CN201442151U - Welding technology equipment of electric slag furnace crystallizer copper inner cylinder body - Google Patents

Welding technology equipment of electric slag furnace crystallizer copper inner cylinder body Download PDF

Info

Publication number
CN201442151U
CN201442151U CN2009200261538U CN200920026153U CN201442151U CN 201442151 U CN201442151 U CN 201442151U CN 2009200261538 U CN2009200261538 U CN 2009200261538U CN 200920026153 U CN200920026153 U CN 200920026153U CN 201442151 U CN201442151 U CN 201442151U
Authority
CN
China
Prior art keywords
bracket body
welding
inner barrel
supporting plate
open slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200261538U
Other languages
Chinese (zh)
Inventor
张国林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Yadong Metallurgical Equipment Co Ltd
Original Assignee
Weifang Yadong Metallurgical Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Yadong Metallurgical Equipment Co Ltd filed Critical Weifang Yadong Metallurgical Equipment Co Ltd
Priority to CN2009200261538U priority Critical patent/CN201442151U/en
Application granted granted Critical
Publication of CN201442151U publication Critical patent/CN201442151U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Arc Welding In General (AREA)

Abstract

The utility model discloses welding technology equipment of an electric slag furnace crystallizer copper inner cylinder body. The equipment comprises a bracket body, an arc-shaped supporting plate, a support seat, a positioning baffle plate, and a clamping device, wherein, an opening of the supporting plate is opened upward and fixed on the bracket body; the support seat is fixed on the bracket body, an open slot stretching in axial direction is arranged on the support seat, and the upper opening surface of the support seat is lower than or parallel and level with a bearing surface of the supporting plate; the positioning baffle plate is spliced in the open slot and protrudes upwards out of the open slot; and the clamping device is mounted at the end part of the welding joint of two pieces of semicircular copper sheets. The welding technology equipment ensures the shape accuracy of copper inner cylinder body welding forming, and especially has important significance to the manufacture of large-scale crystallizers.

Description

The welding procedure equipment of the copper inner barrel of crystallizer for electroslag furnace
Technical field
The utility model relates to welding procedure equipment technology field, relates in particular to a kind of technological equipment that is used to weld the copper inner barrel of crystallizer for electroslag furnace.
Background technology
Electroslag remelting is a kind of double refining technology, the integrated metallurgical casting process that the collection steel secondary refining combines with directional solidification.Its principle is that electric current passes through liquid slag scum thermal resistance, and with the metal electrode fusing, molten metal accumulates molten drop, passes slag blanket during drippage and enters metal bath, and crystallization and freezing becomes steel ingot in water mold then.Form the stage at the electrode tip drop, and drop passes the slag bath drippage stage, steel-slag fully contacts, and nonmetallic inclusionsin steel is absorbed by slag.Harmful element in the steel (sulphur, lead, antimony, bismuth, tin) is removed more effectively by steel-slag reaction and high-temperature gasification.Liquid metal has been avoided reoxidizing under slag bath covers basically.Because fusing, refining in the copper water mold, solidify, this has just stopped the pollution of refractory material to steel.Before the ingot solidification, metal bath and slag bath are arranged, play insulation and feeding effect, guarantee the compactness of steel ingot in its upper end.The slag bath that rises forms the thin skull of one deck on the crystallizer inwall, not only make surface of steel ingot bright and clean, also plays insulation and heat-blocking action, and more heat is conducted to the bottom, helps steel ingot crystallographic orientation from bottom to top.Owing to above reason, the quality and the performance of the steel ingot of electroslag remelting production are improved, and plasticity under the low temperature of steel alloy, room temperature and the high temperature and impact flexibility strengthen, and steel prolong service life.
The inner barrel of crystallizer is formed by the copper soil weld.For large-scale crystallizer, the copper coin that is used to make inner barrel is very long.With 240t ingot crystallizer is example: cover copper coin girth 9708mm in the crystallizer, and the moulding of whole volume circle is difficulty very, because copper plate plasticity is better, though have the characteristic of flow harden, but the copper coin of length like this, it is enough to make under the copper coin curved from gravity, thereby the form accuracy after the influence welding.
As the present inventor, be devoted for years to design and manufacturing in crystallizer for electroslag furnace, have rich practice experience, through concentrating on studies of inventor, creatively overcome large-size electroslag furnace crystallizer inner barrel existing above-mentioned technological deficiency when welding by the burst moulding and by corresponding welding procedure equipment.
Summary of the invention
Technical problem to be solved in the utility model is: provide the welding procedure equipment of the copper inner barrel of a kind of crystallizer for electroslag furnace, to guarantee the form accuracy of copper inner barrel welding fabrication after adopting the burst moulding process.
For solving the problems of the technologies described above, the technical solution of the utility model is: the welding procedure equipment of the copper inner barrel of crystallizer for electroslag furnace comprises bracket body; Arc pallet, the opening of described supporting plate makes progress and is fixed on the described bracket body; Supporting base, described supporting base are fixed on the described bracket body, and described supporting base is provided with an axially extended open slot, and the upper open face of described supporting base is lower than the support face of described supporting plate or concordant with the support face of described supporting plate; Positioning baffle, described positioning baffle are plugged in the described open slot also protruding upward in open slot; Clamping device, described clamping device are installed on the end of the welding joint of two semicircular copper plates.
Wherein, described positioning baffle is positioned on the vertical plane of symmetry of the inner barrel that described two semicircular copper plates form.
Wherein, described clamping device comprises two arc integrated circuit boards, and the draw-in groove width of described integrated circuit board and the thickness of described semicircular copper plates are suitable.
Wherein, described bracket body comprises two monomers, is provided with connecting rod between described two monomers.
After having adopted technique scheme, the beneficial effects of the utility model are: because this welding procedure equipment comprises bracket body, arc pallet, supporting base and positioning baffle, during use, two semicircular copper plates are positioned on the arc pallet, the bottom joint of two semicircular copper plates relies on the positioning baffle from both sides, the top joint of two semicircular copper plates is welding portions, and clamping device is installed on the top joint of two semicircular copper plates, is used for fixing the relative position of two copper coins.Earlier welding top weld seam behind the cool to room temperature, is pulled out positioning baffle, clamping device is unloaded and clamping at the bottom joint of welding not, with cylindrical shell Rotate 180 °, weld another joint then.Owing to adopt the burst moulding process, reduced the weight of monolithic copper coin, thereby reduced the flexural deformation that produces because of weight.Guaranteed that by positioning baffle and clamping device two copper coins can not be moved in welding process, thereby guaranteed the form accuracy of inner barrel welding fabrication.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the front view of the utility model embodiment;
Fig. 2 is the cutaway view at A-A place among Fig. 1;
Fig. 3 is the partial enlarged drawing at I place among Fig. 2;
Among the figure: 1. first semicircular copper plates; 1 '. second semicircular copper plates; 2. heat-insulation layer; 3. bracket body; 31. supporting plate; 32. supporting base; 33. positioning baffle; 34. connecting rod; 4. integrated circuit board.
The specific embodiment
Shown in Fig. 1 and Fig. 2 are common, the welding procedure of the copper inner barrel of a kind of crystallizer for electroslag furnace equipment, it comprises bracket body 3; The opening of the supporting plate 31 of arc makes progress and is fixed on the described bracket body 3; Supporting base 32 is fixed on the described bracket body 3, and described supporting base 32 is provided with an axially extended open slot, and the upper open face of described supporting base 32 is lower than the support face of described supporting plate 31 or concordant with the support face of described supporting plate 31; Positioning baffle 33 is plugged in the described open slot also protruding upward in open slot; Two arc integrated circuit boards 4 are formed clamping device, the draw-in groove width of described integrated circuit board 4 and the thickness of two semicircular copper plates suitable (as shown in Figure 3), and during use, arc integrated circuit board 4 is installed on the end of the welding joint of two semicircular copper plates.
Preferably, described positioning baffle 33 is arranged on the vertical plane of symmetry of the inner barrel that first semicircular copper plates 1 and second semicircular copper plates 1 ' form.
Preferably, described bracket body 3 comprises two monomers, is provided with connecting rod 34 between described two monomers, can significantly save the materials of bracket body 3 and arc pallet 31 like this.
During use, be preferably in and lay heat-insulation layer 2 on the support face of arc pallet 31, so that make first semicircular copper plates 1 and second semicircular copper plates 1 ' keep preheat temperature.First semicircular copper plates 1 and second semicircular copper plates 1 ' are positioned on the heat-insulation layer 2, the bottom joint of first semicircular copper plates 1 and second semicircular copper plates 1 ' relies on the positioning baffle 33 from both sides, the top joint of first semicircular copper plates 1 and second semicircular copper plates 1 ' is a welding portion, clamping device is installed on the top joint of two semicircular copper plates.Earlier welding top weld seam behind the cool to room temperature, is pulled out positioning baffle 33, clamping device is unloaded and clamping at the bottom joint of welding not, with cylindrical shell Rotate 180 °, weld another joint then.Owing to adopt the burst moulding process, reduced the weight of monolithic copper coin, thereby reduced the flexural deformation that produces because of weight.Guaranteed that by positioning baffle and clamping device two copper coins can not be moved in welding process, thereby guaranteed the form accuracy of inner barrel welding fabrication.
For instance, the technological requirement of the copper inner barrel of diameter 3050mm is: R ± 20mm, circle back, school circularity≤8mm; Actual reaching: R ± 14mm, circularity≤5mm.Adopt this welding procedure equipment, guaranteed the form accuracy of inner barrel welding fabrication, especially significant to the manufacturing of large-scale crystallizer.

Claims (4)

1. the welding procedure of the copper inner barrel of crystallizer for electroslag furnace equipment is characterized in that: comprise
Bracket body;
Arc pallet, the opening of described supporting plate makes progress and is fixed on the described bracket body;
Supporting base, described supporting base are fixed on the described bracket body, and described supporting base is provided with an axially extended open slot, and the upper open face of described supporting base is lower than the support face of described supporting plate or concordant with the support face of described supporting plate;
Positioning baffle, described positioning baffle are plugged in the described open slot also protruding upward in open slot;
Clamping device, described clamping device are installed on the end of the welding joint of two semicircular copper plates.
2. the welding procedure of the copper inner barrel of crystallizer for electroslag furnace as claimed in claim 1 equipment is characterized in that: described positioning baffle is positioned on the vertical plane of symmetry of the inner barrel that described two semicircular copper plates form.
3. the welding procedure equipment of the copper inner barrel of crystallizer for electroslag furnace as claimed in claim 1 or 2, it is characterized in that: described clamping device comprises two arc integrated circuit boards, the draw-in groove width of described integrated circuit board and the thickness of described semicircular copper plates are suitable.
4. the welding procedure equipment of the copper inner barrel of crystallizer for electroslag furnace as claimed in claim 3, it is characterized in that: described bracket body comprises two monomers, is provided with connecting rod between described two monomers.
CN2009200261538U 2009-05-26 2009-05-26 Welding technology equipment of electric slag furnace crystallizer copper inner cylinder body Expired - Fee Related CN201442151U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200261538U CN201442151U (en) 2009-05-26 2009-05-26 Welding technology equipment of electric slag furnace crystallizer copper inner cylinder body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200261538U CN201442151U (en) 2009-05-26 2009-05-26 Welding technology equipment of electric slag furnace crystallizer copper inner cylinder body

Publications (1)

Publication Number Publication Date
CN201442151U true CN201442151U (en) 2010-04-28

Family

ID=42546826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200261538U Expired - Fee Related CN201442151U (en) 2009-05-26 2009-05-26 Welding technology equipment of electric slag furnace crystallizer copper inner cylinder body

Country Status (1)

Country Link
CN (1) CN201442151U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102275055A (en) * 2011-07-14 2011-12-14 长春轨道客车装备有限责任公司 Welding supporter
CN102699515A (en) * 2012-05-10 2012-10-03 航天材料及工艺研究所 Welding deformation control fixture for welding of large-scale thin wall storage box structure and welding method
CN104625552A (en) * 2014-12-23 2015-05-20 渤海船舶重工有限责任公司 Horizontal assembling and welding device for cylindrical structure
CN105215606A (en) * 2015-10-31 2016-01-06 广东万和电气有限公司 For the apparatus for welding and positioning of inner bag and base

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102275055A (en) * 2011-07-14 2011-12-14 长春轨道客车装备有限责任公司 Welding supporter
CN102275055B (en) * 2011-07-14 2013-11-13 长春轨道客车装备有限责任公司 Welding supporter
CN102699515A (en) * 2012-05-10 2012-10-03 航天材料及工艺研究所 Welding deformation control fixture for welding of large-scale thin wall storage box structure and welding method
CN102699515B (en) * 2012-05-10 2014-06-18 航天材料及工艺研究所 Welding deformation control fixture for welding of large-scale thin wall storage box structure and welding method
CN104625552A (en) * 2014-12-23 2015-05-20 渤海船舶重工有限责任公司 Horizontal assembling and welding device for cylindrical structure
CN105215606A (en) * 2015-10-31 2016-01-06 广东万和电气有限公司 For the apparatus for welding and positioning of inner bag and base
CN105215606B (en) * 2015-10-31 2017-06-27 广东万和电气有限公司 For inner bag and the apparatus for welding and positioning of base

Similar Documents

Publication Publication Date Title
CN201442151U (en) Welding technology equipment of electric slag furnace crystallizer copper inner cylinder body
EP2623232B1 (en) Non-electroslag re-melting type clean metal ingot mold
JP2013184174A (en) Device and method for continuously casting titanium ingot and titanium alloy ingot
CN101147964A (en) Continuous casting crystallizer for plate billet
CN102294451B (en) Method for enhancing strip casting quality
CN104439201B (en) A kind of large-scale steel ingot electroslag heat-sealing ejection device and method that is uniformly distributed thermal source
CN102560182A (en) Method and device for smelting CuCrZr alloy in atmosphere
CN202440543U (en) Double electrode series ingot pumping electro-slag furnace
CN202763029U (en) Transferring casting ladle of piston molten aluminum
CN201442974U (en) Electroslag furnace crystallizer used for smelting rollers
CN202415652U (en) Slab mold crystallizer with adjustable inner cavity
CN201799581U (en) Non-electroslag remelting type clean metal ingot mould
CN201442971U (en) Combined crystallizer of electroslag furnace
CN205165860U (en) Prevent molten iron of slag backward flow and take off slag plate
CN210070570U (en) Water-cooled crucible for electron beam smelting furnace
CN207227513U (en) A kind of consutrode
CN207243965U (en) A kind of stripping formula bottom device for cooling for being convenient for changing cold piece of bottom
CN212191220U (en) Molten iron tank with slag filtering function
CN2937981Y (en) Forming structure of magnesium alloy crucible
CN115265104B (en) Electroslag remelting consumable electrode baking and drying device and method thereof
CN110411211A (en) A kind of use for laboratory melting and pouring device
CN101555553A (en) Combined crystallizer for electroslag furnace
CN220837817U (en) Upward ejection directional solidification casting system
CN208472169U (en) A kind of electroslag slugging water cooled electrode
CN203807533U (en) Arched electrode clamping part structure of electroslag smelting electrode clamp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100428

Termination date: 20130526