CN201473274U - Roof panel transportation system - Google Patents
Roof panel transportation system Download PDFInfo
- Publication number
- CN201473274U CN201473274U CN2009201869771U CN200920186977U CN201473274U CN 201473274 U CN201473274 U CN 201473274U CN 2009201869771 U CN2009201869771 U CN 2009201869771U CN 200920186977 U CN200920186977 U CN 200920186977U CN 201473274 U CN201473274 U CN 201473274U
- Authority
- CN
- China
- Prior art keywords
- wind
- resistant column
- track
- roof boarding
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a roof panel transportation system, comprising a wind-resistant column, a winch and a wire rope, wherein the wind-resistant column is provided with a rail parallel to the wind-resistant column; the rail is provided with a conveying trolley which can move along the rail and is provided with a loading bearing frame connected with the conveying trolley; the top of the wind-resistant column is provided with a top block; the bottom of the wind-resistant column is provided with a bottom pulley; one end of the wire rope is connected with the conveying trolley and the other end thereof is connected with the winch through the top block and the bottom pulley. Compared with the prior art, the roof panel transportation system sets the rail on the wind-resistant column, adopts a pulley winding and hoisting system, and uses the wind-resistant column to directly transport the roof panels to the roof, thus having simple structure, improving the efficiency, preventing the roof panels from being damaged in the transportation process, and ensuring the safety of the construction workers.
Description
Technical field
The utility model relates to construction vehicle, particularly a kind of roof boarding transport systems.
Background technology
At present whole roof boarding or overlap joint roof boarding are risen on the roof from ground, oblique rollering steel silk rope normally is set as slideway, adopt and manually roof boarding is moved on the roof, in the process that promotes, roof boarding and steel wire slideway friction may destroy the roof boarding coating, influence the service life of roof boarding, and personnel exert oneself inhomogeneous, cause easily bending, distortion, hard defects take place in the roof boarding lifting process, influence the service life and the water resistance of roofing; Personnel's safety can not guarantee that labour intensity is big, and work efficiency is low.
The utility model content
The utility model technical issues that need to address provide a kind of roof boarding transport systems, and to reach safety under the situation of not damaging roof boarding, fast speed is transported to roof boarding the purpose on roof.
Be that a kind of roof boarding transport systems comprises wind-resistant column, winch, steel rope in order to solve the problems of the technologies described above the technical solution of the utility model; Described wind-resistant column is provided with the track parallel with wind-resistant column, what track was provided with orbital motion carries the fortune dolly, the described fortune dolly of carrying is provided with and carries fortune dolly bonded assembly dress bolster, described wind-resistant column top is provided with top block, the bottom of wind-resistant column is provided with end pulley, described steel rope one end with carry the fortune dolly and be connected, an other end passes through top block, end pulley is connected with winch.
Described track is stuck in the track jig, and described track jig is fixed on first clamping plate by attaching parts, and first clamping plate are captiveed joint with wind-resistant column by second clamping plate.
The described fortune dolly of carrying is made up of two groups of wheels and vehicle body, and the wheel of carrying the fortune dolly is stuck in the track, and vehicle body is connected with steel rope.
The utility model compared with prior art is provided with track on wind-resistant column, adopt pulley elevator elevator system, utilize wind-resistant column that roof boarding directly is transported to the roof, simple in structure, improved efficient, prevent that roof boarding from transporting the damage in the process, guaranteed workmen's safety.
Description of drawings;
Below in conjunction with the drawings and specific embodiments the utility model is described in further details
Fig. 1 is the utility model structural representation;
Fig. 2 puies forward fortune dolly and dress bolster connection diagram for the utility model;
Fig. 3 is the utility model track jig and wind-resistant column connection diagram;
In Fig. 1-3,1, wind-resistant column, 2, track, 3, the track jig, 4, steel rope, 5, carry the fortune dolly, 6, the dress bolster, 7, top block, 8, end pulley, 9, roof boarding, 10, attaching parts, 11, second clamping plate, 12, first clamping plate.
The specific embodiment
As Figure 1-3, a kind of roof boarding transport systems, comprise the wind-resistant column 1 that is arranged on the building, wind-resistant column 1 is provided with the track 2 parallel with wind- resistant column 1, and 2 are provided with along what track 2 moved and carry fortune dolly 5 on the track, carry on the fortune dolly 5 and be provided with and carry fortune dolly 5 bonded assemblys dress bolster 6, wind-resistant column 1 top is provided with top block 7, and the bottom of wind-resistant column 1 is provided with end pulley 8, carries fortune dolly 5 and is connected with an end of steel rope 4, steel rope 4 other ends are by top block 7, and end pulley 8 is connected with winch.Track 2 is stuck in the track jig 3, and described track jig 3 is fixed on first clamping plate 12 by attaching parts 10, and first clamping plate 12 are by second clamping plate 11 and wind-resistant column 1 clamp fitting.Carry fortune dolly 5 and be made up of two groups of wheels and vehicle body, the wheel of carrying the fortune dolly is stuck in the track, and vehicle body is connected with steel rope 4.
When needs transportation roof boarding 9, roof boarding 9 is placed on the dress bolster 6, start winch, steel rope 4 is carried fortune dolly 5 by end pulley 7 and top block 8 drives and is moved up along track 2, and roof boarding 9 is transported on the roof.
Claims (3)
1. a roof boarding transport systems comprises wind-resistant column (1), winch, steel rope (4); It is characterized in that: described wind-resistant column (1) is provided with the track (2) parallel with wind-resistant column (1), track (2) is provided with along carrying of track (2) motion and transports dolly (5), the described fortune dolly of carrying is provided with and carries fortune dolly (5) bonded assembly dress bolster (6), described wind-resistant column (1) top is provided with top block (7), the bottom of wind-resistant column (1) is provided with end pulley (8), described steel rope (4) one ends with carry fortune dolly (5) be connected, an other end is by top block (7), and end pulley (8) is connected with winch.
2. a kind of roof boarding transport systems according to claim 1, it is characterized in that: described track (2) is stuck in the track jig (3), described track jig (3) is fixed on first clamping plate (12) by attaching parts (10), and first clamping plate (12) are captiveed joint with wind-resistant column (1) by second clamping plate (11).
3. a kind of roof boarding transport systems according to claim 1 is characterized in that: the described fortune dolly (5) of carrying is made up of two groups of wheels and vehicle body, and the wheel of carrying fortune dolly (5) is stuck in the track, and vehicle body is connected with steel rope (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201869771U CN201473274U (en) | 2009-08-14 | 2009-08-14 | Roof panel transportation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201869771U CN201473274U (en) | 2009-08-14 | 2009-08-14 | Roof panel transportation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201473274U true CN201473274U (en) | 2010-05-19 |
Family
ID=42409518
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201869771U Expired - Fee Related CN201473274U (en) | 2009-08-14 | 2009-08-14 | Roof panel transportation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201473274U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103552951A (en) * | 2013-09-23 | 2014-02-05 | 江卫青 | Mechanism for lifting by building column |
CN106144675A (en) * | 2016-08-19 | 2016-11-23 | 广船国际有限公司 | A kind of ro-ro passenger ship cargo instrument |
CN110714581A (en) * | 2019-10-22 | 2020-01-21 | 中国一冶集团有限公司 | Construction device and method for transferring purlines at far ends of overhanging trusses |
CN112408236A (en) * | 2020-12-06 | 2021-02-26 | 徐晓丹 | Steel conveyer is used in bridge engineering construction |
-
2009
- 2009-08-14 CN CN2009201869771U patent/CN201473274U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103552951A (en) * | 2013-09-23 | 2014-02-05 | 江卫青 | Mechanism for lifting by building column |
CN106144675A (en) * | 2016-08-19 | 2016-11-23 | 广船国际有限公司 | A kind of ro-ro passenger ship cargo instrument |
CN110714581A (en) * | 2019-10-22 | 2020-01-21 | 中国一冶集团有限公司 | Construction device and method for transferring purlines at far ends of overhanging trusses |
CN112408236A (en) * | 2020-12-06 | 2021-02-26 | 徐晓丹 | Steel conveyer is used in bridge engineering construction |
CN112408236B (en) * | 2020-12-06 | 2021-06-08 | 中铁十九局集团轨道交通工程有限公司 | Steel conveyer is used in bridge engineering construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201473274U (en) | Roof panel transportation system | |
CN201377184Y (en) | Ultra-long roofing contour plate vertical lifting transporting device | |
CN205652760U (en) | Automatic change automobile body transfer chain | |
CN202953738U (en) | Gantry crane | |
CN103527243B (en) | The inclined shaft hoisting transportation system of subway work and method to set up | |
CN210561885U (en) | Mechanical trolley for installing highway corrugated beam steel guardrail | |
CN202131023U (en) | Two-beam bridge crane | |
CN201980880U (en) | Hoisting device | |
CN102820744A (en) | Method and device for mounting rotor of large-sized synchronous motor | |
CN201559671U (en) | Automatic decoupling device for mine car | |
CN205855846U (en) | A kind of many fulcrums electric hang crane | |
CN110758421B (en) | Vehicle maintenance vehicle suitable for air rail transit system | |
CN210566648U (en) | Installation device for directional sliding of large pipeline in limited space | |
CN204873574U (en) | Hoist girder construction of stretching out and drawing back | |
CN202782831U (en) | Lorry hydraulic full-automatic folding frame lifting tail board system | |
CN203373044U (en) | Telegraph pole loading and unloading device for flat car | |
CN202131027U (en) | Single-girder lifting hook portal crane | |
CN204778464U (en) | Shield constructs gantry crane for subway | |
CN201682219U (en) | Multifunctional special vehicle for electric wire construction | |
CN204982682U (en) | System that moves from north to south of steel purlin girder segment section | |
CN201999679U (en) | Automatic reciprocating and looping system of electric block | |
CN205205674U (en) | Top of tower hoist and mount system | |
CN104058236A (en) | Efficient original wool feeding device with traveling crane | |
CN204323812U (en) | Admission machine unloads coil of strip mechanism automatically | |
CN104229636A (en) | Heapstead cantilever bridge crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100519 Termination date: 20120814 |