CN201419307Y - Pipeline combined line-up clamp - Google Patents

Pipeline combined line-up clamp Download PDF

Info

Publication number
CN201419307Y
CN201419307Y CN2009200677191U CN200920067719U CN201419307Y CN 201419307 Y CN201419307 Y CN 201419307Y CN 2009200677191 U CN2009200677191 U CN 2009200677191U CN 200920067719 U CN200920067719 U CN 200920067719U CN 201419307 Y CN201419307 Y CN 201419307Y
Authority
CN
China
Prior art keywords
pipeline
semi
bracket
mouthpart
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200677191U
Other languages
Chinese (zh)
Inventor
任江
匡礼毅
龚怀波
刘欢
任鸿
朱启文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
Shanghai Wuye Construction Of Zhongye Chenggong Coltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Wuye Construction Of Zhongye Chenggong Coltd filed Critical Shanghai Wuye Construction Of Zhongye Chenggong Coltd
Priority to CN2009200677191U priority Critical patent/CN201419307Y/en
Application granted granted Critical
Publication of CN201419307Y publication Critical patent/CN201419307Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a pipeline welding tool, in particular to a pipeline combined line-up clamp, comprising a pair of brackets. The brackets comprise two vertical semi-circle brackets in consistent size, a cross beam is arranged between the two semi-circle brackets for connection, a corresponding supporting beam is arranged at the position of the edge of each semi-circle bracket, the bracket is provided with a regulating mechanism, one end of the regulating mechanism is fixedly connected onto the bracket and the other end of the regulating mechanism is a free end, and a standard plateis arranged at the bottom of the bracket; a regulating screw stem that penetrates through the bracket vertically is respectively arranged at the top part of each semi-circle bracket; a movable pressing plate is arranged at the lower end of the screw stem, and the pressing plate is changeable to adapt to different calibers. The utility model can guarantee the concentricity of the pipeline better,decrease the pipeline unfitness of butt joint, and improve the working efficiency; besides, the construction quality is controlled within the construction specifications.

Description

Pipeline group is box-like to mouthpart
Technical field
The utility model relates to the pipeline welding instrument, and it is box-like to mouthpart to relate in particular to a kind of pipeline group.
Background technology
City and industrial expansion need to lay a large amount of pipelines, can need to form one section new pipeline with welding behind the two segment pipes aligning when laying.When the pipeline welding, traditional tube side fado number is adopted pull, pickaback, the way counterpart that touches of armrest, when the large diameter pipeline counterpart, trickle adjusting will be wasted time and energy especially, and situations such as misalignment often appear, had a strong impact on the welding quality of next procedure.
Summary of the invention
The utility model is intended to address the aforementioned drawbacks, and provides a kind of pipeline group box-like to mouthpart, can guarantee the pipeline concentricity preferably, reduces the pipeline unfitness of butt joint, improves work efficiency.And construction quality is all in job specfication requires.
The utility model is achieved in that
Provide a kind of pipeline group box-like to mouthpart, it comprises pair of brackets, this support comprises the vertical semi-circular bracket of two consistent size, the centre has crossbeam to connect, the position of a string of each semi-circular bracket is equipped with in correspondence with each other a brace summer, and support has governor motion, on the fixedly connected support of its end, the other end is a free end, and frame bottom has an on-gauge plate; One adjusting screw(rod) that vertically passes support is respectively arranged at each semi-circular bracket top; The screw rod lower end has movable pressing board, pressing plate be changeable type with the reply different tube diameters; The utility model can guarantee the pipeline concentricity preferably, reduces the pipeline unfitness of butt joint, improves work efficiency.And construction quality is all in job specfication requires.Adopt the box-like pipe welding port of pipeline group can guarantee the pipeline concentricity preferably, reduce the pipeline unfitness of butt joint, improve work efficiency, reduce the pipeline unfitness of butt joint effectively, improved the counterpart quality the mouthpart assembling.Wide accommodation, the adaptation caliber is the pipeline of DN100~300, simultaneous adaptation pipeline and elbow, the counterpart of pipe fittings such as threeway.Can carry out the fine setting of pipeline and pipeline, pipeline and bend pipe tools weld gap like a cork during the assembling counterpart.Reduce the counterpart unfitness of butt joint.Effectively improve the operating efficiency of pipeline counterpart spot welding, reduce working strength of workers.The material of making anchor clamps is common, easy to make.This counterpart body, light flexibly, easy operating can in all case use.
Description of drawings
Below, further specify the utility model in conjunction with the accompanying drawings:
Fig. 1 is the utility model scheme of installation.
Fig. 2 is the side view of Fig. 1.
The specific embodiment
As depicted in figs. 1 and 2, the utility model pipeline group is box-like to mouthpart, and it comprises pair of brackets, and this support comprises the vertical semi-circular bracket 6 of two consistent size, the centre has crossbeam to connect, and the position of a string of each semi-circular bracket is equipped with in correspondence with each other a brace summer 7; One adjusting screw(rod) 1 and 2 that vertically passes support is respectively arranged at each semi-circular bracket top; Described screw rod 2 lower ends have movable pressing board 4, pressing plate be changeable type with the reply different tube diameters; Described frame bottom has an on-gauge plate 5; Support has governor motion 3, and governor motion is for regulating steel wire rope or spending blue bolt, and on the fixedly connected support of its end, the other end is a free end.
Concrete enforcement is as follows:
(1), straight tube counterpart
Select movable pressing board according to different tube diameters during use, screw rod 1 is tightened on the pipeline, screw screw rod 2 simultaneously, make it be in the commissure, will regulate the side that steel wire rope 3 is fixed on pipeline then, the turn ratchet spanner spurs a side pipe road, adjust pipe distance and weld gap, can carry out tack welding.
(2), straight tube and elbow or threeway counterpart
Select movable pressing board according to different tube diameters during use, screw rod 1 is tightened on the pipeline, screw screw rod 2 simultaneously, the distance that makes movable pressing board and bottom on-gauge plate stretch out the mouth of pipe 10~30mm, bend pipe tools is placed on movable pressing board 4 and the bottom on-gauge plate 5, utilize adjusting rod 3 fixedly elbow or threeway, and after utilizing adjusting rod (spending blue bolt) 3 to regulate weld gap, can carry out the weld bond tack welding.

Claims (5)

1. a pipeline group is box-like to mouthpart, it is characterized in that: it comprises pair of brackets, this support comprises the vertical semi-circular bracket of two consistent size, and the centre has crossbeam to connect, and the position of a string of each semi-circular bracket is equipped with in correspondence with each other a brace summer; One adjusting screw(rod) that vertically passes support is respectively arranged at each semi-circular bracket top; A described screw rod lower end has movable pressing board; Support has governor motion, and on the fixedly connected support of its end, the other end is a free end.
2. a kind of pipeline group according to claim 1 is box-like to mouthpart, it is characterized in that, described frame bottom has an on-gauge plate.
3. a kind of pipeline group according to claim 1 is box-like to mouthpart, it is characterized in that: described top of the trellis and bottom are evenly equipped with 8 apertures along semicircle.
4. a kind of pipeline group according to claim 1 is box-like to mouthpart, it is characterized in that: described pressing plate be changeable type with the reply different tube diameters.
5. a kind of pipeline group according to claim 1 is box-like to mouthpart, it is characterized in that: described governor motion is for regulating steel wire rope or spending blue bolt.
CN2009200677191U 2009-02-13 2009-02-13 Pipeline combined line-up clamp Expired - Lifetime CN201419307Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200677191U CN201419307Y (en) 2009-02-13 2009-02-13 Pipeline combined line-up clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200677191U CN201419307Y (en) 2009-02-13 2009-02-13 Pipeline combined line-up clamp

Publications (1)

Publication Number Publication Date
CN201419307Y true CN201419307Y (en) 2010-03-10

Family

ID=41805956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200677191U Expired - Lifetime CN201419307Y (en) 2009-02-13 2009-02-13 Pipeline combined line-up clamp

Country Status (1)

Country Link
CN (1) CN201419307Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102069108A (en) * 2010-11-22 2011-05-25 南车资阳机车有限公司 Device for correcting distortion of rolled cylindrical product
CN102390009A (en) * 2010-12-22 2012-03-28 上海锅炉厂有限公司 Fitting clamp for fine-pitch tube bundle
CN104014974A (en) * 2014-06-05 2014-09-03 山东电力建设第一工程公司 Joint gap locating device for welding pipeline openings of utility boiler
CN106524312A (en) * 2016-12-26 2017-03-22 四川艾巴适环境科技有限公司 Intelligent fan-coil purifying box
CN110039234A (en) * 2018-01-17 2019-07-23 兰州兰石重型装备股份有限公司 Thin-wall barrel misalignment regulating device and its application method
CN111336895A (en) * 2020-02-24 2020-06-26 中国神华能源股份有限公司国华电力分公司 Pipe aligning inspection tool and inspection method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102069108A (en) * 2010-11-22 2011-05-25 南车资阳机车有限公司 Device for correcting distortion of rolled cylindrical product
CN102069108B (en) * 2010-11-22 2012-07-25 南车资阳机车有限公司 Device for correcting distortion of rolled cylindrical product
CN102390009A (en) * 2010-12-22 2012-03-28 上海锅炉厂有限公司 Fitting clamp for fine-pitch tube bundle
CN102390009B (en) * 2010-12-22 2015-11-18 上海锅炉厂有限公司 A kind of fitting clamp for fine-pitch tube bundle
CN104014974A (en) * 2014-06-05 2014-09-03 山东电力建设第一工程公司 Joint gap locating device for welding pipeline openings of utility boiler
CN106524312A (en) * 2016-12-26 2017-03-22 四川艾巴适环境科技有限公司 Intelligent fan-coil purifying box
CN110039234A (en) * 2018-01-17 2019-07-23 兰州兰石重型装备股份有限公司 Thin-wall barrel misalignment regulating device and its application method
CN111336895A (en) * 2020-02-24 2020-06-26 中国神华能源股份有限公司国华电力分公司 Pipe aligning inspection tool and inspection method

Similar Documents

Publication Publication Date Title
CN201419307Y (en) Pipeline combined line-up clamp
CN204183172U (en) A kind of hood type round steel pipe docking adjustment fixture
CN202824925U (en) Multi-purpose adjustable combined pipe fitting pressing plate brazing clamp
CN205629802U (en) Elbow welding fixture
CN201459932U (en) Roofing round tube purline adjustable connecting device
CN104014974A (en) Joint gap locating device for welding pipeline openings of utility boiler
CN204209355U (en) Tube welding mouth engaging tool
CN202591910U (en) Butt-jointing fixture used before steel pipe welding
CN204183896U (en) The special stationary fixture of pipeline welding
CN203696358U (en) Pipeline bracket for use in field pipeline welding
CN201089075Y (en) Pipe line butting aligning tool
CN211449990U (en) Stainless steel three-way pipe convenient to dismouting
CN204771638U (en) But return bend anchor clamps of accurate positioning
CN108167528A (en) A kind of water pipe suspension and support
CN211965496U (en) Pipeline bending platform for concentrated solution system installation
CN204252496U (en) The convenient erecting device of construction work suspension rod
CN203649773U (en) Opening alignment device for welding of water supply and sewerage steel pipe
CN205206368U (en) Instrument formula floor protector
CN201502788U (en) Rapid pipe installation fixing clamp
CN202442032U (en) Tapered plastic flange
CN202129543U (en) Welding tooling for three-way special-shaped oil tubes
CN204533910U (en) The composite steel tube of the white steel pipe of a kind of use quick connecting band socket joint enlarging
CN220388331U (en) Auxiliary tool for welding deformation control of small-size right-angle pipeline
CN201120534Y (en) Force saving port aligning machine
CN203485138U (en) Flange butt joint locating device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: MCC5 GROUP CORPORATION LIMITED (SHANGHAI)

Free format text: FORMER NAME: SHANGHAI WUYE CONSTRUCTION OF ZHONGYE CHENGGONG CO.LTD

CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2501

Patentee after: MCC5 Group Corporation Limited (Shanghai)

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2501

Patentee before: Shanghai Wuye Construction Of Zhongye Chenggong Co.Ltd

CX01 Expiry of patent term

Granted publication date: 20100310

CX01 Expiry of patent term