CN201437693U - Centralizing device - Google Patents

Centralizing device Download PDF

Info

Publication number
CN201437693U
CN201437693U CN200920109297XU CN200920109297U CN201437693U CN 201437693 U CN201437693 U CN 201437693U CN 200920109297X U CN200920109297X U CN 200920109297XU CN 200920109297 U CN200920109297 U CN 200920109297U CN 201437693 U CN201437693 U CN 201437693U
Authority
CN
China
Prior art keywords
riser pipe
stiffened panel
sleeve
angle side
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920109297XU
Other languages
Chinese (zh)
Inventor
姜伟
刘书杰
杨进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Original Assignee
China University of Petroleum Beijing
China National Offshore Oil Corp CNOOC
CNOOC Research Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing, China National Offshore Oil Corp CNOOC, CNOOC Research Center filed Critical China University of Petroleum Beijing
Priority to CN200920109297XU priority Critical patent/CN201437693U/en
Application granted granted Critical
Publication of CN201437693U publication Critical patent/CN201437693U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a centralizing device, which comprises a cylindrical sleeve and a plurality of identical right-angle triangular reinforced plates, wherein the same right-angle edge of each reinforced plate is uniformly welded at an equal distance to each other on the outer wall of the sleeve; and a riser pipe passes through and is welded on the sleeve, and the right-angle edge of the reinforced plate for non-welding is leveled to the end surface of the sleeve. The centralizing device has simple structure and good guidance quality and thoroughly solves the problems that the riser pipe below a mud line in the pile driving process on the sea is easy to incline and to bend.

Description

A kind of erection device
Technical field
The utility model relates to a kind of offshore oil engineering equipment, especially a kind of erection device that is used to set upright the offshore drilling riser pipe.
Background technology
For offshore drilling, the riser pipe drilling equipment that is absolutely necessary, adopt hammer to go into method when driving piles, because the riser pipe slenderness ratio is bigger, lateral stiffness is less, and the part below mud line is easy to run-off the straight, so just makes riser pipe vertically to insert in the earth, cause the riser pipe unbalance stress, may bring difficulty to wellbore construction.
Summary of the invention
At the problems referred to above, the purpose of this utility model provides a kind of erection device that riser pipe successfully vertically can be inserted in the earth.
For achieving the above object, the utility model is taked following technical scheme: a kind of erection device, it is characterized in that: it comprises the right-angled triangle stiffened panel that a circular sleeve is identical with polylith, on each described stiffened panel same right-angle side evenly and at intervals along described quill to being welded on the described sleeve outer wall; Riser pipe runs through and is welded on the described sleeve, the right-angle side of non-welding usefulness and described sleeve end face trimming on the described stiffened panel.
The right-angle side length of welding usefulness is identical with the height of described sleeve on the described stiffened panel, and the right-angle side length of non-welding usefulness is 1/3 of described riser pipe diameter on the described stiffened panel, and the thickness of described stiffened panel is identical with described riser pipe wall thickness; The internal diameter of described sleeve is than the big 3~5mm of external diameter of riser pipe.
The right-angle side of non-welding usefulness is up on the described stiffened panel during with the welding of described riser pipe.
Described stiffened panel is 8.
The utility model is owing to take above technical scheme, it has the following advantages: 1, the utility model is owing to be welded on the leg-of-mutton stiffened panel of polylith evenly and at intervals on the outer wall of sleeve, right-angle side on the stiffened panel along quill to welding, again up with the socket end at the right-angle side place of non-welding usefulness on the stiffened panel, form a up big and down small structure, therefore improved the whole lateral stiffness of riser pipe effectively, helped riser pipe and vertically go into mud.2, the utility model is owing to riser pipe being run through and being welded on the sleeve, again in the whole vertical insertion earth that will constitute by riser pipe and the utility model, and make the upper surface of sleeve be positioned at below the mud line, the soil body around stiffened panel and the riser pipe interacts like this, the effect of having played balance, set upright and having led, thus problems such as the following riser pipe of mud line tilts easily in the marine guidance piling process, bending solved.The utility model is simple in structure, and guidance quality is good, has thoroughly solved problems such as the following riser pipe of mud line tilts easily in the marine guidance piling process, bending.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Fig. 2 is the vertical view of stiffened panel in the utility model
Fig. 3 is the lateral view of stiffened panel in the utility model
Fig. 4 is structural representation of the present utility model for riser pipe inserts
The specific embodiment
Below in conjunction with embodiment, the utility model is described in detail.
Shown in Fig. 1~3, the utility model comprises a circular sleeve 1, and the height of sleeve 1 can be 0.3m, and internal diameter is convenient to the erection welding construction than the big 3~5mm of external diameter of riser pipe.The outer wall periphery of sleeve 1 is welded with the identical stiffened panel of polylith 2 evenly and at intervals, stiffened panel 2 is for having certain thickness modification of right-angled triangle plate, same right-angle side axially the welding of each stiffened panel 2 along sleeve 1, can improve the whole lateral stiffness of riser pipe so effectively, be beneficial to riser pipe and vertically insert in the earth.The right-angle side height of welding usefulness is identical with the height of sleeve 1 on the stiffened panel 2, the right-angle side of non-welding usefulness and sleeve 1 end face trimming on the stiffened panel 2, and the right-angle side length of non-welding usefulness can be 1/3 of riser pipe diameter, the thickness of stiffened panel 2 is not less than the riser pipe wall thickness, to guarantee that stiffened panel 2 has enough rigidity and intensity.In the present embodiment, the internal diameter of sleeve 1, external diameter and highly all be not limited to above-mentioned concrete length, as long as guarantee to be complementary with the actual inside and outside footpath of riser pipe of using, stiffened panel 2 numbers are 8, but also are not limited thereto.The material of sleeve 1 and stiffened panel 2 is identical with riser pipe, and is consistent with riser pipe to guarantee the utility model structural strength.
As shown in Figure 4, when the utility model used, with the right-angle side of non-welding usefulness on the stiffened panel 2 up, the utility model formed a up big and down small upside-down triangle shape structure at this moment.Again riser pipe 3 is run through sleeve 1, and be welded on the sleeve 1, this moment, riser pipe 3 constituted an integral body with the utility model.To hammer into shape in the soil body 4 by the integral body that riser pipe 3 and the utility model constitute, and make upper surface of the present utility model be positioned at mud line below 5, stiffened panel 2 interacts with riser pipe 3 soil body 4 on every side like this, the effect of having played balance, set upright and having led, thus mud line 5 following riser pipes 3 problems such as inclination, bending easily solved in the marine guidance piling process.
In the various embodiments described above, sleeve 1 is not limited to welding with stiffened panel 2, can also adopt the one-body molded alternate manner of Denging, to improvement and the equivalents that individual component is carried out, should not get rid of outside protection domain of the present utility model.

Claims (5)

1. erection device, it is characterized in that: it comprises the right-angled triangle stiffened panel that a circular sleeve is identical with polylith, on each described stiffened panel same right-angle side evenly and at intervals along described quill to being welded on the described sleeve outer wall; Riser pipe runs through and is welded on the described sleeve, the right-angle side of non-welding usefulness and described sleeve end face trimming on the described stiffened panel.
2. a kind of erection device as claimed in claim 1, it is characterized in that: the right-angle side length of welding usefulness is identical with the height of described sleeve on the described stiffened panel, the right-angle side length of non-welding usefulness is 1/3 of described riser pipe diameter on the described stiffened panel, and the thickness of described stiffened panel is identical with described riser pipe wall thickness; The internal diameter of described sleeve is than the big 3~5mm of external diameter of riser pipe.
3. a kind of erection device as claimed in claim 2 is characterized in that: the right-angle side of non-welding usefulness is up on the described stiffened panel during with the welding of described riser pipe.
4. a kind of erection device as claimed in claim 1 is characterized in that: the right-angle side of non-welding usefulness is up on the described stiffened panel during with the welding of described riser pipe.
5. as claim 1 or 2 or 3 or 4 described a kind of erection devices, it is characterized in that: described stiffened panel is 8.
CN200920109297XU 2009-06-23 2009-06-23 Centralizing device Expired - Lifetime CN201437693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920109297XU CN201437693U (en) 2009-06-23 2009-06-23 Centralizing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920109297XU CN201437693U (en) 2009-06-23 2009-06-23 Centralizing device

Publications (1)

Publication Number Publication Date
CN201437693U true CN201437693U (en) 2010-04-14

Family

ID=42399669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920109297XU Expired - Lifetime CN201437693U (en) 2009-06-23 2009-06-23 Centralizing device

Country Status (1)

Country Link
CN (1) CN201437693U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586451B (en) * 2009-06-23 2012-07-04 中国海洋石油总公司 Erection device
CN103410150A (en) * 2013-07-24 2013-11-27 中铁大桥局股份有限公司 Guide structure of guide pipe and underwater concrete pouring method for raking pile and adopting guide structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586451B (en) * 2009-06-23 2012-07-04 中国海洋石油总公司 Erection device
CN103410150A (en) * 2013-07-24 2013-11-27 中铁大桥局股份有限公司 Guide structure of guide pipe and underwater concrete pouring method for raking pile and adopting guide structure

Similar Documents

Publication Publication Date Title
CN203625893U (en) Rock-embedded cast-in-place pile
CN103161155A (en) Pile machine special for immersed tube pressure filling pile, using method thereof and application thereof
CN106930291B (en) Marine multi-pile limiting frame and construction method thereof
CN101586451B (en) Erection device
CN201437693U (en) Centralizing device
CN104674839A (en) Foundation structure for wind-driven generator
CN203977417U (en) Ribs built-in steel casing for a kind of pile of deep water pile foundation
CN106013096A (en) Construction method of building foundation
CN207110989U (en) A kind of Novel drilling bored concrete pile drilling rod
CN217174729U (en) Bored concrete pile structure for water conservancy bridge
CN205999941U (en) A kind of underground continuous wall section attachment means
CN209798812U (en) Offshore wind power composite foundation structure with combination of inner steel pipe piles and outer steel pipe piles
JP2008025148A (en) Large-sized composite pile composed of steel pipe and soil cement
CN109680978B (en) Basement storey-adding underpinning construction method
CN204023579U (en) A kind of contrary sequence method post joint bar tool rack
CN103866763B (en) Method for making pile by performing pile pressure irrigation through immersed tube and special device and application
CN103015433A (en) Method for constructing super-large diameter round and square combination deep foundation pit
CN209323504U (en) A kind of continuous underground wall structure
CN207700198U (en) A kind of advanced support supporting construction
CN111021351A (en) Pile top plugging construction method for pre-tensioning prestressed concrete pipe pile
CN102900074B (en) Prefabricated tubular pile with end screw thread with X-shaped variable section and construction method thereof
CN108005079B (en) Implanted precast pile grouting device and implanted grouting process
JP5885603B2 (en) Construction method of Yamadome wall
CN105908773A (en) Two-stage socketed pile wind turbine foundation for shallow covering stratum foundation of offshore wind plant and construction method
CN105714770A (en) Reinforced type cast-in-situ bored pile structure and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20100414

Effective date of abandoning: 20090623