The adobe scavenge unit
Technical field
The utility model belongs to the brickmaking servicing unit, especially relates to a kind of clear brick device.
Background technology
At present, in the wall body brick production process, after wall body brick is adobe by brick machine compression moulding, normally adobe is transferred on the belt conveyor from the mould plane by brick-clamping device, might adobe after brick-clamping device unclamps and brick-clamping device between form certain bonding force and cause adobe to fall, as not removing, then the adobe meeting is taken back in the die cavity by the brick-clamping device device, mould is caused damage, serious direct result is that brick machine is damaged, not only increase the maintenance capacity of equipment, improved production cost, also reduced the production efficiency of brickmaking.
Summary of the invention
The purpose of this utility model provides a kind of adobe scavenge unit, and is not only easy and simple to handle, safe and reliable, and move by procedure auto-control, improve and press brick efficient, guarantee normally carrying out of brickmaking operation, reduce cost, improve the production capacity and the quality of adobe translation effectively.
The purpose of this utility model is achieved like this: a kind of adobe scavenge unit is characterized in that: this adobe scavenge unit mainly by left cylinder, right cylinder, left fixed base plate, right fixed base plate, left connecting rod, right connecting rod, lower-left pull bar, bottom right pull bar, left swing arm, right swing arm and built-in beam, take off the brick device and form; Left side fixed base plate is the low facade plate of back segment Gao Erzhong, leading portion, offering installing hole on the left fixed base plate and installing on the left plate of bolt with the input that left fixed base plate is fixedly mounted on the adobe belt feeder, on the left surface of left fixed base plate back segment, upper left bearing pin and lower-left bearing pin are installed at interval in the upper and lower, at the middle and lower part of the left surface of left fixed base plate welding rectangle seat board, at the anterior perforate and the corresponding front axle bearing sleeve of installing of the left surface of left fixed base plate; At the perforate of the middle part of left connecting rod and the bearing holder (housing, cover) I that on its right flank, is welded accordingly, be installed among the bearing holder (housing, cover) I after on upper left bearing pin, bearing being installed, and use the snap ring locking positioning, make the middle part and the upper left bearing pin of left connecting rod hinged, the piston rod that bearing pin and left cylinder are installed in the leading section perforate of left connecting rod is hinged, the left cylinder otic placode of right side tape spool is installed in the upper end of left cylinder block, install in the front axle bearing sleeve on the into left fixed base plate also spacing after on the axle of left cylinder otic placode, bearing being installed with the snap ring locking, like this, left side cylinder piston rod is done, in the time of flexible down, the rotation accordingly of left side cylinder, at the rearward end perforate of left connecting rod and installation shaft bearing sleeve III on its right flank accordingly, into also locate built-in beam and left rod hinge connection among the bearing holder (housing, cover) III with the snap ring locking and install after on the axle of built-in beam left end section, bearing being installed; At the leading section perforate of lower-left pull bar and installation shaft bearing sleeve II on its right flank accordingly, install behind the bearing among the bearing holder (housing, cover) II and install on the lower-left bearing pin on left fixed base plate, and locate with the snap ring locking, lower-left pull bar and left fixed base plate hinge are pressed, at the rearward end perforate of lower-left pull bar and installation shaft bearing sleeve IV on its right flank accordingly, and in the bottom perforate of the riser of left swing arm and balance staff is installed, on this balance staff, install and install behind the bearing among the bearing holder (housing, cover) IV, and with snap ring locking location, so left swing arm can be done the rotation campaign corresponding to the lower-left pull bar; The riser of left side swing arm with on the left end of the level board put at right angles weld and make one, perforate on the level board of left swing arm, installing bolt is connected with the bottom of built-in beam left end section, built-in beam is the long girder steel that section is the cavity rectangle, on the upper surface of built-in beam, take off the brick device with the bolt installation, take off the brick device for brick bar clearly is set on rectangular level board, the gag lever post that collision block is equipped with at the top is installed on the rectangle seat board on the left fixed base plate, position corresponding to collision block, on the preceding bottom surface of left connecting rod, spacing spur is set, spacing to play a part; Similarly, right fixed base plate is the low facade plate of back segment Gao Erzhong, leading portion, offering installing hole on the right fixed base plate and installing on the right plate of bolt with the input that right fixed base plate is fixedly mounted on the adobe belt feeder, on the right flank of right fixed base plate back segment, upper right bearing pin and bottom right bearing pin are installed at interval in the upper and lower, at the middle and lower part of the right flank of right fixed base plate welding rectangle seat board, at the anterior perforate and the corresponding front axle bearing sleeve of installing of the right flank of right fixed base plate; At the perforate of the middle part of right connecting rod and the bearing holder (housing, cover) I ' that on its left surface, is welded accordingly, be installed among the bearing holder (housing, cover) I ' after on upper right bearing pin, bearing being installed, and use the snap ring locking positioning, make the middle part and the upper right bearing pin of right connecting rod hinged, the piston rod that bearing pin and right cylinder are installed in the leading section perforate of right connecting rod is hinged, the right cylinder otic placode of left side tape spool is installed in the upper end of right cylinder block, install in the front axle bearing sleeve on the into right fixed base plate also spacing after on the axle of right cylinder otic placode, bearing being installed with the snap ring locking, like this, right cylinder piston rod is done, in the time of flexible down, the rotation accordingly of right cylinder, at the rearward end perforate of right connecting rod and installation shaft bearing sleeve III ' on its left surface accordingly, into also locate with the snap ring locking among the bearing holder (housing, cover) III ' and install after on the axle of built-in beam right-hand member section bearing being installed, built-in beam and right connecting rod are hinged; At the leading section perforate of bottom right pull bar and installation shaft bearing sleeve II ' on its left surface accordingly, install behind the bearing among the bearing holder (housing, cover) II ' and install on the bottom right bearing pin on right fixed base plate, and locate with the snap ring locking, bottom right pull bar and right fixed base plate are hinged, at the rearward end perforate of bottom right pull bar and installation shaft bearing sleeve IV ' on its left surface accordingly, and in the bottom perforate of the riser of right swing arm and balance staff is installed, on this balance staff, install and install behind the bearing among the bearing holder (housing, cover) IV ', and with snap ring locking location, so right swing arm can be done the rotation campaign corresponding to the bottom right pull bar; The riser of right swing arm with on the right-hand member of the level board put at right angles weld and make one, perforate on the level board of right swing arm, installing bolt is connected with the bottom of built-in beam right-hand member section, the gag lever post that collision block is equipped with at the top is installed on the rectangle seat board on the right fixed base plate, position corresponding to collision block, spacing spur is set on the bottom surface of right connecting rod, spacing to play a part;
Behind the brick machine pressing unfired brick, brick-clamping device is clamped adobe and is moved to the belt feeder top from mould, and belt feeder is turned round by driven by motor simultaneously, brick-clamping device unclamps the back and rises, and adobe is fallen by deadweight, and the brick-clamping device translation is returned, this moment, clear brick mechanism started working, and left and right cylinder intake promotes to take off the brick device and does ascending motion, brick-clamping device is carried out brick clearly, after clear brick finishes, left and right cylinder exhaust, this is taken off the brick device and resets, brick-clamping device resets, and waits for the beginning of next work step.
The adobe scavenge unit that the utility model proposed, rational in infrastructure, safe and reliable, guarantee normally carrying out of brickmaking operation, reduce cost, improve the production capacity and the quality of adobe translation effectively.
Now in conjunction with the accompanying drawings and embodiments the adobe scavenge unit that the utility model proposed is described further.
Description of drawings
Fig. 1 is that the master of the adobe scavenge unit that proposes of the utility model looks schematic diagram.
Fig. 2 is that schematic diagram is looked on the left side of the adobe scavenge unit that proposes of the utility model.
Fig. 3 is the schematic perspective view of the adobe scavenge unit that proposes of the utility model.
Among Fig. 1, Fig. 2, Fig. 3: 1, left swing arm 2, left connecting rod 3, lower-left pull bar 4, left fixed base plate 5, collision block 6, left cylinder 7, balance staff 8, built-in beam 9, take off brick device 10, left cylinder otic placode 11, right connecting rod 12, right fixed base plate 13, gag lever post 14, bottom right pull bar 15, right cylinder 16, right swing arm 17, right cylinder otic placode 18, bearing holder (housing, cover) I 19, bearing holder (housing, cover) II 20, bearing holder (housing, cover) III 21, bearing holder (housing, cover) IV
Specific implementation method:
In from Fig. 1, Fig. 2, Fig. 3 as can be seen, a kind of adobe scavenge unit is characterized in that: this adobe scavenge unit mainly by left cylinder 6, right cylinder 15, left fixed base plate 4, right fixed base plate 12, left connecting rod 2, right connecting rod 11, lower-left pull bar 3, bottom right pull bar 14, left swing arm 1, right swing arm 16 and built-in beam 8, take off brick device 9 and form; Left side fixed base plate 4 is the low facade plate of back segment Gao Erzhong, leading portion, offering installing hole on the left fixed base plate 4 and installing on the left plate of bolt with the input that left fixed base plate 4 is fixedly mounted on the adobe belt feeder, on the left surface of left fixed base plate 4 back segments, upper left bearing pin and lower-left bearing pin are installed at interval in the upper and lower, at the middle and lower part of the left surface of left fixed base plate 4 welding rectangle seat board, at the anterior perforate and the corresponding front axle bearing sleeve of installing of the left surface of left fixed base plate 4; At the perforate of the middle part of left connecting rod 2 and the bearing holder (housing, cover) I 18 that on its right flank, is welded accordingly, be installed among the bearing holder (housing, cover) I18 after on upper left bearing pin, bearing being installed, and use the snap ring locking positioning, make the middle part and the upper left bearing pin of left connecting rod 2 hinged, the piston rod that bearing pin and left cylinder 6 are installed in the leading section perforate of left connecting rod 2 is hinged, the left cylinder otic placode 10 of right side tape spool is installed in the upper end of left cylinder 6 cylinder bodies, install in the front axle bearing sleeve on the into left fixed base plate 4 also spacing after on the axle of left cylinder otic placode 10, bearing being installed with the snap ring locking, like this, left side cylinder piston rod is done, in the time of flexible down, the rotation accordingly of left side cylinder 6, at the rearward end perforate of left connecting rod 2 and installation shaft bearing sleeve III20 on its right flank accordingly, and install after on the axle of built-in beam 8 left end sections, bearing being installed among the bearing holder (housing, cover) III20 and with snap ring locking location, built-in beam 8 is hinged with left connecting rod 2; At the leading section perforate of lower-left pull bar 3 and installation shaft bearing sleeve II 19 on its right flank accordingly, install behind the bearing among the bearing holder (housing, cover) II 19 and install on the lower-left bearing pin on left fixed base plate 4, and locate with the snap ring locking, lower-left pull bar 3 and left fixed base plate 4 are hinged, at the rearward end perforate of lower-left pull bar 3 and installation shaft bearing sleeve IV21 on its right flank accordingly, and in the bottom perforate of the riser of left swing arm 1 and balance staff 7 is installed, on this balance staff 7, install and install behind the bearing among the bearing holder (housing, cover) IV21, and with snap ring locking location, so left swing arm 1 is done the rotation campaign corresponding to lower-left pull bar 3; The riser of left side swing arm 1 with on the left end of the level board put at right angles weld and make one, perforate on the level board of left swing arm 1, installing bolt is connected with the bottom of built-in beam 8 left end sections, built-in beam 8 is the long girder steel of cavity rectangle for section, on the upper surface of built-in beam 8, take off brick device 9 with the bolt installation, take off brick device 9 for brick bar clearly is set on rectangular level board, the gag lever post 13 that collision block 5 is equipped with at the top is installed on the rectangle seat board on the left fixed base plate 4, position corresponding to collision block 5, on the preceding bottom surface of left connecting rod 2, spacing spur is set, spacing to play a part; Similarly, right fixed base plate 12 is the low facade plate of back segment Gao Erzhong, leading portion, offering installing hole on the right fixed base plate 12 and installing on the right plate of bolt with the input that right fixed base plate 12 is fixedly mounted on the adobe belt feeder, on the right flank of right fixed base plate 12 back segments, upper right bearing pin and bottom right bearing pin are installed at interval in the upper and lower, at the middle and lower part of the right flank of right fixed base plate 12 welding rectangle seat board, at the anterior perforate and the corresponding front axle bearing sleeve of installing of the right flank of right fixed base plate 12; At the perforate of the middle part of right connecting rod 11 and the bearing holder (housing, cover) I ' that on its left surface, is welded accordingly, be installed among the bearing holder (housing, cover) I ' after on upper right bearing pin, bearing being installed, and use the snap ring locking positioning, make the middle part and the upper right bearing pin of right connecting rod 11 hinged, the piston rod that bearing pin and right cylinder 15 are installed in the leading section perforate of right connecting rod 11 is hinged, the right cylinder otic placode 17 of left side tape spool is installed in the upper end of right cylinder 15 cylinder bodies, install in the front axle bearing sleeve on the into right fixed base plate 12 also spacing after on the axle of right cylinder otic placode 17, bearing being installed with the snap ring locking, like this, on right cylinder piston rod is done, in the time of flexible down, the rotation accordingly of right cylinder 15, at the rearward end perforate of right connecting rod 11 and installation shaft bearing sleeve III ' on its left surface accordingly, into also locate with the snap ring locking among the bearing holder (housing, cover) III ' and install after on the axle of built-in beam 8 right-hand member sections bearing being installed, built-in beam 8 is hinged with right connecting rod 11; At the leading section perforate of bottom right pull bar 14 and installation shaft bearing sleeve II ' on its left surface accordingly, install behind the bearing among the bearing holder (housing, cover) II ' and install on the bottom right bearing pin on right fixed base plate 12, and locate with the snap ring locking, bottom right pull bar 14 and right fixed base plate 12 are hinged, at the rearward end perforate of bottom right pull bar 14 and installation shaft bearing sleeve IV ' on its left surface accordingly, and in the bottom perforate of the riser of right swing arm 16 and balance staff 7 is installed, on this balance staff 7, install and install behind the bearing among the bearing holder (housing, cover) IV ', and with snap ring locking location, so right swing arm 16 can be done the rotation campaign corresponding to bottom right pull bar 14; The riser of right swing arm 16 with on the right-hand member of the level board put at right angles weld and make one, perforate on the level board of right swing arm 16, installing bolt is connected with the bottom of built-in beam 8 right-hand member sections, the gag lever post that collision block 5 is equipped with at the top is installed on the rectangle seat board on the right fixed base plate 12, position corresponding to collision block 5, on the preceding bottom surface of right connecting rod 11, spacing spur is set, spacing to play a part;
Behind the brick machine pressing unfired brick, brick-clamping device is clamped adobe and is moved to the belt feeder top from mould, and belt feeder is turned round by motor drives simultaneously, brick-clamping device unclamps the back and rises, and adobe is fallen by deadweight, and the brick-clamping device translation is returned, this moment, clear brick mechanism started working, and left and right cylinder 6,15 air inlets promote to take off the brick device and do ascending motion, each clear brick pole pair brick-clamping device carries out brick clearly, after clear brick finishes, left and right cylinder 6,15 exhausts, this is taken off the brick device and resets, brick-clamping device resets, and waits for the beginning of next work step.