CN201459609U - Oblique crossing box beam bridge girder erection machine - Google Patents
Oblique crossing box beam bridge girder erection machine Download PDFInfo
- Publication number
- CN201459609U CN201459609U CN2009201275862U CN200920127586U CN201459609U CN 201459609 U CN201459609 U CN 201459609U CN 2009201275862 U CN2009201275862 U CN 2009201275862U CN 200920127586 U CN200920127586 U CN 200920127586U CN 201459609 U CN201459609 U CN 201459609U
- Authority
- CN
- China
- Prior art keywords
- walking
- crossbeam
- anterior
- rail
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
An oblique crossing box beam bridge girder erection machine comprises two parallel main beams. The main beams are connected with a front transverse beam and a tail door-shaped transverse beam to form a rectangular frame, a middle walking transverse beam and a front walking transverse beam are arranged below the main beams, the lower end of the front walking transverse beam is provided with a front transverse walking wheel, the lower end of the middle walking transverse beam is provided with two middle walking wheels, and the front walking wheel and the middle walking wheels can slide on corresponding steel tracks. The front walking transverse beam and the middle walking wheels are improved and adjusted on the basis of the existing forming orthogonal box beam bridge girder erection machine, and after being improved, the bridge girder erection machine keeps stability in horizontal and vertical directions and can obliquely transversely walk on the steel tracks.
Description
Technical field
The utility model relates to a kind of bridge formation machine, is specifically related to a kind of oblique box beam bridge formation machine that can adapt to the oblique beam bridge, belongs to building engineering field.
Background technology
In bridge construction, there is the erection construction of precast beam in a large number at present, in the shortening construction cycle that thus can be bigger, reduce the input of working measure, so large-scale hanging device such as bridge formation machine adopted in a large number in this type of engineering.The bridge formation machine that uses in highway and railway bridge erecting operation mainly is made up of the leading beam of trussed construction and the configuration walking crossbeam that plays crane and be fixed on below the girder thereon, and, assembly unit speed simple in structure with it is widely used soon.
Because the general employing of prefabricated beam bridge is the quadrature form, now present bridge formation machine is also many to be designed according to this condition, as CN2250972 disclosed " light bridge formation machine ", its primary structure is for adopting the assembly unit of more piece truss sheet, bridge formation machine fuselage is connected to stiff rectangular frame by two vertical girders and anterior crossbeam, afterbody door shape crossbeam, middle part and anterior walking crossbeam are set respectively under two vertical girders, and all there is initiatively travelling wheel at walking crossbeam two ends, under two vertical girder afterbodys supporting leg are set respectively; Two girder tops respectively are provided with a vertical rail, and two vertical shift dollies are arranged on it, and a traversing lifting dolly is arranged on every vertical shift dolly.This bridge formation machine aims at quadrature box girder bridge design, and its walking crossbeam must can only set up the quadrature box girder bridge with two vertical girder is vertical installs, and can't finish setting up of oblique beam bridge.When setting up oblique case beam, need the bridge formation function oblique traversing, therefore must undergo technological transformation, still the bridge formation machine, if in order to adapt to setting up of oblique beam bridge, the special-purpose bridge formation machine of custom-made or adopt situation such as interim bracing frame will inevitably significantly increase the engineering cost input.
The utility model content
Can't finish the deficiency that the obliquely-intersected beams crane span structure is established at bridge formation machine of the prior art, the purpose of this utility model provides a kind of by existing moulding bridge formation machine is rationally transformed, can make the bridge formation machine oblique traversing, keep the level and the vertical direction of bridge formation machine stable simultaneously, and the low oblique box beam bridge formation machine of input cost.
The technical solution of the utility model is: a kind of oblique box beam bridge formation machine, comprise two parallel girders, the door shape crossbeam of girder and anterior crossbeam, afterbody is connected to form rectangular frame, below girder, be provided with middle part walking crossbeam and anterior walking crossbeam, the crossbeam lower end of forwardly walking is provided with the front cross travelling wheel, walking crossbeam lower end, middle part is provided with two middle part travelling wheels (bidirectional walking in length and breadth), and anterior travelling wheel and middle part travelling wheel can slide on the rail of correspondence.Can realize normal bridge erection construction when walking crossbeam in middle part is all vertical with girder with anterior walking crossbeam; When carrying out the oblique bridge erection, described anterior walking crossbeam becomes oblique with girder, connected mode achieves a fixed connection between girder and walking crossbeam by adjusting, anterior walking crossbeam is positioned at same vertical plane with anterior travelling wheel, rail, and two middle part travelling wheels change that to walk on the same one steel rail be to walk on two one steel rails simultaneously.Bridge formation machine of the present utility model is on the basis of existing moulding quadrature box beam bridge formation machine, front portion walking crossbeam and middle part travelling wheel are improved and adjust, bridge formation organizational security after the improvement has been held the stability on bridge formation machine level and the vertical direction, and can do tiltedly laterally walking on rail.
Further feature is: described anterior walking crossbeam links to each other with girder by connecting bearing, and it is parallel with anterior walking crossbeam to connect the straight line that bearing connected into.
Described middle part walking crossbeam intersects vertically with girder and fixedlys connected.
Described anterior walking crossbeam realizes that by the flange combination wherein the bolt hole on the end flanges dish is the arc groove shape with the fixedly connected of bearing that be connected of girder, realizes oblique by the contraposition of reversing between flange.
With respect to prior art, the utlity model has following remarkable advantage:
1, on the basis of existing moulding quadrature box beam bridge formation machine, the front portion walking crossbeam and the middle part travelling wheel of bridge formation machine to be improved and adjust, adjusted bridge formation function is done tiltedly horizontal the walking on rail, finish the erection construction operation of oblique case beam;
2, the original horizontal connected mode of bridge formation machine is constant, and does not all change at other positions, has still kept bridge formation machine integral body stability in the horizontal and vertical directions;
3, the utility model just at the improvement of bridge formation machine walking crossbeam and travelling wheel, does not need to redesign new bridging equipment, has avoided the overlapping investment in the design, has reduced engineering cost.
Description of drawings
Fig. 1 is the perspective view of oblique box beam bridge formation machine of the present utility model;
Fig. 2 is that anterior crossbeam connects bearing flange and flange combination schematic diagram;
Fig. 3 is the braced structures schematic diagram of the quadrature box beam bridge formation machine of existing moulding;
Fig. 4 is the braced structures schematic diagram of the utility model oblique box beam bridge formation machine.
Among the figure, 1-girder, 2-door shape crossbeam, the anterior crossbeam of 3-, 4-middle part walking crossbeam, the anterior walking of 5-crossbeam, the anterior travelling wheel of 6-, 7-middle part travelling wheel, 8,9, the 10-rail, 11-vertical shift dolly, on 12,12 times-flange, 13-connects bearing, 14-lifts by crane dolly, the 15-strong point.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Oblique box beam bridge formation machine of the present utility model is the reasonable transformation of carrying out on existing moulding bridge formation machine basis, as shown in Figure 1, comprise two parallel girders 1, girder 1 is connected to form rectangular frame with the door shape crossbeam 2 of anterior crossbeam 3, afterbody, below girder 1, be provided with middle part walking crossbeam 4 and anterior walking crossbeam 5, crossbeam 5 lower ends of forwardly walking are provided with anterior travelling wheel 6, walking crossbeam 4 lower ends, middle part are provided with two middle part travelling wheels 7, and anterior travelling wheel 6 and middle part travelling wheel 7 can slide on the rail of correspondence; Described anterior walking crossbeam 5 length are enough, and fixedly connected with 1 one-tenth oblique form of girder, and anterior walking crossbeam 5 is positioned at same vertical plane with anterior travelling wheel 6, rail 8; Rail 9 is parallel double track with rail 10, and parallel with rail 8, and two middle part travelling wheels 7 lay respectively on rail 9 and the rail 10.Length direction two girder 1 upper ends respectively is provided with a rail, is placed with vertical shift dolly 11 on rail, and a lifting dolly 14 is arranged on every vertical shift dolly 11, also is respectively arranged with to connect bearing 13 below the afterbody of girder 1.The rail 8 of anterior walking crossbeam 5 lower ends is arranged on the bent cap, the rail 9 and the rail 10 of walking crossbeam lower end, middle part are arranged on the case beam that frame is good, vertical shift dolly 11 can vertically slide on the rail at girder 1 top, and, connect bearing 13 and mainly play a part girder 1 and the anterior crossbeam 5 of walking by 14 liftings of lifting dolly, installation precast beam.
Described anterior walking crossbeam 5 links to each other with girder 1 by connecting bearing 13, and the straight line that connection bearing 13 is connected into is parallel with anterior walking crossbeam 5.
Described middle part walking crossbeam 4 intersects vertically with girder 1 and fixedlys connected.
Described connection bearing 13 by on the flange 12,12 times fixing, wherein the bolt hole under the end flanges dish 12 is the arc groove shape, carries out flange and can center on reversing of axle center during contraposition up and down, can realize the needs of oblique.
When oblique box beam bridge formation machine of the present utility model is installed, respectively the travelling wheel at the walking crossbeam of front portion and middle part is reequiped and adjust.Anterior walking crossbeam 5 links to each other with girder 1 by connecting bearing 13, it is mobile forward or backward and fixing on girder 1 that one of them is connected bearing 13, make anterior walking crossbeam 5 change the oblique form into the quadrature form that two vertical girders 1 are connected, the angle of its oblique is decided according to the position of job site bent cap, this process is connected and fixed realization by the contraposition of reversing on the flange 12, under 12, as shown in Figure 2; Because anterior walking crossbeam 5 is positioned at same vertical plane with anterior travelling wheel 6, rail 8, corresponding anterior travelling wheel 6 and rail 8 also are adjusted into the form with girder 1 oblique, adjust the anterior travelling wheel 6 in back and can do tiltedly laterally walking on rail 8.
Simultaneously, middle part travelling wheel 7 is also adjusted.Because middle part walking crossbeam 4 is generally approved product, middle part travelling wheel 7 can planar horizontally rotate, and go up this position on construction ground and have enough spaces to utilize, therefore the crossbeam 4 of walking in the middle part of keeping intersects vertically with girder 1 and fixedlys connected, at two middle part travelling wheels rail 9 and rail 10 are set for 7 times respectively, rail 9 is parallel double track with rail 10, and parallel with rail 8, realizes that two middle part travelling wheels 7 do tiltedly laterally walking respectively on rail 9 and rail 10.
Through to after the repacking of the anterior crossbeam of bridge formation machine and middle part travelling wheel and adjusting, the bridge formation machine can be done tiltedly laterally walking on rail, as shown in Figure 4, four strong points of bridge formation machine become trapezoidal layout by original parallelogram, but original crossbeam connected mode does not become, all does not change at other positions yet, has still guaranteed the stability of bridge formation machine at level and vertical direction.During operation, carry out construction operation according to the origin operation method and get final product.
Claims (4)
1. oblique box beam bridge formation machine, comprise two parallel girders (1), girder (1) is connected to form rectangular frame with the door shape crossbeam (2) of anterior crossbeam (3), afterbody, be provided with middle part walking crossbeam (4) and anterior walking crossbeam (5) in girder (1) below, crossbeam (5) lower end of forwardly walking is provided with anterior travelling wheel (6), walking crossbeam (4) lower end, middle part is provided with two middle part travelling wheels (7), and anterior travelling wheel (6) and middle part travelling wheel (7) can slide on the rail of correspondence; Its remodeling carries out skew bridge and sets up and be characterised in that, described anterior walking crossbeam (5) becomes the oblique form fixedly connected with girder (1), and anterior crossbeam (5) and anterior travelling wheel (6), the rail (8) of walking is positioned at same vertical plane; Rail (9) is parallel double track with rail (10), and parallel with rail (8), and two middle part travelling wheels (7) lay respectively on rail (9) and the rail (10).
2. oblique box beam bridge formation machine according to claim 1 is characterized in that, described anterior walking crossbeam (5) links to each other with girder (1) by connecting bearing (13), and the straight line that connection bearing (13) is connected into is parallel with anterior walking crossbeam (5).
3. oblique box beam bridge formation machine according to claim 1 is characterized in that, described middle part walking crossbeam (4) intersects vertically with girder (1) and fixedlys connected.
4. oblique box beam bridge formation machine according to claim 2, it is characterized in that, the fixedly connected of described connection bearing (13) realized by flange (on 12,12 times) combination, wherein the bolt hole on the end flanges dish (12 times) is the arc groove shape, realizes oblique by the contraposition of reversing between flange.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201275862U CN201459609U (en) | 2009-06-08 | 2009-06-08 | Oblique crossing box beam bridge girder erection machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009201275862U CN201459609U (en) | 2009-06-08 | 2009-06-08 | Oblique crossing box beam bridge girder erection machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201459609U true CN201459609U (en) | 2010-05-12 |
Family
ID=42386962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009201275862U Expired - Fee Related CN201459609U (en) | 2009-06-08 | 2009-06-08 | Oblique crossing box beam bridge girder erection machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201459609U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797225A (en) * | 2012-08-31 | 2012-11-28 | 贵州桥梁建设集团有限责任公司 | Mobile lifting bracket for building bridge |
CN113774801A (en) * | 2021-09-17 | 2021-12-10 | 宁波市政工程建设集团股份有限公司 | Construction method for quick orthogonal deflection frame beam |
-
2009
- 2009-06-08 CN CN2009201275862U patent/CN201459609U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797225A (en) * | 2012-08-31 | 2012-11-28 | 贵州桥梁建设集团有限责任公司 | Mobile lifting bracket for building bridge |
CN113774801A (en) * | 2021-09-17 | 2021-12-10 | 宁波市政工程建设集团股份有限公司 | Construction method for quick orthogonal deflection frame beam |
CN113774801B (en) * | 2021-09-17 | 2023-03-14 | 宁波市政工程建设集团股份有限公司 | Construction method for quick orthogonal deflection frame beam |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101603288B (en) | Three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and installation method thereof | |
CN102352604B (en) | Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof | |
CN100482891C (en) | Method for building railway bridge and simple support T beam bridge | |
CN203334730U (en) | Split mounting type steel-structure movable workshop in construction site | |
CN106812035B (en) | Combined type overhead monorail traffic track beam and its processing technology | |
CN203529768U (en) | Portal crane walking for operation on building surface | |
CN105421249A (en) | Novel dragging- hoisting combined type hanging basket structure and construction method | |
WO2022037327A1 (en) | Method for erecting large-radian curved steel box girder bridge deck | |
CN207932932U (en) | A kind of twin beams slope Bridge Erector | |
CN212050244U (en) | Gantry crane system for mounting assembled bent cap | |
CN201933415U (en) | Highway and railway twin-girder bridge erection machine | |
CN203866654U (en) | Mobile assembly platform used for ballastless track laying construction | |
CN201459609U (en) | Oblique crossing box beam bridge girder erection machine | |
CN204825525U (en) | A modularization steel sheet sleeper for build bridge in tunnel face | |
CN201665822U (en) | Novel bridge girder erection machine | |
CN203461693U (en) | Ultrahigh steel support leg for combined gantry crane with Bailey truss | |
CN208871564U (en) | A kind of pin-connected panel large span cluster illumination lamps bridge | |
CN208702215U (en) | Overhead station | |
CN207919265U (en) | Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge | |
CN101139813B (en) | Steel truss of through bridge | |
CN206784865U (en) | A kind of detachable adjustable for height subway tunnel section construction operation platform | |
CN205857004U (en) | A kind of construction beam | |
CN107747280A (en) | The Bridge Erector of full span erection steel-pipe concrete truss | |
CN207538439U (en) | A kind of stable type operating platform | |
CN203782619U (en) | Construction trolley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100512 Termination date: 20140608 |