CN201485884U - 尾矿库垂直防渗装置 - Google Patents

尾矿库垂直防渗装置 Download PDF

Info

Publication number
CN201485884U
CN201485884U CN2009201890109U CN200920189010U CN201485884U CN 201485884 U CN201485884 U CN 201485884U CN 2009201890109 U CN2009201890109 U CN 2009201890109U CN 200920189010 U CN200920189010 U CN 200920189010U CN 201485884 U CN201485884 U CN 201485884U
Authority
CN
China
Prior art keywords
mine tailing
vertical anti
seepage device
concrete
seepage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201890109U
Other languages
English (en)
Inventor
沈楼燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN2009201890109U priority Critical patent/CN201485884U/zh
Application granted granted Critical
Publication of CN201485884U publication Critical patent/CN201485884U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本实用新型公开一种尾矿库垂直防渗装置,该尾矿库垂直防渗装置包括混凝土防渗墙,混凝土防渗墙下为帷幕灌浆,混凝土防渗墙内设有灌浆管。本实用新型的优点在于:该装置形成止水隔墙及止水帷幕,隔阻尾矿库内污染液向周边地下环境渗透扩散,安全可靠、经济合理。

Description

尾矿库垂直防渗装置
技术领域
本实用新型涉及一种工(矿)业固体废物贮存、处置堆场,尤其是一种尾矿库垂直防渗装置。
背景技术
数量惊人的尾矿可直接造成环境污染,主要表现在以下方面:(1)某些尾矿直接携带超标污染物质,如放射性元素及其它有害组分;(2)选矿生产过程使用的化学药剂残存于尾矿并与其中某些组分反应,产生新的污染源;(3)自然曝化条件下,尾矿发生氧化、水解和风化等表生变化,使原本无污染的组分转变为污染组分,如有色金属矿山普通存在的某些重硫化物;(4)排入尾矿库的尾矿浆里的水分向周围地下环境渗漏,污染地下水系;(5)流经尾矿库的地表水,通过与尾矿相互作用,溶解某些有害组分并携带转移,造成大范围污染等等。
工程实践中,尾矿库防渗型式经历了从主推垂直防渗模式逐步过渡至主推水平防渗模式的发展阶段。《生活垃圾卫生填埋技术》(2004年版)将“水平防渗”规定为卫生填埋场的唯一的防渗型式,而II类尾矿库也是卫生填埋场的一种。因而从2004年始,尾矿库工程技术人员及主管的政府职能部门官员,都逐渐接受了在有环保防渗要求的尾矿库内设置水平防渗设施(主要为土工膜防渗衬层)的理念,并且已经有一些尾矿库设置了这样的土工膜防渗衬层。
水平防渗模式不仅实施质量上存在缺陷,而且还造价较高,极不经济,限制其推广运用。
发明内容
本实用新型的目的在于提供一种尾矿库垂直防渗装置,该装置克服了水平防渗存在土工膜渗漏、造价高昂等不足。
本实用新型的技术方案为:一种尾矿库垂直防渗装置,该尾矿库垂直防渗装置包括混凝土防渗墙1,混凝土防渗墙下为帷幕灌浆2,混凝土防渗墙内设有灌浆管3。
本实用新型的优点在于:该装置形成止水隔墙及止水帷幕,隔阻尾矿库内污染液向周边地下环境渗透扩散,安全可靠、经济合理。
适用范围:只有在尾矿库底部下方存在不透水层或厚的弱透水层时,并将垂直防渗装置嵌入其中一定深度。
附图说明
图1为本实用新型尾矿库垂直防渗装置平面布置示意图;
图2为本实用新型尾矿库垂直防渗装置纵剖面示意图。
具体实施方式
一种尾矿库垂直防渗装置,该尾矿库垂直防渗装置包括混凝土防渗墙1,混凝土防渗墙1轴线长度为尾矿库可利用高程对应的库边界周长;混凝土防渗墙1深度以嵌入弱风化基岩1.0m控制。墙厚0.8~1.2m,具体数值由选定的尾矿库防渗标准决定。混凝土防渗墙1下为帷幕灌浆2,混凝土防渗墙1内设2排灌浆管3,孔距0.75~1.2m;排距0.4~0.8m,具体数值以混凝土防渗墙1的厚度来控制。灌浆管3直径110mm。该装置的技术方案是“上墙下幕”综合垂直防渗,即在地基的上部覆盖层和强、中风化基岩采用塑性混凝土防渗墙,墙下为帷幕灌浆,构成垂直防渗装置。混凝土防渗墙具有施工快、省材料、防渗效果好的优点。帷幕注浆的浆材除水泥浆外也可以采用化学灌浆材料例如非碱性水玻璃,其价廉、无毒、无污染、耐久性好。

Claims (1)

1.一种尾矿库垂直防渗装置,其特征在于:该尾矿库垂直防渗装置包括混凝土防渗墙,混凝土防渗墙下为帷幕灌浆,混凝土防渗墙内设有灌浆管。
CN2009201890109U 2009-09-09 2009-09-09 尾矿库垂直防渗装置 Expired - Fee Related CN201485884U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201890109U CN201485884U (zh) 2009-09-09 2009-09-09 尾矿库垂直防渗装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201890109U CN201485884U (zh) 2009-09-09 2009-09-09 尾矿库垂直防渗装置

Publications (1)

Publication Number Publication Date
CN201485884U true CN201485884U (zh) 2010-05-26

Family

ID=42424770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201890109U Expired - Fee Related CN201485884U (zh) 2009-09-09 2009-09-09 尾矿库垂直防渗装置

Country Status (1)

Country Link
CN (1) CN201485884U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544574A (zh) * 2015-12-04 2016-05-04 中冶集团武汉勘察研究院有限公司 一种污染地下水的隔离处理方法
CN108480373A (zh) * 2018-03-27 2018-09-04 中交天航环保工程有限公司 一种场地污染源阻隔方法
CN111622206A (zh) * 2020-06-01 2020-09-04 中国地质科学院矿产综合利用研究所 一种离子型稀土防渗帷幕构筑方法
CN112343020A (zh) * 2020-10-29 2021-02-09 矿冶科技集团有限公司 用于历史遗留尾矿库的环境风险防控集成系统及方法
CN115233717A (zh) * 2022-07-27 2022-10-25 中国矿业大学(北京) 一种垂直与水平结合的尾矿库稳定结构及施工方法
CN115387369A (zh) * 2022-09-29 2022-11-25 成都理工大学 一种防渗墙与帷幕灌浆结合的柔性防渗结构及其施工方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544574A (zh) * 2015-12-04 2016-05-04 中冶集团武汉勘察研究院有限公司 一种污染地下水的隔离处理方法
CN105544574B (zh) * 2015-12-04 2018-10-02 中冶集团武汉勘察研究院有限公司 一种污染地下水的隔离处理方法
CN108480373A (zh) * 2018-03-27 2018-09-04 中交天航环保工程有限公司 一种场地污染源阻隔方法
CN111622206A (zh) * 2020-06-01 2020-09-04 中国地质科学院矿产综合利用研究所 一种离子型稀土防渗帷幕构筑方法
CN111622206B (zh) * 2020-06-01 2022-02-08 中国地质科学院矿产综合利用研究所 一种离子型稀土防渗帷幕构筑方法
CN112343020A (zh) * 2020-10-29 2021-02-09 矿冶科技集团有限公司 用于历史遗留尾矿库的环境风险防控集成系统及方法
CN115233717A (zh) * 2022-07-27 2022-10-25 中国矿业大学(北京) 一种垂直与水平结合的尾矿库稳定结构及施工方法
CN115387369A (zh) * 2022-09-29 2022-11-25 成都理工大学 一种防渗墙与帷幕灌浆结合的柔性防渗结构及其施工方法

Similar Documents

Publication Publication Date Title
CN201485884U (zh) 尾矿库垂直防渗装置
CN201334723Y (zh) 垃圾填埋场渗滤液导排及填埋气体收集系统
CN103321256A (zh) 防污染立体复合防渗屏障系统
CN102116033A (zh) 深基坑盲沟集水井降排水方法及装置
CN203583528U (zh) 泥炭质软土地层地铁车站侧墙与顶底板连接处防水构造
CN203174616U (zh) 一种粘土地基降水节水系统
CN102367672A (zh) 基于土石地基的垂直柔性屏障系统的安装方法
CN203583524U (zh) 泥炭质软土地层地铁车站环向施工缝防水构造
CN103760084B (zh) 一种垃圾填埋场防渗浆材渗滤仪
CN111101538B (zh) 一种中和酸性矿山废水的竖向工程屏障系统施工方法
CN101422782B (zh) 土壤中油类污染物的控制与清除方法
CN113863345A (zh) 一种有害物存储场的地下水清污分流处理结构及方法
CN104612210B (zh) 一种基于低影响开发的动态渗透雨水塘系统
CN111706392B (zh) 一种适用于遗留矿洞和矿井坑道的封堵及其搭建方法
CN201747404U (zh) 一种用于井下尾砂充填的封砂滤水系统
CN201436475U (zh) 水封罐虹吸管
CN111592186A (zh) 一种矿渣重金属污染源头控制屏障及其应用
CN203383316U (zh) 一种城市生活垃圾卫生填埋场渗滤液渗漏监测结构
CN101967834A (zh) 具有抗浮功能的矿浆浓缩池地下基础结构
CN206987839U (zh) 一种巷道支护棚子
CN206279542U (zh) 一种重金属尾矿防渗地下填埋库
CN105298539B (zh) 一种废弃矿井废水污染防治和避免透水事故方法
CN106049509B (zh) 一种尾矿库分隔坝结构及其施工工艺
CN203768927U (zh) 一种柔性地下防渗帷幕结构
CN2782246Y (zh) 防渗透垃圾处理场

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100526

Termination date: 20170909