CN201411842Y - Steel structure multirow rain cover mechanism - Google Patents

Steel structure multirow rain cover mechanism Download PDF

Info

Publication number
CN201411842Y
CN201411842Y CN2009201594340U CN200920159434U CN201411842Y CN 201411842 Y CN201411842 Y CN 201411842Y CN 2009201594340 U CN2009201594340 U CN 2009201594340U CN 200920159434 U CN200920159434 U CN 200920159434U CN 201411842 Y CN201411842 Y CN 201411842Y
Authority
CN
China
Prior art keywords
canopy
pawl
refute
fixed
rain cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201594340U
Other languages
Chinese (zh)
Inventor
朱生根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201594340U priority Critical patent/CN201411842Y/en
Application granted granted Critical
Publication of CN201411842Y publication Critical patent/CN201411842Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a rain cover mechanism, particularly to a steel structure multirow rain cover mechanism, mainly solving the technical problems of complex structure of the rain cover, inconvenient installation, and damage of the glass surface when glass is fixed by bolts in the prior art. The utility model comprises a concrete wall (1). A plurality of rain cover frames (2) arranged inparallel are fixed on the concrete wall (1) and vertically connected with a plurality of stiffeners arranged in parallel. An intersection of the rain cover frames and the stiffeners is connected witha claw seat (4), on which a claw (5) is connected, and a tempering glass (6) is fixed on the claw.

Description

Steel work is arranged canopy mechanism more
Technical field
The utility model relates to a kind of canopy mechanism, especially relates to a kind of steel work being arranged the isostructural improvement of canopy mechanism more.
Background technology
Existing weather levelling sample differs, and employed material is also different, and plastics canopy Yin Qiyi early is aging superseded, and present common with the integrated canopy of glass-reinforced plastic material, it is beautiful attractive in appearance and welcome because of color.But this integrated canopy is an integral manufacturing, installs comparatively difficult.Chinese patent discloses a kind of Fabricated platform awning (notice of authorization number: CN 2758357Y), it comprises standardized production and has standard-sized following assembly: baffle plate, heavy frame and a plurality of built-in fitting, built-in fitting is embedded in the building body, heavy frame comprises two support bars at least, one end of support bar is fixed in built-in fitting, baffle plate is fixed in support bar, and at least two support bars are parallel to each other; Heavy frame also comprises the reinforcing strip that is fixed in support bar, and the brace that is connected with reinforcing strip of end, the other end of brace is fixed in built-in fitting, reinforcing strip is fixed in the below or the top of support bar, described baffle plate be fixed in described support bar above or below, support bar is a T-steel, baffle plate is fixed in the transversary of T-steel, and reinforcing strip is fixed in the vertical structure of T-steel, support bar is fixed by the connector and the built-in fitting that are welded in built-in fitting, connector has double-screw bolt and fixes by bolt and support bar, the end of T-steel is the steel plate that comprises adjustment hole, and the double-screw bolt on the connector passes described adjustment hole and nut is connected and fixed support bar.But this canopy structure is comparatively complicated, and inconvenience is installed, and glass adopts screw, the easy glass surface that damages in the time of fixedly.
The utility model content
The utility model technical issues that need to address provide a kind of steel work and arrange canopy mechanism more, it mainly is to solve comparatively complexity of existing in prior technology canopy structure, install inconveniently, and glass adopts screw, the technical problem of damage glass surface etc. easily in the time of fixedly.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals:
Steel work of the present utility model is arranged canopy mechanism more, comprise concrete wall, its feature is fixed with some canopy framves that be arranged in parallel on described concrete wall, the canopy frame vertically is connected with the bracing piece that many rows be arranged in parallel, be connected with at the infall of itself and bracing piece on the canopy frame and refute the pawl seat, refute to be connected with on the pawl seat and refute pawl, refute and be fixed with tempered glass on the pawl.Refute pawl and can be a bolt, its pass behind the hole of reserving on the tempered glass can with refute the pawl seat and be fixed together.The canopy frame is parallelly to be provided with two or more, and so fixing polylith tempered glass needs the tempered glass area laid big more, and canopy sets up upright then many more.With a plurality of canopy framves together, can strengthen bonding strength each other, bracing piece and the canopy frame is orthogonal sets up by the bracing piece cross-under.
As preferably, described adjacent two canopy framves and adjacent two bracing pieces are formed rectangular frame, and each rectangular frame is conflicted internally and is provided with a tempered glass, and four angles of tempered glass respectively are fixed with one and refute pawl.Refuting of promptly mediating is connected with four and refutes pawl on the pawl seat, refute the angle that pawl respectively connects four blocks of tempered glass for four.Be in refuting of end and be connected with two on the pawl seat and refute pawl, refute the angle that pawl respectively connects two blocks of tempered glass for two.Be in refuting of four corners and be connected with one on the pawl seat and refute pawl, only connect the angle of a tempered glass on it.
As preferably, the described pawl seat of refuting connects by linking arm and refutes pawl.Linking arm can refuted rotary fine adjustment on the pawl seat, is convenient to refute the position that pawl adapts to installing hole on the tempered glass.
As preferably, described canopy frame the inner is connected with coupler body, and coupler body is connected the inside of concrete wall.Two coupler bodies all bend inwards, and it can be embedded in the concrete wall, are connected with canopy frame end portion during installation again.
Therefore, it is comparatively simple, rationally to the utlity model has the canopy structure, and it is comparatively convenient to install, and the tempered glass employing refutes pawl and fix, and can not damage characteristics such as glass surface in the time of fixedly.
Description of drawings
Accompanying drawing 1 is a kind of structural representation of the present utility model;
Accompanying drawing 2 is to place the structural representation of going up tempered glass;
Accompanying drawing 3 is A-A section structure for amplifying schematic diagrames of Fig. 2.
Component, position and numbering among the figure: concrete wall 1, canopy frame 2, bracing piece 3, refute pawl seat 4, refute pawl 5, tempered glass 6, linking arm 7, coupler body 8.
The specific embodiment
Below by embodiment, and in conjunction with the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment: this routine steel work is arranged canopy mechanism more, as Fig. 1, Fig. 2, Fig. 3, concrete wall 1 is arranged, and is fixed with a plurality of canopy framves 2 on the concrete wall 1, and canopy frame 2 the inners are connected with coupler body 8, and coupler body is connected the inside of concrete wall 1.Switching has 3 row's bracing pieces 9 between all canopy framves 2.Adjacent two canopy framves 2 are formed rectangular frame with adjacent two bracing pieces 3, all are provided with a tempered glass 6 in each rectangular frame, and all tempered glass are formed canopy.Four angles of tempered glass respectively are fixed with one and refute pawl 5, refute pawl and are connected by linking arm 7 and refute on the pawl seat 4, refute the infall that the pawl seat is located at canopy frame 2 and bracing piece 3.
During use, on concrete wall 1, install the welding canopy frame finished 2 and bracing piece 3, then tempered glass 6 is positioned on the canopy frame 2, tempered glass 6 is fixed got final product with refuting pawl 5.

Claims (4)

1. a steel work is arranged canopy mechanism more, comprise concrete wall (1), its feature is fixed with some canopy framves (2) that be arranged in parallel on described concrete wall (1), the canopy frame vertically is connected with the bracing piece (3) that many rows be arranged in parallel, be connected with at the infall of itself and bracing piece on the canopy frame and refute pawl seat (4), refute to be connected with on the pawl seat and refute pawl (5), refute and be fixed with tempered glass (6) on the pawl.
2. steel work according to claim 1 is arranged canopy mechanism more, it is characterized in that described adjacent two canopy framves (2) and adjacent two bracing pieces (3) composition rectangular frame, each rectangular frame is conflicted internally and is provided with a tempered glass (6), and four angles of tempered glass respectively are fixed with one and refute pawl (5).
3. steel work according to claim 1 and 2 is arranged canopy mechanism more, it is characterized in that the described pawl seat (4) of refuting connects by linking arm (7) and refutes pawl (5).
4. steel work according to claim 1 and 2 is arranged canopy mechanism more, it is characterized in that described canopy frame (2) the inner is connected with coupler body (8), and coupler body is connected the inside of concrete wall (1).
CN2009201594340U 2009-06-25 2009-06-25 Steel structure multirow rain cover mechanism Expired - Fee Related CN201411842Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201594340U CN201411842Y (en) 2009-06-25 2009-06-25 Steel structure multirow rain cover mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201594340U CN201411842Y (en) 2009-06-25 2009-06-25 Steel structure multirow rain cover mechanism

Publications (1)

Publication Number Publication Date
CN201411842Y true CN201411842Y (en) 2010-02-24

Family

ID=41713729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201594340U Expired - Fee Related CN201411842Y (en) 2009-06-25 2009-06-25 Steel structure multirow rain cover mechanism

Country Status (1)

Country Link
CN (1) CN201411842Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481087A (en) * 2014-12-15 2015-04-01 宜宾市旺明广告有限责任公司 Light firm canopy easy for discharging water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481087A (en) * 2014-12-15 2015-04-01 宜宾市旺明广告有限责任公司 Light firm canopy easy for discharging water

Similar Documents

Publication Publication Date Title
CN201526125U (en) Steel structure awning mechanism
CN204455794U (en) A kind of assembled steel bridge
CN204001650U (en) Overhanging scaffold for building
CN201411842Y (en) Steel structure multirow rain cover mechanism
CN207392535U (en) A kind of decorative strip structure of glass curtain wall
CN102041906B (en) Pavilion without bolted connections
CN201024664Y (en) Building formwork support beam and formwork combination device
CN201502148U (en) Sealing type steel structured awning mechanism
CN201962972U (en) Outdoor automobile shed
CN201276672Y (en) Safety protection single-tube armrest straight seat
CN214886133U (en) Assembled enclosure wind-resistant guardrail
KR200450950Y1 (en) Building curtain wall truss connecting structure
CN211691135U (en) Slope lane canopy structure
CN201068658Y (en) Foldable movable house
CN211850245U (en) Mounting structure of big specification aluminum plate curtain wall
CN208650364U (en) A kind of removable truss floor support plate structure
CN201474192U (en) Water flanged board joint structure
CN201671254U (en) Novel awning
CN110965681A (en) Mounting structure of big specification aluminum plate curtain wall
CN205840314U (en) A kind of assembled inner-outer wall composite shuttering mortar leakage prevention device
CN2866214Y (en) Vehicle air suspension rear hanger bracket C-type arm
CN218406130U (en) Novel glass breast board
CN201581503U (en) Steel structure beam supporting mechanism
CN202280271U (en) Car shed
CN201581497U (en) Steel structure column bracing mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100224

Termination date: 20100625