CN201478772U - Cable groove of roadbed of railway - Google Patents

Cable groove of roadbed of railway Download PDF

Info

Publication number
CN201478772U
CN201478772U CN2009203057275U CN200920305727U CN201478772U CN 201478772 U CN201478772 U CN 201478772U CN 2009203057275 U CN2009203057275 U CN 2009203057275U CN 200920305727 U CN200920305727 U CN 200920305727U CN 201478772 U CN201478772 U CN 201478772U
Authority
CN
China
Prior art keywords
cell body
cable
railway
cable trough
railway bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009203057275U
Other languages
Chinese (zh)
Inventor
罗静明
杜惠忠
李溪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Huatong Boao Science and Trade Co Ltd
Original Assignee
Beijing Huatong Boao Science and Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Huatong Boao Science and Trade Co Ltd filed Critical Beijing Huatong Boao Science and Trade Co Ltd
Priority to CN2009203057275U priority Critical patent/CN201478772U/en
Application granted granted Critical
Publication of CN201478772U publication Critical patent/CN201478772U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a construction material of a railway, in particular to a cable groove of a roadbed of the railway, which comprises a groove body (10) and a cover board (20), wherein the groove body (10) is provided with a bottom board (1) and a left side wall and a right side wall (2), the groove body (10) is internally provided with a clapboard (3), and the groove body (10) is divided into a left room and a right room by the clapboard (3). The cover board (20) is matched with the groove body (10) to form the cable groove. An electricity transmission cable and a communication signal cable can be installed in the same cable groove, and are mutually separated to prevent from obvious interference. The cable groove is made of thermoplastic material or thermoplastic composite material, and has light weight, convenient construction, and good mechanical property and durability.

Description

The railway bed cable trough
Technical field
The utility model relates to a kind of railway construction goods and materials, especially relates to a kind of railway bed cable trough of the cable that places an iron railway.
Background technology
In the railway construction process, should lay power transmission cable line, communicaton and signal cable line etc. in advance, these cables generally are laid on the railway bed both sides.Be not damaged for making cable obtain better protect, cable be placed in the private cable groove.In the prior art, be used to the to place an iron railway cable trough of cable is generally coarse armored concrete product.As power transmission cable and communicaton and signal cable are placed in the same cable trough, the signal of communicaton and signal cable may be subjected to interference to a certain degree; As being placed on respectively in the different cable troughs, can increase the unnecessary work that repeats again.In addition, this cable trough product weight is big, causes labor strength big, since lacking toughness, cracky in construction.
The utility model content
Technical problem to be solved in the utility model provides and a kind ofly is used to the cable trough of power transmission cable and communicaton and signal cable that places an iron railway, and avoids the interference of power transmission cable to signal of communication as far as possible.
The technical scheme that the utility model solves the problems of the technologies described above is as follows: a kind of railway bed cable trough, comprise cell body and cover plate, described cell body have base plate and about two sidewalls, cell body inside also is provided with dividing plate, two Room about cell body is divided into are respectively applied for and lay power transmission cable and communicaton and signal cable.
The beneficial effects of the utility model are: this railway bed cable trough, can be simultaneously be layed in wherein power transmission cable and communicaton and signal cable independently about two Room, power transmission cable and communicaton and signal cable are spaced, and significantly do not disturb each other.
On the basis of technique scheme, the utility model can also be done following improvement.
Further, the bottom surface of described cell body inside is the inclined-plane, and the bottom of described sidewall and dividing plate is provided with spilled water hole.Bottom surface in the described cell body, it is near a lateral deviation height of railway, and gradient is 0~5 °.The gradient that cell body bottom surface band is certain and the spilled water hole of lower sidewall, the rainwater that helps entering in the cell body is discharged smoothly, can not gather too much immersion cable.
Further, the two ends of described cell body are respectively equipped with the tenon of protrusion and recessed mortise.Tenon and mortise can be separately positioned on the two ends of cell body base plate and sidewall, interconnect by tenon and mortise between each cable trough during installation.
Further, described cell body sidewall is provided with rib, and rib preferably is arranged at the cell body sidewall outside.Rib helps to improve the intensity of sidewall, and closely is connected with object on every side.
Further, near on the sidewall of railway one side, be provided with at least one preformed hole.The preformed hole of cell body sidewall is convenient to draw earth terminal lead wire and communicaton and signal cable lead wire.
Further, two of described cover plate and cell body sidewall tight fits.Described cover plate is provided with open hole, also is provided with anti-skidding lines.The opening of cell body covers with cover plate, makes cable trough obtain better protection, establishes open hole on the cover plate and is convenient to instrument is inserted open hole, thereby open cover plate.
Further, described cell body and cover plate are made by thermoplastic or thermoplastic composite.Adopt the cable trough of this material, in light weight, easy construction, mechanical property and good endurance, smooth, coefficient of friction is low, therefore meet the growth requirement that modern railways is built.
Description of drawings
Fig. 1 is the cross-sectional view of the utility model embodiment;
Fig. 2 is along the cutaway view of D-D line among Fig. 1;
Fig. 3 is along the cutaway view of A-A line among Fig. 1;
Fig. 4 is along the cutaway view of E-E line among Fig. 1;
Fig. 5 adds the cross-sectional view of upper cover plate for the utility model cable trough;
In the accompanying drawing, the list of parts of each label representative is as follows:
1, base plate, 2, sidewall, 3, dividing plate, 4, spilled water hole, 5, tenon, 6, mortise, 7, preformed hole, 9, rib, 10, cell body, 20, cover plate.
Embodiment
Below in conjunction with accompanying drawing principle of the present utility model and feature are described, institute gives an actual example and only is used to explain the utility model, is not to be used to limit scope of the present utility model.
The utility model railway bed cable trough adopts thermoplastic or thermoplastic composite to make, and adopts the railway bed cable trough of this material, in light weight, easy construction, mechanical property and good endurance, smooth, coefficient of friction is low, therefore meet the growth requirement that modern railways is built.
Describe the structure of a kind of embodiment of the utility model below in detail.
As shown in Figure 1, the railway bed cable trough comprises cell body 10, described cell body 10 have base plate 1 and about two sidewalls 2, cell body 10 inside also are provided with dividing plate 3.Two Room about dividing plate 3 is divided into cell body are respectively applied for and lay power transmission cable and communicaton and signal cable.Power transmission cable and communicaton and signal cable are separated by dividing plate 3, significantly do not disturb each other.According to on-the-spot needs, the Room near the railway side in the cell body 10 is wide than another chamber, and communicaton and signal cable is located at this near railway one side, and power transmission cable is located at opposite side.
The bottom surface of cell body 10 inside, promptly the upper surface of base plate 1 is the inclined-plane, and it is near a lateral deviation height of railway, and gradient is 0~5 °.With reference to Fig. 1, Fig. 2, the sidewall 2 of base plate 1 side on the low side and the bottom of dividing plate 3 are provided with spilled water hole 4.The rainwater that helps like this entering in the cell body 10 is discharged smoothly, can not gather too much immersion cable cable is caused damage.
The two ends of cell body 10 are respectively equipped with the tenon 5 of protrusion and recessed mortise 6.With reference to Fig. 2, Fig. 3, Fig. 4, tenon 5 and mortise 6 are separately positioned on the two ends of cell body base plate 1 and sidewall 2, and each cable trough connects from beginning to end during installation, and the tenon 5 of previous cable trough and the mortise 6 of next cable trough dock mutually, form good fit.
The outside of cell body sidewall 2 is provided with vertical rib 9, improving the intensity of sidewall 2, and closely is connected with object on every side.Rib 2 evenly distributes on sidewall 2, and its quantity and mutual interval can rationally be provided with according to the length of cell body, the thickness and the on-the-spot needs of sidewall.
Near on the sidewall 2 of railway one side, be provided with at least one or two or more preformed holes 7 as required, so that draw earth terminal lead wire and communicaton and signal cable lead wire etc.Decide according to on-the-spot needs the size of preformed hole and position.In the place that needs the outgoing cable line, this cable trough that preformed hole is arranged is installed, in other places, the cable trough that does not have preformed hole is installed.
As shown in Figure 5,2 tops, two side of cell body 10 are equipped with cover plate 20, and there is protuberance cover plate 20 belows, are stuck between the two side 2, form tight fit with cell body 10.For preventing that bullet train when operation air-flow from starting cover plate, every cover plate is connected with screw or by the joggle mode with the cable trough sidewall.The end face of cover plate 20 is made anti-skid design, pattern depth 2mm, and floral designs can be manufactured according to designing requirement.For ease of the unlatching of cover plate 20, two open holes can be set on the cover plate 20, so that being inserted open hole, instrument opens cover plate.
The every joint of above-mentioned railway bed cable trough can be prefabricated into 1m, 2m, 3m is long or other need size, and is end to end, is arranged on the railway shoulder.Direction per 10~20m in cable trough road along the line establishes the wide expansion joint of 2cm one, filling pitch hemp cut in the seam; Should adopt tenon to connect between other cable trough.In the place that needs the outgoing cable line, the cable trough of preformed hole is installed, in other places, the cable trough that does not have preformed hole is installed.The cover plate of a band open hole generally is installed every the 20m common cover.
The above only is preferred embodiment of the present utility model, and is in order to restriction the utility model, not all within spirit of the present utility model and principle, any modification of being done, is equal to replacement, improvement etc., all should be included within the protection range of the present utility model.

Claims (10)

1. railway bed cable trough, comprise cell body (10) and cover plate (20), described cell body (10) have base plate (1) and about two sidewalls (2), it is characterized in that, described cell body (10) inside also is provided with dividing plate (3), two Room about cell body (10) is divided into by dividing plate (3).
2. railway bed cable trough according to claim 1 is characterized in that, the inner bottom surface of described cell body (10) is the inclined-plane, and the bottom of described sidewall (2) and dividing plate (3) is provided with spilled water hole (4).
3. railway bed cable trough according to claim 2 is characterized in that, the bottom surface that described cell body (10) is inner, and it is near a lateral deviation height of railway, and gradient is 0~5 °.
4. railway bed cable trough according to claim 1 is characterized in that, the two ends of described cell body (10) are respectively equipped with the tenon (5) of protrusion and recessed mortise (6).
5. railway bed cable trough according to claim 1 is characterized in that, described cell body (10) sidewall (2) is provided with rib (9).
6. railway bed cable trough according to claim 1 is characterized in that, near on the sidewall (2) of railway one side, is provided with at least one preformed hole (7).
7. railway bed cable trough according to claim 1 is characterized in that, two sidewalls (2) tight fit of described cover plate (20) and cell body (10).
8. railway bed cable trough according to claim 7 is characterized in that, described cover plate (20) is provided with open hole.
9. railway bed cable trough according to claim 7 is characterized in that, there is anti-skidding lines on described cover plate (20) surface.
10. according to each described railway bed cable trough in the claim 1 to 9, it is characterized in that described cell body (10) is made by thermoplastic or thermoplastic composite.
CN2009203057275U 2009-07-06 2009-07-06 Cable groove of roadbed of railway Expired - Fee Related CN201478772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203057275U CN201478772U (en) 2009-07-06 2009-07-06 Cable groove of roadbed of railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203057275U CN201478772U (en) 2009-07-06 2009-07-06 Cable groove of roadbed of railway

Publications (1)

Publication Number Publication Date
CN201478772U true CN201478772U (en) 2010-05-19

Family

ID=42415029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203057275U Expired - Fee Related CN201478772U (en) 2009-07-06 2009-07-06 Cable groove of roadbed of railway

Country Status (1)

Country Link
CN (1) CN201478772U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103594983A (en) * 2013-11-29 2014-02-19 中交路桥建设有限公司 Manufacturing method for cable groove
CN109868721A (en) * 2019-03-12 2019-06-11 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of integrated precast bridge floor affiliated facility
CN110011241A (en) * 2019-04-22 2019-07-12 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of cable trough for railway bed
CN111018429A (en) * 2019-12-30 2020-04-17 中铁通信信号勘测设计院有限公司 High-strength cement light composite material, preparation method thereof and railway cable trough
CN111224368A (en) * 2019-12-02 2020-06-02 国网新疆电力有限公司阿勒泰供电公司 Miniature cable trench
CN111600274A (en) * 2015-04-06 2020-08-28 富兰克林燃油系统公司 Chamber for a fuel supply system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103594983A (en) * 2013-11-29 2014-02-19 中交路桥建设有限公司 Manufacturing method for cable groove
CN103594983B (en) * 2013-11-29 2016-04-13 中交路桥建设有限公司 A kind of manufacture method of cable trough
CN111600274A (en) * 2015-04-06 2020-08-28 富兰克林燃油系统公司 Chamber for a fuel supply system
CN109868721A (en) * 2019-03-12 2019-06-11 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of integrated precast bridge floor affiliated facility
CN110011241A (en) * 2019-04-22 2019-07-12 中国铁道科学研究院集团有限公司铁道建筑研究所 A kind of cable trough for railway bed
CN111224368A (en) * 2019-12-02 2020-06-02 国网新疆电力有限公司阿勒泰供电公司 Miniature cable trench
CN111018429A (en) * 2019-12-30 2020-04-17 中铁通信信号勘测设计院有限公司 High-strength cement light composite material, preparation method thereof and railway cable trough

Similar Documents

Publication Publication Date Title
CN201478772U (en) Cable groove of roadbed of railway
CN203256774U (en) Underground cable trench construction structure for electric engineering
CN206109879U (en) Be applicable to low circuit location space mole drainer of putting of moderate -low speed magnetic levitation
CN205224248U (en) Compound escape canal of resin
CN201533132U (en) Electric/optical cable trough and die for preparing same
KR101249300B1 (en) Cable trough
CN201607558U (en) Drainage optical cable
CN204455812U (en) A kind of embedded part structure of bridge extension joint
CN203260979U (en) Cable trench and cover plate thereof
KR101877227B1 (en) Fire Resistant Slab Using Lightweight Foamed Concrete, and Manufacturing Method thereof
KR101157098B1 (en) The Protection Plate of Underground Cable
CN2770183Y (en) Special composite moulded cable conduit covering plate
CN112864979B (en) Railway roadbed assembled cable duct
CN205604295U (en) Utility tunnel dog -house structure
CN2782816Y (en) Ceramic tile
CN209675858U (en) A kind of cable trough for railway bed
CN208136057U (en) Septic tank assembly parts
CN207039131U (en) A kind of new prefabricated field structure
CN105821904A (en) Feeding hole structure of underground comprehensive pipe gallery and construction method
KR200462745Y1 (en) Cable trough
CN104652688A (en) Wall built by using light-weight heat-insulation perforated bricks with horizontal pipeline perforating grooves
CN203787917U (en) Composite sheet material cable trench cover plate
CN204850217U (en) Heat -insulating building block
CN204571062U (en) With the body of wall that the light-duty porose insulating brick of horizontal Wire channel in building is built into
CN208638004U (en) A kind of novel cable switch box foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20110706