CN201120534Y - Force saving port aligning machine - Google Patents
Force saving port aligning machine Download PDFInfo
- Publication number
- CN201120534Y CN201120534Y CNU2007201593391U CN200720159339U CN201120534Y CN 201120534 Y CN201120534 Y CN 201120534Y CN U2007201593391 U CNU2007201593391 U CN U2007201593391U CN 200720159339 U CN200720159339 U CN 200720159339U CN 201120534 Y CN201120534 Y CN 201120534Y
- Authority
- CN
- China
- Prior art keywords
- pipe
- line
- moment arm
- arm rod
- arm bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to an oil field pipe-line construction tool, in particular relates to a labor-saving pipe fitting machine for implementing the finishing and butt-joint debugging to the welded junction of a pipe-line and the auxiliary welding. The pipe-line construction tool has the technical proposal that: the construction tool is mainly composed of a moment arm rod, an adjustable support and a fixed clamp, the lower end of the adjustable support is in flexible connection with the fixed clamp, and the top end thereof is in flexible connection with the moment arm rod, and the tail end of the moment arm rod is provided with a hook; and the fixed clamp is fixed on the original pipe-line, then the moment arm rod can take the upper end of the adjustable support as a shaft to move up and down so as to drive another pipe-line on the hook to fit with the original pipe-line. The pipe-line construction tool has the functional effects of labor saving, construction time saving and improving the construction quality and work efficiency.
Description
One, technical field:
The utility model relates to a kind of Oilfield Pipelines construction tool, and debugging is repaired, docked to particularly a kind of weld bond to pipeline, auxiliary weld laborsaving to mouthpart.
Two, background technology:
At present, the oil field is changed in the construction of heavy-caliber pipeline, when plant equipment can not near the time, the butt joint weld bond needs manpower to draw and lift adjustment, not only waste time and energy, and counterpart is of poor quality, easily causes whole weld bond construction quality to be difficult to guarantee.
Three, summary of the invention:
The purpose of this utility model is exactly the above-mentioned defective that exists at prior art, provides a kind of laborsaving to mouthpart, utilizes lever principle, and two is one group, provokes the two ends of pipeline, and debugging is repaired, docked to weld bond, the auxiliary welding.
Its technical scheme is: mainly be made up of arm bar, adjustable trestle and fixation clamp, the lower end of adjustable trestle flexibly connects fixation clamp, and the top flexibly connects arm bar, and the end of arm bar is installed suspension hook; Fixation clamp is fixed on the former pipeline, and making arm bar serves as that axle is up and down with the upper end of adjustable trestle, drives another pipeline and former pipeline counterpart on the suspension hook.
Described arm bar is installed a plurality of adjustment holes, and each adjustment hole can flexibly connect the top of adjustable trestle, regulates the length of the arm of force.
Effect of the present utility model is: can save manpower, save the engineering time, improve construction quality, increase work efficiency.
Four, description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model.
Five, the specific embodiment:
With reference to accompanying drawing 1, mainly to form by arm bar 1, adjustable trestle 2 and fixation clamp 3, the lower end of adjustable trestle 2 flexibly connects fixation clamp 3, and the top flexibly connects arm bar 1, and the end of arm bar 1 is installed suspension hook 4; Described fixation clamp 3 is fixed on the former pipeline, and making arm bar 1 serves as that axle is up and down with the upper end of adjustable trestle 2, drives another pipeline and former pipeline 8 counterparts on the suspension hook 4.Wherein, arm bar 1 is installed a plurality of adjustment holes 7, and each adjustment hole can flexibly connect the top 6 of adjustable trestle, regulates the length of the arm of force.
During use, at first select fixation clamp, and be fixed on the former pipeline 8, adjustable trestle 2 and fixation clamp 3 are connected, regulate desired height with screw 5 according to the diameter of changing pipeline, installing force armed lever 1, and regulate arm of force length.After two of former pipeline installed this product, will change required new pipeline two ends again and fasten sling, can carry out counterpart with the suspension hook of the arm bar leading portion new pipeline of slinging.Use the heavy pipeline of one section hundreds of jin of this tool changing only to need four-player to get final product now.Be primarily aimed in the electrogas welding maintenance work, change large diameter long lines, mechanical hoisting equipment can not near the time instrument that uses.By changing the model of fixation clamp, this instrument is applicable to
Etc. the pipeline of multiple model, it is time saving and energy saving to reach, the purpose of increasing work efficiency.
Claims (2)
1, a kind of laborsaving to mouthpart, it is characterized in that: mainly form by arm bar (1), adjustable trestle (2) and fixation clamp (3), the lower end of adjustable trestle (2) flexibly connects fixation clamp (3), and the top flexibly connects arm bar (1), and the end of arm bar (1) is installed suspension hook (4); Described fixation clamp (3) is fixed on the former pipeline, and making arm bar (1) serves as that axle is up and down with the upper end of adjustable trestle (2), drives another pipeline and former pipeline counterpart on the suspension hook (4).
2, according to claim 1 laborsaving to mouthpart, it is characterized in that: described arm bar (1) is installed a plurality of adjustment holes (7), and each adjustment hole can flexibly connect the top (6) of adjustable trestle, regulates the length of the arm of force.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201593391U CN201120534Y (en) | 2007-12-08 | 2007-12-08 | Force saving port aligning machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2007201593391U CN201120534Y (en) | 2007-12-08 | 2007-12-08 | Force saving port aligning machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201120534Y true CN201120534Y (en) | 2008-09-24 |
Family
ID=40007754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2007201593391U Expired - Fee Related CN201120534Y (en) | 2007-12-08 | 2007-12-08 | Force saving port aligning machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201120534Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107555364A (en) * | 2017-09-07 | 2018-01-09 | 凯盛科技股份有限公司 | A kind of top-jet-type etching machine pipeline lifting instrument |
-
2007
- 2007-12-08 CN CNU2007201593391U patent/CN201120534Y/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107555364A (en) * | 2017-09-07 | 2018-01-09 | 凯盛科技股份有限公司 | A kind of top-jet-type etching machine pipeline lifting instrument |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202137546U (en) | Opening-to-opening centralizer for welding of pipelines | |
CN201109014Y (en) | Conduit butt-joint rapid alignment device | |
CN2923197Y (en) | Quick butt-jointing righting pipe-clamp | |
CN2448508Y (en) | Auxiliary aligner for welding above sea of submerged pipeline | |
CN204416913U (en) | A kind of shaped steel stone tongs | |
CN201851778U (en) | Mechanical pipeline support frame | |
CN203335331U (en) | Guide pin used for flange bolt holes for hoisting butt joint of wind turbine tower drums | |
CN201343360Y (en) | Three dimensional assembled pipe clamp device | |
CN201419307Y (en) | Pipeline combined line-up clamp | |
CN201120534Y (en) | Force saving port aligning machine | |
CN204308262U (en) | Header pipe joint bevel machining cutter | |
CN103128537B (en) | Vehicle body of railway vehicle assembling flexible technology device | |
CN209793010U (en) | High-precision, simple and convenient steel pipe butt joint device | |
CN202367397U (en) | Adjustable pipeline aligning device | |
CN204584639U (en) | A kind of aerial pipeline welding stand | |
CN201531712U (en) | Pipe aligning device in oil field | |
CN204025904U (en) | A kind of chimney counterpart device | |
CN203649773U (en) | Opening alignment device for welding of water supply and sewerage steel pipe | |
CN201208687Y (en) | Pairing fixture for producing pipeline | |
CN201458509U (en) | Combined hoisting tool for large-sized pipes | |
CN202360348U (en) | Distributing and converting device of compressed air | |
CN216444883U (en) | Simple tool for loading and unloading reinforced concrete pipe | |
CN205918380U (en) | To one side straight dual -purpose rat hole pipe | |
CN206647060U (en) | Horizontal directional drilling machine single cylinder vice clamping structure | |
CN202716032U (en) | Hydraulic replacer of rigid pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |