A kind of new prefabricated field structure
Technical field
It the utility model is related to precasting yard construction technique field, and in particular to a kind of new prefabricated field structure.
Background technology
As China promotes the dynamics of assembled architecture industry to continue to increase, increasing bridge top in highway engineering
Structure uses prefabricated construction, and the scale and quantity of precasting yard are gradually increased.At present in the precasting yard production process of building site, concrete
Vibrate, spray maintenance and gantry crane operation etc. is required for using electronic box, but traditional III grade of electronic box is often using packaged type electricity
Case, lead-out wire is longer, easily occurs the problems such as electronic box deformation, damage and exposed cable wear after being used for multiple times, and triggers safety raw
Production accident.
Utility model content
In view of the above-mentioned problems, the purpose of this utility model is to provide a kind of new prefabricated field structure so that in production process
In electronic box need not be moved, avoid the occurrence of and use electrification.
To achieve these goals, the technical solution adopted in the utility model is:
A kind of new prefabricated field structure, including the precast beam platform in precasting yard, the precasting yard are gantry crane rail model
Interior precasting yard is enclosed, the end of the precast beam platform is embedded with electronic box, remote described precast beam platform one end of the electronic box
End face be provided with an opening, the periphery of the opening is provided with built-in fitting, and the opening using the built-in fitting provided with being fixed
The electronic box chamber door of installation;Also include the external cable being embedded in advance in the precasting yard, one end of the external cable and the electricity
The inside connection of case, the other end of the external cable are connected through the gantry crane rail with two level electronic box outside the venue.
Further, a length of 45-50cm of the electronic box, a width of 90-110cm, a height of 30-40cm.
Further, the electronic box is embedded in the one or both ends of the precast beam platform.
Further, the electronic box is hollow structure, and the hollow structure is built-in with electrical equipment.
Further, electronic box arranged for interval in the precasting yard.
Further, it is additionally provided with chamber door handle on the electronic box chamber door.
Further, the distance on the bottom of the electronic box chamber door and ground is 9-12cm.
The utility model additionally provides a kind of method for arranging of described new prefabricated field structure, comprises the following steps:
(1) 50cm is respectively lengthened in the one or both ends of the precast beam platform, by assembling reinforcement, sets up inner and outer template,
Poured with together with precast beam platform concrete, as the three-level electronic box for being embedded in armored concrete platform;
(2) in precasting yard plan design process, in the underground preburied external cable of the precasting yard so that in precasting yard
One end of external cable be located inside electronic box;
(3) do not closed in end face of the electronic box away from described precast beam platform one end, reserve opening, set in opening periphery pre-
Embedded part, electronic box chamber door is fixedly mounted using built-in fitting in opening after electronic box concrete form removal.
Further, the distance on the bottom of the electronic box chamber door and ground is 10cm.
Further, in addition to after the installation electronic box chamber door on the electronic box chamber door installs case door handle.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
(1) the utility model makes electronic box not exposed by burying electronic box in the end of precast beam platform, and without mobile,
Efficiently solve traditional electronic box needs to repeat to move in work progress, easily causes electronic box deformation, damage, cable abrasion or even occurs
The problems such as with electrification, be advantageous to implement safe construction, it is ensured that Electrical Safety.
(2) the utility model by by electronic box in the precasting yard arranged for interval, adjacent precast beam platform is total to
With same electronic box, space is not only rationally make use of, also reduces cost.
Brief description of the drawings
Fig. 1 is a kind of structural representation of new prefabricated field structure of the utility model embodiment;
Fig. 2 is the front view of precast beam platform in a kind of new prefabricated field structure of the utility model embodiment;
Fig. 3 is the front view of electronic box in a kind of new prefabricated field structure of the utility model embodiment.
In figure, 1- external cables, 2- electronic boxs, 3- precast beam platforms, 31- the first precast beam platforms, the precast beams of 32- second
Platform, the precast beam platforms of 33- the 3rd, 4- gantry crane rails, 5- electronic box chamber doors, 6- chamber door handles, 7- built-in fittings.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
It should be noted that when component is referred to as " being fixed on " another component, it can be directly on another component
Or there may also be component placed in the middle.When a component is considered as " connection " another component, it can be directly connected to
To another component or it may be simultaneously present component placed in the middle.When a component is considered as " being arranged at " another component, it
Can be set directly on another component or may be simultaneously present component placed in the middle.Term as used herein is " vertical
", " horizontal ", "left", "right" and similar statement for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to technology of the present utility model
The implication that the technical staff in domain is generally understood that is identical.It is simply in term used in the description of the present utility model herein
The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include
The arbitrary and all combination of one or more related Listed Items.
Embodiment
Such as Fig. 1-Fig. 3, a kind of new prefabricated field structure, including the precast beam platform 3 in precasting yard, the precasting yard is dragon
Precasting yard in the range of gantry crane track 4, the end of the precast beam platform 3 are embedded with electronic box 2, the electronic box 2 away from described
The end face of the one end of precast beam platform 3 is provided with an opening, and the periphery of the opening is provided with built-in fitting 7, and the opening is provided with profit
The electronic box chamber door 5 being fixedly mounted with the built-in fitting 7.The electronic box 2 is hollow structure, and the hollow structure, which is built-in with, electrically to be set
Standby (not shown).Also include the external cable 1 being embedded in advance in the precasting yard in this new prefabricated field structure, it is described external
One end of cable 1 is connected with the electrical equipment inside the electronic box 2, and the other end of the external cable 1 passes through the straddle truck
Track 4 is connected with two level electronic box outside the venue.
Further, a length of 45-50cm of the electronic box 2, a width of 90-110cm, a height of 30-40cm, passes through rational chi
Very little design, electronic box 2 is set to be embedded in well in the end of precast beam platform 3, and can makes the space inside electronic box 2 put enough
Put electrical equipment.In the present embodiment, electronic box 2 is preferably dimensioned to be:Long 45cm, wide 100cm, high 40cm.Meanwhile the electronic box case
Chamber door handle 6 is additionally provided with door 5, in order to open electronic box chamber door 5.
Further, the electronic box 2 arranged for interval in the precasting yard, such as three precast beams of the same row in Fig. 1
In platform 3, the electronic box 2 on the first precast beam platform 31 is located at left end, then the electronic box 2 on the second precast beam platform 32 is located at the right side
Hold, the electronic box 2 on the 3rd precast beam platform 33 is located at left end again so that adjacent precast beam platform 3 can share same electronic box
2, to reach reasonable utilization space, and reduce cost.And because two neighboring precast beam platform 3 can share an electronic box 2, outside
The length for connecing cable 1 covers two neighboring precast beam platform 3 enough, therefore the electronic box 2 can be embedded in the precast beam platform 3
One or both ends in, depending on the concrete condition of precasting yard.In the precasting yard of the present embodiment, electronic box 2 is existing be embedded in it is described
In one end of precast beam platform 3, also have and be embedded in the both ends of the precast beam platform 3.
Further, it is described in order to prevent electronic box 2 from making moist and electronic box 2 is easily intake when the set location of electronic box chamber door 5 is too low
The bottom of electronic box chamber door 5 and the distance on ground elect 9-12cm as, are preferably 10cm in the present embodiment.
A kind of method for arranging of described new prefabricated field structure of the utility model, comprises the following steps:
(1) 50cm is respectively lengthened in the one or both ends of the precast beam platform 3, by assembling reinforcement, sets up inner and outer template,
Poured with together with the concrete of precast beam platform 3, as the electronic box 2 for being embedded in armored concrete platform, i.e. three-level electronic box.
(2) in precasting yard design process, in the underground preburied external cable 1 of the precasting yard so that in precasting yard
One end of external cable 1 is located inside electronic box 2.
(3) end face of the electronic box 2 away from described one end of precast beam platform 3 is not closed, and reserves opening, is set in opening periphery pre-
Embedded part 7, electronic box chamber door 5 is fixedly mounted using built-in fitting 7 in opening after the concrete form removal of electronic box 2, the electronic box chamber door 5
The distance on bottom and ground is 10cm or so, can elect 9-12cm as, is preferably 10cm in the present embodiment.
(4) the installs case door handle 6 on the electronic box chamber door 5.
The utility model makes electronic box 2 not exposed by burying electronic box 2 in the end of precast beam platform 3, and without mobile,
Efficiently solve traditional electronic box needs to repeat to move in work progress, easily causes electronic box deformation, damage, cable abrasion or even occurs
The problems such as with electrification, be advantageous to implement safe construction, it is ensured that Electrical Safety.The utility model also by by electronic box 2 described
Arranged for interval in precasting yard, adjacent precast beam platform 3 is shared same electronic box 2, not only rationally make use of space, also drop
Low cost.
Described above is the detailed description for the preferable possible embodiments of the utility model, but embodiment is not limited to
Patent claim of the present utility model, the equal change or modification completed under the technical spirit suggested by all the utility model
Change, all should belong to the utility model and cover the scope of the claims.