CN201433358Y - 拼装式钢结构棚洞 - Google Patents

拼装式钢结构棚洞 Download PDF

Info

Publication number
CN201433358Y
CN201433358Y CN 200920032711 CN200920032711U CN201433358Y CN 201433358 Y CN201433358 Y CN 201433358Y CN 200920032711 CN200920032711 CN 200920032711 CN 200920032711 U CN200920032711 U CN 200920032711U CN 201433358 Y CN201433358 Y CN 201433358Y
Authority
CN
China
Prior art keywords
steel structure
tunnel
steel
hangar tunnel
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200920032711
Other languages
English (en)
Inventor
张贵海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN 200920032711 priority Critical patent/CN201433358Y/zh
Application granted granted Critical
Publication of CN201433358Y publication Critical patent/CN201433358Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本实用新型涉及一种拼装式钢结构棚洞。山区铁路隧道外明洞目前均为钢筋混凝土结构,在发生诸如地震、滑坡等灾害被损坏后,为保证最短时间内恢复铁路畅通,钢筋混凝土结构存在以下弊端:现场施工需要的工作面大,现场施工工序多、施工周期长。本实用新型的特征在于:棚洞由多个单榀钢架、柱间支撑件和螺栓构成;单榀钢架有2根钢架柱和一根横向框架梁通过螺栓固定为“∏”型结构,两个单榀钢架平行排列,两个单榀钢架之间设置通过螺栓连接的柱间支撑件,构成一个钢架稳定结构单元,多个钢架稳定结构单元通过柱间连接梁连接构成钢结构棚洞。本实用新型采用工厂加工,现场采用螺栓拼接方式安装,施工速度快,能够根据现场的实际情况及时做出调整。

Description

拼装式钢结构棚洞
技术领域
本实用新型涉及灾后铁路隧道明洞快速恢复工程装置,具体说是一种拼装式钢结构棚洞。
背景技术
山区铁路隧道外明洞目前均为钢筋混凝土结构,在发生诸如地震、滑坡等灾害被损坏后,为保证最短时间内恢复铁路畅通,钢筋混凝土结构存在以下弊端:
1、现场施工需要的工作面大。混凝土构件的生产最基本的材料为钢筋、水泥、砂,同时还需要模板、脚手架等辅助材料,因此现场需要具备一定的场地进行材料堆放及施工开展,在很多情况下是无法满足的。
2、现场施工工序多、施工周期长。混凝土结构构件的施工需要的工序主要为场地平整、模板搭建、帮扎钢筋、混凝土搅拌、混凝土浇筑、养护等工序,从混凝土浇筑成型到形成需要一定的养护周期。因此无法达到快速的目的。
3、复杂环境中混凝土结构施工的适应性差。灾后恢复的施工现场,环境非常复杂,为保证尽快恢复通车要求现场施工必须根据实际情况进行调整,由于地形、环境受限导致混凝土的施工无法进行。
发明内容
本实用新型的目的是提供一种结构简单,施工方便的拼装式钢结构棚洞。
为实现上述目的,本实用新型采用的技术方案如下:
拼装式钢结构棚洞,其特殊之处在于:所述的棚洞由多个单榀钢架、柱间支撑件和螺栓构成;所述的单榀钢架有2根钢架柱和一根横向框架梁通过螺栓固定为“∏”型结构,所述的两个单榀钢架平行排列,两个单榀钢架之间设置通过螺栓连接的柱间支撑件,构成一个钢架稳定结构单元,所述的多个钢架稳定结构单元通过柱间连接梁连接构成钢结构棚洞。
上述的棚洞的横向框架梁上设置多根纵向框架梁。
上述的横向框架梁的一端设置在山体侧。
上述的钢结构棚洞的屋面上设置钢板、防水板和吸能层。
本实用新型的优点如下:
1、采用工厂加工,现场拼接的安装方式,钢结构构件沿着起重设备行进路线两侧摆放,不需要其他的施工场地。
2、全部采用螺栓拼接方式进行安装,施工速度快,施工周期短。
3、钢结构施工适应性强,能够根据现场的实际情况及时做出调整。
附图说明
图1为钢结构棚洞的结构剖面图;
图2为钢结构棚洞的侧立面的结构示意图;
图3为钢结构棚洞屋面的结构示意图。
附图标记:
1-单榀钢架,2-柱间支撑件,3-螺栓,4-钢架柱,5-横向框架梁,6-柱间连接梁,7-纵向框架梁,8-钢板、9-防水板,10-吸能层。
具体实施例
山区铁路隧道外明洞目前均为钢筋混凝土结构,在发生诸如地震、滑坡等灾害被损坏后,为保证最短时间内恢复铁路畅通,本实用新型在山区铁路隧道外明洞采用拼装式钢结构棚洞。
参见图1、图2,图1为钢结构棚洞的结构剖面图;图2为钢结构棚洞的侧立面的结构示意图;
拼装式钢结构棚洞由多个单榀钢架1、柱间支撑件2和螺栓3构成;所述的单榀钢架1有2根钢架柱4和一根横向框架梁5通过螺栓固定为“∏”型结构,所述的两个单榀钢架1平行排列,两个单榀钢架1之间设置通过螺栓3连接的柱间支撑件2,将柱间支撑件2交叉设置,构成一个钢架稳定结构单元,所述的多个钢架稳定结构单元通过柱间连接梁6连接构成钢结构棚洞。使用时,将其设置在施工现场在钢筋混凝土预埋柱脚锚栓上。横向框架梁5的一端设置在山体侧。所述的钢材采用热轧H型钢。
参见图1、图3,图1为钢结构棚洞的结构剖面图;图3为钢结构棚洞屋面的结构示意图。
拼装式钢结构棚洞横向框架梁5上设置多根纵向框架梁6,从而构成网状结构的钢架屋面结构;在屋面上依次设置钢板8、防水板9,吸能层10,防止山体落石的冲击,确保棚洞内行车的安全。

Claims (4)

1、拼装式钢结构棚洞,其特征在于:所述的棚洞由多个单榀钢架(1)、柱间支撑件(2)和螺栓(3)构成;所述的单榀钢架(1)有2根钢架柱(4)和一根横向框架梁(5)通过螺栓固定为“∏”型结构,所述的两个单榀钢架(1)平行排列,两个单榀钢架(1)之间设置通过螺栓(3)连接的柱间支撑件(2),构成一个钢架稳定结构单元,所述的多个钢架稳定结构单元通过柱间连接梁(6)连接构成钢结构棚洞。
2、根据权利要求1所述的拼装式钢结构棚洞,其特征在于:所述的棚洞的横向框架梁(5)上设置多根纵向框架梁(7)。
3、根据权利要求1或2所述的拼装式钢结构棚洞,其特征在于:所述的横向框架梁(5)的一端设置在山体侧。
4、根据权利要求1或2所述的拼装式钢结构棚洞,其特征在于:所述的钢结构棚洞的屋面上依次设置钢板(8)、防水板(9)和吸能层(10)。
CN 200920032711 2009-04-21 2009-04-21 拼装式钢结构棚洞 Expired - Fee Related CN201433358Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200920032711 CN201433358Y (zh) 2009-04-21 2009-04-21 拼装式钢结构棚洞

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200920032711 CN201433358Y (zh) 2009-04-21 2009-04-21 拼装式钢结构棚洞

Publications (1)

Publication Number Publication Date
CN201433358Y true CN201433358Y (zh) 2010-03-31

Family

ID=42052168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200920032711 Expired - Fee Related CN201433358Y (zh) 2009-04-21 2009-04-21 拼装式钢结构棚洞

Country Status (1)

Country Link
CN (1) CN201433358Y (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974886A (zh) * 2010-07-30 2011-02-16 陈洪凯 一种组合式落石棚洞及其安设方法
CN104233967A (zh) * 2014-10-09 2014-12-24 王林峰 悬臂式消能棚洞及山区公路防护棚洞搭建方法
CN104695973A (zh) * 2014-12-19 2015-06-10 中铁二院工程集团有限责任公司 棚洞顶部轻型防护构造
CN105178206A (zh) * 2015-08-06 2015-12-23 中铁二院昆明勘察设计研究院有限责任公司 新型拼装式棚洞
CN107988926A (zh) * 2017-11-27 2018-05-04 云南公投建设集团设计研究院有限公司 一种装配式波纹钢拱形棚洞结构
CN108360560A (zh) * 2018-02-12 2018-08-03 四川省交通运输厅交通勘察设计研究院 一种适用于抢险救灾的装配式钢箱棚洞及施工方法
CN111395213A (zh) * 2020-03-10 2020-07-10 武汉大学 一种抗滑坡崩塌体冲击的耗能减震组合棚洞结构施工方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101974886A (zh) * 2010-07-30 2011-02-16 陈洪凯 一种组合式落石棚洞及其安设方法
CN104233967A (zh) * 2014-10-09 2014-12-24 王林峰 悬臂式消能棚洞及山区公路防护棚洞搭建方法
CN104233967B (zh) * 2014-10-09 2016-05-11 王林峰 悬臂式消能棚洞及山区公路防护棚洞搭建方法
CN104695973A (zh) * 2014-12-19 2015-06-10 中铁二院工程集团有限责任公司 棚洞顶部轻型防护构造
CN105178206A (zh) * 2015-08-06 2015-12-23 中铁二院昆明勘察设计研究院有限责任公司 新型拼装式棚洞
CN107988926A (zh) * 2017-11-27 2018-05-04 云南公投建设集团设计研究院有限公司 一种装配式波纹钢拱形棚洞结构
CN108360560A (zh) * 2018-02-12 2018-08-03 四川省交通运输厅交通勘察设计研究院 一种适用于抢险救灾的装配式钢箱棚洞及施工方法
CN108360560B (zh) * 2018-02-12 2020-06-02 四川省交通勘察设计研究院有限公司 一种适用于抢险救灾的装配式钢箱棚洞及施工方法
CN111395213A (zh) * 2020-03-10 2020-07-10 武汉大学 一种抗滑坡崩塌体冲击的耗能减震组合棚洞结构施工方法

Similar Documents

Publication Publication Date Title
CN201433358Y (zh) 拼装式钢结构棚洞
CN201972237U (zh) 一种节段预制矩形钢管混凝土桁架
CN104097253A (zh) 跨座式单轨交通环保型活动式预制轨道梁模板系统
KR20210054303A (ko) 경사구간 시공이 가능한 터널용 콘크리트 라이닝 거푸집장치
CN105143570A (zh) 一种建筑结构及其施工方法
CN102031785A (zh) 永久结构板带代替临时围檩的基坑支护技术
CN112746569B (zh) 旧桥生态拆除结构及施工方法
CN102605717A (zh) 墩顶纵向支撑膺架法
CN204125851U (zh) 一种桁架梁式棚洞结构
CN203808237U (zh) 一种预制装配式防屈曲钢板剪力墙高层建筑结构体系
CN101666069A (zh) 现浇预应力箱梁张拉槽口施工工艺
CN109610707A (zh) 一种预制钢梁与楼板平齐装配的设计及快速施工方法
CN215979399U (zh) 一种中洞法中隔墙衬砌施工台架
CN213737101U (zh) 一种带式输送机支架支撑加固装置
CN214695701U (zh) 一种桩基清障用两次体系转换桩基托换结构
CN103590839A (zh) 地铁车站现浇结构门式支架施工工艺
CN107654066A (zh) 一种可拆卸式塔吊爬升装置及施工方法
CN110565529B (zh) 声屏障基础与箱梁一体化浇筑模板
CN209872173U (zh) 一种简易钢结构门机
CN220099621U (zh) 一种贝雷梁的组合支撑结构
CN207392736U (zh) 一种可拆卸式塔吊爬升装置
CN213233147U (zh) 一种预制节段梁拼装临时快拆移动支架
CN219527660U (zh) 全装配式大跨度钢结构软土深基坑支护结构
CN110733975B (zh) 一种龙门吊组合式梁装置及安装方法
CN210561788U (zh) 城市桥梁局部生态拆除结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XINJIANG RAILWAY SURVEY AND DESIGN INSTITUTE CO.,

Free format text: FORMER OWNER: CHINA RAILWAY FIRST SURVEY + DESIGN INSTITUTE GROUP CO., LTD.

Effective date: 20110506

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 710043 NO. 2, XIYING ROAD, XI'AN CITY, SHAANXI PROVINCE TO: 830011 NO. 703, BEIJING SOUTH ROAD, URUMQI CITY, XINJIANG UYGHUR AUTONOMOUS REGION

TR01 Transfer of patent right

Effective date of registration: 20110506

Address after: 830011 No. 703 South Beijing Road, the Xinjiang Uygur Autonomous Region, Urumqi

Patentee after: Xinjiang Railroad Prospecting Design Institute Co.,Ltd.

Address before: 710043 Shaanxi province Xi'an Xiying Road No. 2

Patentee before: China Railway First Survey & Design Institute Group Co., Ltd.

ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY FIRST SURVEY + DESIGN INSTITUTE GROU

Free format text: FORMER OWNER: XINJIANG RAILWAY SURVEY AND DESIGN INSTITUTE CO., LTD.

Effective date: 20150610

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150610

Address after: 710043 Shaanxi Province, Xi'an Yanta District Xiying Road No. two

Patentee after: China Railway First Survey & Design Institute Group Co., Ltd.

Address before: 830011 No. 703 South Beijing Road, the Xinjiang Uygur Autonomous Region, Urumqi

Patentee before: Xinjiang Railroad Prospecting Design Institute Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100331

Termination date: 20170421