CN201466576U - Special pulley for remote access equipotentially - Google Patents

Special pulley for remote access equipotentially Download PDF

Info

Publication number
CN201466576U
CN201466576U CN2009201256630U CN200920125663U CN201466576U CN 201466576 U CN201466576 U CN 201466576U CN 2009201256630 U CN2009201256630 U CN 2009201256630U CN 200920125663 U CN200920125663 U CN 200920125663U CN 201466576 U CN201466576 U CN 201466576U
Authority
CN
China
Prior art keywords
bolt
insulation board
insulation
insulating board
safeguard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201256630U
Other languages
Chinese (zh)
Inventor
程登永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianshengqiao Bureau of Extra High Voltage Power Transmission Co
Original Assignee
Tianshengqiao Bureau of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianshengqiao Bureau of Extra High Voltage Power Transmission Co filed Critical Tianshengqiao Bureau of Extra High Voltage Power Transmission Co
Priority to CN2009201256630U priority Critical patent/CN201466576U/en
Application granted granted Critical
Publication of CN201466576U publication Critical patent/CN201466576U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses a special pulley for remote access equipotentially, which has the structure that an insulating board B (11) is connected with an insulating board A (1) through a bolt A (2) and a bolt B (3), the bolt A (2) passes through and fixes an aluminum pulley wheel 7 between the insulating board B (11) and the insulating board A (1); an insulating board C (13) is connected with the insulating board A (1) through a bolt C (4), a bolt D (5) and a bolt E (6), and the bolt D (5) passes through and fixes an insulating pulley wheel 8 between the insulating board C (11) and the insulating board A (1); an insulating safety guard (9) is movably connected with the insulating board B (11) through a bolt F (10), and the length of the insulating safety guard (9) is larger than the distance between the bolt F (10) and the bolt C (4); one end of a spring (16) is fixed on the insulating board B (11) through a bolt G (14), and the other end is fixed on the insulating safety guard (9) through a bolt H (15). The utility model has high safety and easy access for equipotential operation.

Description

A distant place enters the special-purpose coaster of equipotential
Technical field
The utility model relates to the live line working technical field, relates in particular to an a kind of distant place and enters the special-purpose coaster of equipotential.
Background technology
At present, it is more that various electric pressure live line working enter equipotential method of operation, but operative employee's utensil is less relatively, more tower such as compact tower are particularly arranged, equate to take these methods can't satisfy enough safe distances in cat head tower, the wineglass tower, therefore need enter from " distant place " of distance body of the tower certain distance.So-called " distant place enters " is exactly from climbing to the insulator string side along lead again on the lead and carry out operation with hanging indigo plant (chair lift) or crank arm hard ladder upward behind lead, being sitting in apart from the place beyond the insulator string 1.5m along line direction.For the compact type tower window, when conductor wire end coaster and wire clamp centre distance are 5.5m, take advantage of hanging basket " distant place enters " equipotential can guarantee that operating personnel's minimum combination gap is far longer than 4m, to guarantee the safety of operation.The method can be applicable to phase and the various towers of 220kV circuit in cat head tower, the wineglass tower equally.At present, when ultra-high-tension power transmission line enters equal potential working, all adopt common block mostly, therefore have bigger task difficulty and danger.
Summary of the invention
The purpose of this utility model be to overcome above-mentioned shortcoming and provide a kind of safe, enter equal potential working and be easy to a distant place and enter the special-purpose coaster of equipotential.
A distant place of the present utility model enters the special-purpose coaster of equipotential, comprise insulation board A, insulation board B, insulation board C, aluminium pulley, insulating block and insulation safeguard, wherein: insulation board B is connected with insulation board A by bolt A and bolt B, and bolt A passes the aluminium pulley and is fixed between insulation board B and the insulation board A; Insulation board C is connected with insulation board A by bolt C, bolt D and bolt E, and bolt D passes insulating block and is fixed between insulation board C and the insulation board A; The insulation safeguard is movably connected by bolt F and insulation board B, and its length is greater than the distance between bolt F and the bolt C; Spring one end is fixed on by bolt G that insulation board B goes up, the other end is fixed on the insulation safeguard by bolt H.
An above-mentioned distant place enters the special-purpose coaster of equipotential, and wherein: the insulation safeguard is provided with recess, and C cooperates with bolt.
The utility model is compared with prior art, has the following advantages, as can be known from the above technical solutions, after opening coaster insulation safeguard, the aluminium pulley hangs on the lead, and insulating block is used for placing the lifting rope, implements a distant place on the lead safely and enters the equipotential operation thereby can hang over easily.Under the less situation of tower head size, can directly enter equipotential carry out live line working tower and circuit, " distant place the enters equipotential " mode that makes is further popularized, for the development of hot line maintenance technology provides more supports.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the vertical view of Fig. 1.
Mark among the figure:
1, insulation board A, 2, bolt A, 3, bolt B, 4, bolt C, 5, bolt D, 6, bolt E, 7, aluminium pulley, 8, insulating block, 9, the insulation safeguard, 10, bolt F, 11, insulation board B, 12, handle hole, 13, insulation board C, 14, bolt G, 15, bolt H, 16, spring.
Embodiment
Below in conjunction with accompanying drawing and preferred embodiment, to enter embodiment, structure and the feature of the special-purpose coaster of equipotential according to the distant place that the utility model proposes, describe in detail as after.
Referring to Fig. 1-2, a distant place enters the special-purpose coaster of equipotential, comprise insulation board A1, insulation board B11, insulation board C13, aluminium pulley 7, insulating block 8 and insulation safeguard 9, wherein: insulation board B11 is connected with insulation board A1 by bolt A2 and bolt B 3, and bolt A2 passes aluminium pulley 7 and is fixed between insulation board B11 and the insulation board A1; Insulation board C13 is connected with insulation board A1 by bolt C4, bolt D5 and bolt E6, and bolt D5 passes insulating block 8 and is fixed between insulation board C13 and the insulation board A1; Insulation safeguard 9 is movably connected by bolt F10 and insulation board B11, so that insulation safeguard 9 is that rotate arbitrarily in the axle center with bolt F10, its length is greater than the distance between bolt F10 and the bolt C4, thereby assurance bolt C4 can block insulation safeguard 9 to stop its rotation; Spring 16 provides power for the revolution of insulation safeguard 9, and spring 16 1 ends are fixed on by bolt G14 that insulation board B11 goes up, the other end is fixed on the insulation safeguard 9 by bolt H15.
Insulation safeguard 9 is provided with recess, and C4 cooperates with bolt, so that bolt C4 stops insulation safeguard 9 to rotate better.
During use: place on the handle hole 12 with a little rope or action bars, insulation safeguard 9 is rotated around bolt F10, thereby manually push insulation safeguard 9 aside, afterwards lead is put on the aluminium pulley 7 along the breach between insulation board B11, the insulation board C13, whole coaster is hung on the lead.Unclamp insulation safeguard 9, under the effect of spring 16 power, insulation safeguard 9 meeting auto-closings, and be stopped at bolt C4 position, to prevent that in the course of work, lead skids off coaster.Transmit rope and pass,, realize the transmission up and down of article by the rotation of insulating block 8 from insulating block 8 and the space in the middle of the bolt C4.In operating process, can adjust the position of coaster on lead by the rotation of aluminium pulley 7.After operation is intact, the action that need repeat to open, the safeguard 9 that will insulate is opened, and makes coaster break away from lead.
The above, it only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, any technical solutions of the utility model content that do not break away from,, all still belong in the scope of technical solutions of the utility model any simple modification, equivalent variations and modification that above embodiment did according to technical spirit of the present utility model.

Claims (2)

1. a distant place enters the special-purpose coaster of equipotential, it is characterized in that: comprise insulation board A (1), insulation board B (11), insulation board C (13), aluminium pulley (7), insulating block (8) and insulation safeguard (9), wherein: insulation board B (11) is connected with insulation board A (1) by bolt A (2) and bolt B (3), and bolt A (2) passes aluminium pulley 7 and is fixed between insulation board B (11) and the insulation board A (1); Insulation board C (13) is connected with insulation board A (1) by bolt C (4), bolt D (5) and bolt E (6), and bolt D (5) passes insulating block 8 and is fixed between insulation board C (13) and the insulation board A (1); Insulation safeguard (9) is movably connected by bolt F (10) and insulation board B (11), and its length is greater than the distance between bolt F (10) and the bolt C (4); Spring (16) one ends are fixed on by bolt G (14) that insulation board B (11) goes up, the other end is fixed on the safeguard 9 that insulate by bolt H (15).
2. a distant place as claimed in claim 1 enters the special-purpose coaster of equipotential, and it is characterized in that: insulation safeguard (9) is provided with recess, cooperates with bolt C (4).
CN2009201256630U 2009-08-25 2009-08-25 Special pulley for remote access equipotentially Expired - Fee Related CN201466576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201256630U CN201466576U (en) 2009-08-25 2009-08-25 Special pulley for remote access equipotentially

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201256630U CN201466576U (en) 2009-08-25 2009-08-25 Special pulley for remote access equipotentially

Publications (1)

Publication Number Publication Date
CN201466576U true CN201466576U (en) 2010-05-12

Family

ID=42393923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201256630U Expired - Fee Related CN201466576U (en) 2009-08-25 2009-08-25 Special pulley for remote access equipotentially

Country Status (1)

Country Link
CN (1) CN201466576U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013645A (en) * 2010-11-18 2011-04-13 重庆市电力公司江北供电局 Hauling cable positioning labor-saving guide wheel
CN102064491A (en) * 2010-10-25 2011-05-18 河北省电力公司超高压输变电分公司 High-altitude operation device applied to high-altitude operation
CN102136693A (en) * 2010-12-28 2011-07-27 中国南方电网有限责任公司超高压输电公司百色局 Method and device for realizing long-distance equal electric potential access of winch hanging basket guide rail
CN102185263A (en) * 2011-05-17 2011-09-14 福建省电力有限公司泉州电业局 Travelling wheels for travelling of live conductor
CN102496886A (en) * 2011-12-02 2012-06-13 衡水供电公司 Control device of transfer rope
CN102623926A (en) * 2012-03-29 2012-08-01 中国南方电网有限责任公司超高压输电公司百色局 Distant equipotential tackle and method for realizing charged equipotential access by using same
CN103626042A (en) * 2012-08-21 2014-03-12 向天裕 Cableway transport lifting device
WO2015123260A1 (en) * 2014-02-11 2015-08-20 Classic Connectors Electrical transmission line repair apparatus
CN102969671B (en) * 2012-10-30 2016-03-16 辽宁省电力有限公司盘锦供电公司 Equipotential outlet trolley for double bundle conductor
WO2016061594A3 (en) * 2014-10-14 2016-07-07 Classic Connectors Electrical transmission line repair device

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102064491A (en) * 2010-10-25 2011-05-18 河北省电力公司超高压输变电分公司 High-altitude operation device applied to high-altitude operation
CN102064491B (en) * 2010-10-25 2013-10-23 国家电网公司 High-altitude operation device applied to high-altitude operation
CN102013645A (en) * 2010-11-18 2011-04-13 重庆市电力公司江北供电局 Hauling cable positioning labor-saving guide wheel
CN102013645B (en) * 2010-11-18 2012-10-31 重庆市电力公司江北供电局 Hauling cable positioning labor-saving guide wheel
CN102136693B (en) * 2010-12-28 2013-01-02 中国南方电网有限责任公司超高压输电公司百色局 Method and device for realizing long-distance equal electric potential access of winch hanging basket guide rail
CN102136693A (en) * 2010-12-28 2011-07-27 中国南方电网有限责任公司超高压输电公司百色局 Method and device for realizing long-distance equal electric potential access of winch hanging basket guide rail
CN102185263A (en) * 2011-05-17 2011-09-14 福建省电力有限公司泉州电业局 Travelling wheels for travelling of live conductor
CN102496886A (en) * 2011-12-02 2012-06-13 衡水供电公司 Control device of transfer rope
CN102496886B (en) * 2011-12-02 2014-08-13 国家电网公司 Control device of transfer rope
CN102623926A (en) * 2012-03-29 2012-08-01 中国南方电网有限责任公司超高压输电公司百色局 Distant equipotential tackle and method for realizing charged equipotential access by using same
CN102623926B (en) * 2012-03-29 2014-09-17 中国南方电网有限责任公司超高压输电公司百色局 Distant equipotential tackle and method for realizing charged equipotential access by using same
CN103626042A (en) * 2012-08-21 2014-03-12 向天裕 Cableway transport lifting device
CN102969671B (en) * 2012-10-30 2016-03-16 辽宁省电力有限公司盘锦供电公司 Equipotential outlet trolley for double bundle conductor
WO2015123260A1 (en) * 2014-02-11 2015-08-20 Classic Connectors Electrical transmission line repair apparatus
US9761960B2 (en) 2014-02-11 2017-09-12 Classic Connectors Electrical transmission line repair apparatus
WO2016061594A3 (en) * 2014-10-14 2016-07-07 Classic Connectors Electrical transmission line repair device
US9577354B2 (en) 2014-10-14 2017-02-21 Classic Connectors, Inc. Electrical transmission line repair device

Similar Documents

Publication Publication Date Title
CN201466576U (en) Special pulley for remote access equipotentially
CN204230457U (en) Universal connector earth wire operation rod
CN203553738U (en) Portable simple crossing frame for power distribution network
CN203660415U (en) Wire lifting device
CN201038652Y (en) Unipod insulated combined suspending ladder
CN205565034U (en) A earth connection shutting dropout prevention means that is used for transmission line and transformer substation's electric power wire
CN103532042B (en) A kind of portable simple crossing frame of power distribution network
CN204609743U (en) With the aluminium alloys hanging ladder of Self-enclosing structure
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN101378153A (en) Diverter for grounding wire
CN102704828A (en) Multifunctional hook ladder
CN205622144U (en) Portable transmission line overhead ground wire elevating gear
CN203800478U (en) Horizontal over-current sliding seat
CN203932808U (en) Replacing insulator under electrified wire lifting device
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit
CN202431235U (en) Lifting device for power head drill
CN104947716A (en) Cover plate special for electric power
CN204538618U (en) A kind of cable clip making cable movement on steel strand wire
CN204720888U (en) Portable power distribution less important work platform
CN204302555U (en) One is exempted to step on bar Optical hanger and is added hang device
CN201332246Y (en) Large-tonnage conducting wire lifter
CN204402335U (en) A kind of strain insulator Special maintenance tool
CN204243620U (en) A kind of pre-twisting type overhang installation wire lifting device
CN207053062U (en) Releasing pulley hanger
CN104656218A (en) Device and method for additionally hanging optical fiber cable hook without pole climbing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100512

Termination date: 20110825