CN201413942Y - Installing device for cabinet - Google Patents

Installing device for cabinet Download PDF

Info

Publication number
CN201413942Y
CN201413942Y CN2009203043041U CN200920304304U CN201413942Y CN 201413942 Y CN201413942 Y CN 201413942Y CN 2009203043041 U CN2009203043041 U CN 2009203043041U CN 200920304304 U CN200920304304 U CN 200920304304U CN 201413942 Y CN201413942 Y CN 201413942Y
Authority
CN
China
Prior art keywords
cabinet
dolly
lifting structure
track
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009203043041U
Other languages
Chinese (zh)
Inventor
王勇
王崇华
左银锋
曾志红
喻勇康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
MCC Shijiu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shijiu Construction Co Ltd filed Critical MCC Shijiu Construction Co Ltd
Priority to CN2009203043041U priority Critical patent/CN201413942Y/en
Application granted granted Critical
Publication of CN201413942Y publication Critical patent/CN201413942Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an installing and constructing device for an electric equipment, especially for an installing device for a cabinet. The utility model provides a conveniently-applied installing device for the cabinet, comprising a track (2) the start of which is arranged outside the electrical room (1), wherein two steel rails of the track (2) extend to the inside of the electrical room(1) and respectively extends to the end of the cabinet base (5) at two sides of the cabinet base (5) in the length direction of the cabinet base (5); a lifting structure arranged in a distribution trench (4) corresponding to the cabinet base (5) and fastened in the distribution trench (4) by an adjusting dolly (31) moving along the distribution trench (4); and a frame type dolly (6) moving alongthe track (2), wherein the frame of the dolly (6) includes a lifting channel (64) matched with the lifting structure. The device is adapted to positioning, installing and constructing multiple cabinets in the electrical room.

Description

The erecting device of dish cabinet
Technical field
The utility model relates to a kind of installation construction device of electric equipment, especially a kind of erecting device that coils cabinet.
Background technology
At present, the installation of electric panel room inner disc cabinet need winch to the electrical panel cabinet on the hydraulic pressure fork truck with crane usually, with manpower it is transported to installed position, and the methods such as spreading to the crowbar sled of choosing will be coiled cabinet and be moved dish cabinet base, will coil cabinet location levelling with instruments such as jack again.Often need to drop into a large amount of time and manpower, and the security reliability imperfection.
The utility model content
In order to overcome existing deficiency, technical problem to be solved in the utility model provides a kind of erecting device of dish cabinet easy to use.
The technical scheme that its technical problem that solves the utility model adopts is: the erecting device of dish cabinet, comprise that starting point is arranged on the outdoor track of electric panel room, it is indoor and extend to dish cabinet base end in dish cabinet base both sides along dish cabinet base length direction respectively that two one steel rails of track extend to electric panel room; Comprise being arranged on and the lifting structure that coils in the corresponding distribution trench of cabinet base, described lifting structure by the adjustment cart stationary that moves along the distribution trench in the distribution trench; Comprise the dolly that moves along track of frame-type, little frame comprises the hoist trunk that matches with lifting structure.
The beneficial effects of the utility model are: during installation, to coil cabinet winches on the dolly, order about dolly to the installation site of having good positioning in advance with manpower or other external force, to coil cabinet by lifting structure then raises, withdraw from dolly, utilize lifting structure to implement lifting and make about the dish cabinet and align at last, will coil cabinet and position installation by adjusting dolly.After the installation, adjust dolly and move to next installation position, enter next circulation is installed, after should the installation of row dish cabinet, lifting structure be taken out the dismounting track from trench along the distribution trench.Easy to use, versatility is high, can finish the installation of indoor dish cabinet safely, efficiently.
Description of drawings
Fig. 1 is a layout schematic diagram of the present utility model.
Embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
As shown in Figure 1, the erecting device of dish cabinet of the present utility model, comprise that starting point is arranged on the outdoor track 2 of electric panel room 1, it is indoor and extend to dish cabinet base 5 ends in dish cabinet base 5 both sides along dish cabinet base 5 length directions respectively that two one steel rails of track 2 extend to electric panel room 1; Comprise be arranged on coil the corresponding distribution trenches 4 of cabinet base 5 in lifting structure, described lifting structure is fixed in the distribution trench 4 by the adjustment dolly 31 that moves along distribution trench 4; Comprise the dolly 6 that moves along track 2 of frame-type, dolly 6 frameworks comprise the hoist trunk 64 that matches with lifting structure.
During installation, to coil cabinet winches on the dolly 6, order about dolly 6 to the installation site of having good positioning in advance with manpower or other external force, lifting structure passes and will coil the cabinet rising from hoist trunk 64 then, withdraw from dolly 6 to track 2 starting points, utilize lifting structure to implement lifting and make about the dish cabinet and align at last, will coil cabinet and position installation by adjusting dolly 31.Because dish cabinet base 5 usually corresponding a plurality of dish cabinets side by side, after the installation, adjust dolly 31 and move to next installation position along distribution trench 4, and carry out above-mentioned steps once more, thereby the cabinet that will coil one by one installs, after should the installation of row dish cabinet, lifting structure be taken out dismounting track 2 from distribution trench 4.This device is easy to use, versatility is high, can finish the installation of indoor dish cabinet safely, efficiently.
For effective control device cost, lifting structure is a jack, considers the length and the height of dish cabinet simultaneously, and the stationary problem when adopting a plurality of jack, and tumbling of may causing, and concrete, lifting structure is a scissors jack 3.Scissors jack 3 changes the transverse movement of driving screw mandrel the elevating movement of hoistable platform into by the scissors beam, the stationary problem in the time of can avoiding around the dish cabinet jack being set respectively and carry out descending operation.
Consider dish cabinet height, for tumbling of further avoiding may causing when mobile, described dolly 6 is provided with and coils the built-in beam 61 that cabinet rectangle frame beam matches.
For convenience of direct fixed disk cabinet when the dish cabinet hangs on the dolly 6, described built-in beam 61 is snap-in built-in beams.Thereby directly snap in by the rectangle frame beam that will coil cabinet and will coil cabinet in the built-in beam 61 and fix, can directly pass through lifting structure jack-up during installation, coil cabinet certainly and also can be fixed on the built-in beam 61 by bolt, steady pin etc.
Concrete, described dolly 6 is dismountablely to be connected to form by tie-beam 63 by front and back axletree 62, connection between tie-beam 63 and the axletree 62 is to removably connect, and on the axletree 62, hoist trunk 64 surrounded by axletree 62 and built-in beam 61 and constitutes before and after built-in beam 61 was fixed on.Concrete, removably connecting is fastening bolt.Thereby after arriving the installation position, rise the hoistable platform of scissors jack 3, hoistable platform passes and will coil cabinet and rises from the hoist trunk 64 that the axletree 62 and the built-in beam 61 of dolly 6 surrounded, the dish cabinet separates with dolly 6, disassemble fastening bolt, decompose and remove dolly 6 backs and re-assembly dolly 6, utilize scissors jack 3 to implement liftings at last, will coil cabinet and position installation in track 2 starting points.
Certainly dolly 6 also can be other dismountable frame structures, and its mode that removably connects also can be other modes.Except dismountable dolly 6, also can be all-in-one-piece dolly 6, dolly 6 frameworks comprise a untight opening, make and can avoid stopping of lifting structure when dolly 6 withdraws from, but such whole structural stability is poor.

Claims (5)

1. coil the erecting device of cabinet, it is characterized in that:
Comprise that starting point is arranged on the outdoor track (2) of electric panel room (1), it is indoor and extend to dish cabinet base (5) end in dish cabinet base (5) both sides along dish cabinet base (5) length direction respectively that two one steel rails of track (2) extend to electric panel room (1);
Comprise being arranged on the lifting structure interior with coiling the corresponding distribution trench of cabinet base (5) (4), described lifting structure is fixed in the distribution trench (4) by the adjustment dolly (31) that moves along distribution trench (4);
Comprise the dolly (6) that moves along track (2) of frame-type, dolly (6) framework comprises the hoist trunk (64) that matches with lifting structure.
2. the erecting device of dish cabinet as claimed in claim 1 is characterized in that: lifting structure is scissors jack (3).
3. the erecting device of dish cabinet as claimed in claim 1 is characterized in that: described dolly (6) is provided with the built-in beam (61) that matches with the rectangle frame beam that coils cabinet.
4. the erecting device of dish cabinet as claimed in claim 3 is characterized in that: described built-in beam (61) is snap-in built-in beam.
5. the erecting device of dish cabinet as claimed in claim 3, it is characterized in that: described dolly (6) is dismountablely to be connected to form by tie-beam (63) by front and back axletree (62), connection between tie-beam (63) and the axletree (62) is to removably connect, on the axletree (62), hoist trunk (64) surrounded by axletree (62) and built-in beam (61) and constitutes before and after built-in beam (61) was fixed on.
CN2009203043041U 2009-06-11 2009-06-11 Installing device for cabinet Expired - Lifetime CN201413942Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009203043041U CN201413942Y (en) 2009-06-11 2009-06-11 Installing device for cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009203043041U CN201413942Y (en) 2009-06-11 2009-06-11 Installing device for cabinet

Publications (1)

Publication Number Publication Date
CN201413942Y true CN201413942Y (en) 2010-02-24

Family

ID=41715823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009203043041U Expired - Lifetime CN201413942Y (en) 2009-06-11 2009-06-11 Installing device for cabinet

Country Status (1)

Country Link
CN (1) CN201413942Y (en)

Similar Documents

Publication Publication Date Title
US9670684B2 (en) Apparatus and method for lifting and sliding a structure attached to the wall
US8584429B2 (en) Tower erection system and method
US8469209B2 (en) Removal apparatus for a torque converter and a starting motor from an auxiliary compartment on a gas turbine
CN201417657Y (en) Installation device of indoor transformer
KR20140002751A (en) Method for accessing the outer surface of wind turbine towers and device for use with this method
JP2001254668A (en) Device and method for assembling wind power generation tower
SG182387A1 (en) Lifting method for formwork working platform
KR20190129189A (en) Lifting System
JP3732414B2 (en) Method and apparatus for constructing tower structure
CN212251443U (en) Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device
US20150143769A1 (en) Steel-frame building, plant, and method for assembling steel-frame building
JP5390553B2 (en) Pile press-fitting device
CN201413942Y (en) Installing device for cabinet
CN101660660B (en) Novel installing method of gas cabinet
CN202260191U (en) Mobile mounting rack for cabinet-type equipment
JP2002097819A (en) Method and device for assembling transmission tower
JP3905103B2 (en) Tower-like building erection method and erection device
CN215101525U (en) Movable portal frame for installing power distribution cabinet
US8474633B2 (en) Methods of removing a torque converter and a starting motor from an auxiliary compartment of a gas turbine
CN202117338U (en) Hydraulic ejection and following sliding device
CN205016899U (en) Unsettled transformer mounting bracket
CN112377672A (en) Old factory dust removal pipeline reconstruction and installation method and special pipeline moving and hoisting device thereof
CN109704208B (en) Modular load-bearing building with loading and unloading system
CN110127527B (en) Bridge crane hoisting method in limited space
CN215666937U (en) Assembled construction wallboard hoisting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA 19TH METALLURGICAL CORPORATION

Free format text: FORMER OWNER: MCC SHIJIU CONSTRUCTION CO., LTD.

Effective date: 20110328

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 617000 NO. 350, RENMIN STREET, PANZHIHUA CITY, SICHUAN PROVINCE TO: 617000 NO. 350, RENMIN STREET, EAST DISTRICT, PANZHIHUA CITY, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110328

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Patentee after: CHINA 19TH METALLURGICAL GROUP Co.,Ltd.

Address before: 617000 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee before: MCC SHIJIU CONSTRUCTION Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100224