CN201526125U - Steel structure awning mechanism - Google Patents

Steel structure awning mechanism Download PDF

Info

Publication number
CN201526125U
CN201526125U CN2009201791616U CN200920179161U CN201526125U CN 201526125 U CN201526125 U CN 201526125U CN 2009201791616 U CN2009201791616 U CN 2009201791616U CN 200920179161 U CN200920179161 U CN 200920179161U CN 201526125 U CN201526125 U CN 201526125U
Authority
CN
China
Prior art keywords
canopy
fixed
concrete wall
pawl
awning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009201791616U
Other languages
Chinese (zh)
Inventor
朱生根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009201791616U priority Critical patent/CN201526125U/en
Application granted granted Critical
Publication of CN201526125U publication Critical patent/CN201526125U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to an awning mechanism, in particular to a steel structure awning mechanism, which mainly resolves technical problems that the awning structure in the prior art is relatively complex and is inconvenient in installation, glass of the awning structure is fixed via screw nails, and then the surface of the glass is easily damaged when fixed and the like. The steel structure awning mechanism comprises a concrete wall (1), and is characterized in that a plurality of awning frames (2) are fixed on the concrete wall (1), the upper portion of each awning frame is provided with a plane, the plane is connected with two or more than two connecting claw bases (3), the connecting claw bases are connected with two or more than two connecting claws (4), and armored glass (5) is fixed on the connecting claws.

Description

Steel work canopy mechanism
Technical field
The utility model relates to a kind of canopy mechanism, especially relates to a kind of to the isostructural improvement of steel work canopy mechanism.
Background technology
Existing weather levelling sample differs, and employed material is also different, and plastics canopy Yin Qiyi early is aging superseded, and present common with the integrated canopy of glass-reinforced plastic material, it is beautiful attractive in appearance and welcome because of color.But this integrated canopy is an integral manufacturing, installs comparatively difficult.Chinese patent discloses a kind of Fabricated platform awning (notice of authorization number: CN 2758357Y), it comprises standardized production and has standard-sized following assembly: baffle plate, heavy frame and a plurality of built-in fitting, built-in fitting is embedded in the building body, heavy frame comprises two support bars at least, one end of support bar is fixed in built-in fitting, baffle plate is fixed in support bar, and at least two support bars are parallel to each other; Heavy frame also comprises the reinforcing strip that is fixed in support bar, and the brace that is connected with reinforcing strip of end, the other end of brace is fixed in built-in fitting, reinforcing strip is fixed in the below or the top of support bar, described baffle plate be fixed in described support bar above or below, support bar is a T-steel, baffle plate is fixed in the transversary of T-steel, and reinforcing strip is fixed in the vertical structure of T-steel, support bar is fixed by the connector and the built-in fitting that are welded in built-in fitting, connector has double-screw bolt and fixes by bolt and support bar, the end of T-steel is the steel plate that comprises adjustment hole, and the double-screw bolt on the connector passes described adjustment hole and nut is connected and fixed support bar.But this canopy structure is comparatively complicated, and inconvenience is installed, and glass adopts screw, the easy glass surface that damages in the time of fixedly.
The utility model content
The utility model technical issues that need to address provide a kind of steel work canopy mechanism, it mainly is to solve comparatively complexity of existing in prior technology canopy structure, install inconveniently, and glass adopts screw, the technical problem of damage glass surface etc. easily in the time of fixedly.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals:
Steel work canopy of the present utility model mechanism, comprise concrete wall, its feature is fixed with the canopy frame on described concrete wall, the top of canopy frame has a plane, be connected with two or more pawl seats of refuting on the plane, refute and be connected with two or more pawls of refuting on the pawl seat, refute and be fixed with tempered glass on the pawl.Refute pawl and can be a bolt, its pass behind the hole of reserving on the tempered glass can with refute the pawl seat and be fixed together.The canopy frame is parallelly to be provided with two or more, and so fixing polylith tempered glass needs the tempered glass area laid big more, and canopy sets up upright then many more.
As preferably, the section of described canopy frame is " worker " font, and the height of canopy frame outer end is less than the height of the inner.The plane, canopy frame top of " worker " font can be used for installing refutes the pawl seat, and the plane of below is used for bearing weight.
As preferably, be connected with junction plate by connector on the described concrete wall, the canopy frame is fixed on the junction plate.Connector can be chemical anchor bolts, and junction plate is a rectangle, all is fixed on the concrete wall by chemical anchor bolts on its four angles.
As preferably, the described pawl seat of refuting connects by linking arm and refutes pawl.Linking arm can refuted rotary fine adjustment on the pawl seat, is convenient to refute the position that pawl adapts to installing hole on the tempered glass.
As preferably, switching has bracing piece between described some canopy framves.With a plurality of canopy framves together, can strengthen bonding strength each other, bracing piece and the canopy frame is orthogonal sets up by the bracing piece cross-under.
As preferably, be provided with fluid sealant between described tempered glass the inner and the concrete wall, can prevent that rainwater from infiltrating from tempered glass is inner.
Therefore, it is comparatively simple, rationally to the utlity model has the canopy structure, and it is comparatively convenient to install, and the tempered glass employing refutes pawl and fix, and can not damage characteristics such as glass surface in the time of fixedly.
Description of drawings
Accompanying drawing 1 is a kind of structural representation of the present utility model;
Accompanying drawing 2 is A-A section structure for amplifying schematic diagrames of Fig. 1;
Accompanying drawing 3 is B-B cross-sectional view of Fig. 2.
Component, position and numbering among the figure: concrete wall 1, canopy frame 2, refute pawl seat 3, refute pawl 4, tempered glass 5, connector 6, junction plate 7, linking arm 8, bracing piece 9, fluid sealant 10.
The specific embodiment
Below by embodiment, and in conjunction with the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment: the steel work canopy mechanism that this is routine, as Fig. 1, Fig. 2, concrete wall 1 are arranged, be fixed with a plurality of canopy framves 2 on the concrete wall 1, be connected with junction plate 7 by connector 6 on the concrete wall 1, canopy frame 2 is fixed on the junction plate 7.And switching has bracing piece 9 between all canopy framves 2.As Fig. 3, the section of canopy frame is " worker " font, and the height of canopy frame outer end is less than the height of the inner.The top of canopy frame has a plane, is connected with two on the plane and refutes pawl seat 3, refutes pawl seat 3 and is connected with two by linking arm 8 and refutes pawl 4, refutes and is fixed with tempered glass 5 on the pawl.Be provided with fluid sealant 10 between tempered glass 5 the inners and the concrete wall 1.
During use, on concrete wall 1, install canopy frame 2, then tempered glass 5 is positioned on the canopy frame 2, tempered glass 5 is fixed got final product with refuting pawl 4.

Claims (6)

1. steel work canopy mechanism, comprise concrete wall (1), its feature is fixed with some canopy framves (2) on described concrete wall (1), the top of canopy frame has a plane, be connected with two or more pawl seats (3) of refuting on the plane, refute and be connected with two or more pawls (4) of refuting on the pawl seat, refute and be fixed with tempered glass (5) on the pawl.
2. steel work canopy according to claim 1 mechanism is characterized in that the section of described canopy frame (2) is " worker " font, and the height of canopy frame outer end is less than the height of the inner.
3. steel work canopy according to claim 1 and 2 mechanism is characterized in that described concrete wall (1) are gone up to be connected with junction plate (7) by connector (6) that canopy frame (2) is fixed on the junction plate (7).
4. steel work canopy according to claim 1 and 2 mechanism is characterized in that the described pawl seat (3) of refuting connects by linking arm (8) and refutes pawl (4).
5. steel work canopy according to claim 1 and 2 mechanism is characterized in that switching has bracing piece (9) between described some canopy framves (2).
6. steel work canopy according to claim 1 and 2 mechanism is characterized in that being provided with fluid sealant (10) between the inner and concrete wall (1) of described tempered glass (5).
CN2009201791616U 2009-09-26 2009-09-26 Steel structure awning mechanism Expired - Fee Related CN201526125U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201791616U CN201526125U (en) 2009-09-26 2009-09-26 Steel structure awning mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201791616U CN201526125U (en) 2009-09-26 2009-09-26 Steel structure awning mechanism

Publications (1)

Publication Number Publication Date
CN201526125U true CN201526125U (en) 2010-07-14

Family

ID=42517414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201791616U Expired - Fee Related CN201526125U (en) 2009-09-26 2009-09-26 Steel structure awning mechanism

Country Status (1)

Country Link
CN (1) CN201526125U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733561A (en) * 2012-06-20 2012-10-17 曾红 Building canopy
CN105863185A (en) * 2016-05-27 2016-08-17 王春明 Building canopy
CN105926871A (en) * 2016-06-03 2016-09-07 成都格瑞思文化传播有限公司 Building outer wall baffle
CN108582465A (en) * 2018-04-28 2018-09-28 上海宝冶集团有限公司 After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733561A (en) * 2012-06-20 2012-10-17 曾红 Building canopy
CN105863185A (en) * 2016-05-27 2016-08-17 王春明 Building canopy
CN105926871A (en) * 2016-06-03 2016-09-07 成都格瑞思文化传播有限公司 Building outer wall baffle
CN108582465A (en) * 2018-04-28 2018-09-28 上海宝冶集团有限公司 After pour canopy, precast reinforced concrete frame beam and after pour canopy manufacturing method

Similar Documents

Publication Publication Date Title
CN201526125U (en) Steel structure awning mechanism
CN201635218U (en) Aluminum hanging board curtain wall equipment
CN204001650U (en) Overhanging scaffold for building
CN202644872U (en) Rain cover of steel-structure factory building
CN101851989A (en) Solar energy panel frame bracket
CN201502148U (en) Sealing type steel structured awning mechanism
CN201411842Y (en) Steel structure multirow rain cover mechanism
KR200395333Y1 (en) The Fabric For A Bus Platform Establish
CN114000731B (en) Frame construction and use its collection dress board house
CN207354122U (en) Color steel roofing photovoltaic aluminium alloy post system
CN201068658Y (en) Foldable movable house
CN110258771A (en) A kind of vestibule
CN201598583U (en) Reinforcing device of aluminum alloy guardrail vertical post
CN2611461Y (en) Glass fibre reinforced plastic movable dwellings
CN207348509U (en) A kind of structure in pavilion
CN103015647B (en) A kind of subsides wall glass awning and mounting method thereof
CN207193974U (en) A kind of photovoltaic power station array support earth anchor
KR101279775B1 (en) Pagora
CN206174341U (en) Stair are support for guardrail
US9551154B1 (en) Building-mounted awning with single location attachment
CN202280271U (en) Car shed
CN205474839U (en) Bridge railing convenient to dismouting is recycled
CN216156909U (en) Glass curtain wall
CN201321323Y (en) Firm and safe railing structure for elevator
CN215829715U (en) Curtain wall panel fixing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100714

Termination date: 20100926