sleeve
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a hanging-hole supporting-model device for pipeline floor slab, the side of the upper circle of a left semi-steel casing (6) is welded with a piece of left mortar concrete steel baffle plate (5), the side of the upper circle of a right semi-steel casing (1) is welded with a piece of right mortar concrete steel baffle plate (2); and the adjacent sides of the right semi-steel casing (1) and the left semi-steel casing (6) are respectively welded with bolt clips (3, 7, 9, 10), connecting bolts (4, 8) compose the right semi-steel casing (1) and the left semi-steel casing (6) into a circular cylinder which can clamp the pipeline through the bolt clips (3, 7, 9, 10). In the utility model, when the hanging-hole construction of the pipeline floor slab is conducted, the hanging-hole supporting-model device for pipeline floor slab can rapidly support model and can be reused, and has convenient using, simple structure, reliable performance, and low cost.
Description
Technical field
The utility model relates to a kind of construction equipment, particularly relates to a kind of construction and hangs the hole with the pipeline floor and prop up die device.
Background technology
In the engineering construction process, for guaranteeing the verticality of piping erection, usually need reserve the hole at pipeline through-flooring place, then need behind the pipe laying hole construction is hung at pipeline through-flooring hole.In engineering construction, hanging the hole construction needs to carry out formwork with template and bamboo builder's jack formwork with these materials and conventional method at present, and its labour intensity is big, the formwork recruitment time is long, waste of material is serious.
The utility model content
Technical problem to be solved in the utility model provide a kind of fast and the pipeline floor that can reuse hang the hole and prop up die device.
In order to solve the problems of the technologies described above, the pipeline floor that the utility model provides hangs the last round edge face down bonding that props up die device left side half steel sleeve pipe in the hole and is connected to a left mortar concrete steel shoe, the last round edge face down bonding of right half steel sleeve pipe is connected to a right mortar concrete steel shoe, the avris that faces mutually at described right half steel sleeve pipe and left half steel sleeve pipe is welded with the bolt clamp respectively, and connecting bolt becomes the cylinder that can tighten pipeline with described right half steel sleeve pipe with left half steel sleeve combination by described bolt clamp.
The pipeline floor of employing technique scheme hangs the hole and props up die device, when needs pipeline floor hangs the hole, unclamp the bolt clamp, with device divide half-and-half from, after piping erection finishes, to install two parts once more around the pipeline assembling, the bolt on the device for screwing up is fixed on device on the pipeline, and the plane of baffle plate is concordant with soffit simultaneously.Before the cast mortar concrete, on baffle-panels, brush release agent, understand thoroughly after instructions for use hanging, device is disassembled, carry out the construction that the next one hangs the hole.
In sum, the utility model is a kind ofly can hang hole when construction at the pipeline floor, can quick template supporting and recycling and easy to use, simple in structure, dependable performance, pipeline floor with low cost hang the hole and prop up die device.
Description of drawings
Fig. 1 is the utility model side structure schematic diagram;
Fig. 2 is the utility model plane structure schematic diagram.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1 and Fig. 2, the last round edge face down bonding of left side half steel sleeve pipe 6 is connected to a left mortar concrete steel shoe 5, the last round edge face down bonding of right half steel sleeve pipe 1 is connected to a right mortar concrete steel shoe 2, be welded with the first bolt clamp 3 and the second bolt clamp 7 at right half steel sleeve pipe 1 respectively with the avris that faces mutually of left half steel sleeve pipe 6, face mutually at left half steel sleeve pipe 6 and right half steel sleeve pipe 1 that avris is welded with the 3rd bolt clamp 10 respectively and the 4th bolt clamp 9, the first connecting bolts 4 pass the first bolt clamp 3 and the 3rd bolt clamp 10, second connecting bolt 8 passes the second bolt clamp 7 and the 4th bolt clamp 9 is combined into a cylinder that can tighten pipeline with right half steel sleeve pipe 1 and left half steel sleeve pipe 6.
Referring to Fig. 1 and Fig. 2, unload first connecting bolt 4 and second connecting bolt 8 during use, half-and-half split right half steel sleeve pipe 1 and left half steel sleeve pipe 6, before hanging the hole, after adjusting the verticality of standpipe, this die device is placed on suitable position, guarantee right mortar concrete steel shoe 2, left side mortar concrete steel shoe 5 is with after soffit is concordant, first connecting bolt 4 is passed the first bolt clamp 3 and the 3rd bolt clamp 10, second connecting bolt 8 passes in the second bolt clamp 7 and the 4th bolt clamp 9 and tightens, just finished the hole formwork work of hanging, just can build mortar concrete subsequently, treat that concrete dry is solid, first connecting bolt 4 and second connecting bolt 8 are unloaded, and device half-and-half splits left half steel sleeve pipe 6 and right half steel sleeve pipe 1, has just finished the whole hole construction of hanging.Repeat above-mentioned steps, just can finish a large amount of holes of hanging and construct, very simple and convenient, and dependable performance.
Claims (1)
1. a pipeline floor hangs the hole and props up die device, it is characterized in that: the last round edge face down bonding of left half steel sleeve pipe (6) is connected to a left mortar concrete steel shoe (5), the last round edge face down bonding of right half steel sleeve pipe (1) is connected to a right mortar concrete steel shoe (2), the avris that faces mutually at described right half steel sleeve pipe (1) and left half steel sleeve pipe (6) is welded with bolt clamp (3 respectively, 7,9,10), connecting bolt (4,8) by described bolt clamp (3,7,9,10) described right half steel sleeve pipe (1) and left half steel sleeve pipe (6) are combined into a cylinder that can tighten pipeline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009203090451U CN201502175U (en) | 2009-08-27 | 2009-08-27 | Hanging-hole supporting-model device for pipeline floor slab |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009203090451U CN201502175U (en) | 2009-08-27 | 2009-08-27 | Hanging-hole supporting-model device for pipeline floor slab |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201502175U true CN201502175U (en) | 2010-06-09 |
Family
ID=42453111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009203090451U Expired - Fee Related CN201502175U (en) | 2009-08-27 | 2009-08-27 | Hanging-hole supporting-model device for pipeline floor slab |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201502175U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103115737A (en) * | 2013-01-20 | 2013-05-22 | 肖栋 | Pipe welding opening detector |
CN109629575A (en) * | 2017-11-14 | 2019-04-16 | 东莞市南祥造船有限公司 | A kind of underwater operation sanding ship |
-
2009
- 2009-08-27 CN CN2009203090451U patent/CN201502175U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103115737A (en) * | 2013-01-20 | 2013-05-22 | 肖栋 | Pipe welding opening detector |
CN109629575A (en) * | 2017-11-14 | 2019-04-16 | 东莞市南祥造船有限公司 | A kind of underwater operation sanding ship |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203768803U (en) | Bridge wet joint formwork lifting device | |
CN202644997U (en) | Simple plugging device for wall-penetrating holes of wall | |
CN104947719A (en) | Basement roof post-cast strip hanging support formwork structure and post-cast strip construction method thereof | |
CN203961238U (en) | Bolt anchor slab adjustable tool formula builder's jack | |
CN105544970A (en) | Composite floor slab cast-in-place slab fixing device with bottom mold and construction method | |
CN104032945A (en) | Recyclable rebar anchor pull ring and mounting support thereof | |
CN201502175U (en) | Hanging-hole supporting-model device for pipeline floor slab | |
CN202324606U (en) | U-shaped force bearing seat | |
CN202577939U (en) | Reusable overhanging I-beam fixing device | |
CN102661035A (en) | Tool type wall connecting piece for exterior wall scaffold | |
CN202596148U (en) | Reusable cantilever scaffold anchoring compression ring | |
CN105696796A (en) | Cantilever scaffold steel girder anchoring method | |
CN204690801U (en) | Formwork erecting structure is hung in basement roof ater-casting | |
CN202509764U (en) | Template bracing structure for constructional column | |
CN204299162U (en) | To encorbelment steel I-beam anchor structure | |
CN201704954U (en) | Formwork opposite-pulling device for pouring waterproof walls | |
CN106284985A (en) | A kind of Formwork Installation Method of reserved post-cast strip | |
CN203668894U (en) | Concrete prefabricated form structure allowing rapid installation | |
CN205955193U (en) | Can have enough to meet need integral concrete beam reinforcing apparatus | |
CN213927436U (en) | Self-locking device capable of being used for turnover of overhanging I-shaped steel clamping ring | |
CN212773459U (en) | Wall pouring template applied to expansion joint side | |
CN201321721Y (en) | Constructional column no-putlog-hole template fixing device in brick and concrete structure construction | |
CN207934069U (en) | A kind of precast inspection well reserved opening circular apparatus | |
CN103089007A (en) | Cast-in-place concrete floor punching pipe seal template device and using method | |
CN103195235A (en) | Design and calculation for detachable steel plate type steel fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100609 Termination date: 20140827 |
|
EXPY | Termination of patent right or utility model |