CN201401294Y - 大功率风力发电塔架 - Google Patents

大功率风力发电塔架 Download PDF

Info

Publication number
CN201401294Y
CN201401294Y CN2009200137530U CN200920013753U CN201401294Y CN 201401294 Y CN201401294 Y CN 201401294Y CN 2009200137530 U CN2009200137530 U CN 2009200137530U CN 200920013753 U CN200920013753 U CN 200920013753U CN 201401294 Y CN201401294 Y CN 201401294Y
Authority
CN
China
Prior art keywords
tower
tower body
nut
joint
power generation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200137530U
Other languages
English (en)
Inventor
崔志忠
金鑫
吴世宇
贾跃东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Dajin Heavy Industry Co., Ltd.
Original Assignee
LIAONING DHI DCW (GROUP) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIAONING DHI DCW (GROUP) CO Ltd filed Critical LIAONING DHI DCW (GROUP) CO Ltd
Priority to CN2009200137530U priority Critical patent/CN201401294Y/zh
Application granted granted Critical
Publication of CN201401294Y publication Critical patent/CN201401294Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

本实用新型属于风力发电设备,特别涉及一种大功率风力发电塔架,包括地基底座(1),在地基底座(1)上设预埋固定件(1-1)和地基预埋件(1-2)与第一节混凝土塔体(2)用螺母(1-3)固定连接,塔架由三节(2、3、4)混凝土塔体组成,每节塔体均用等弧度的三片塔片组成,每片塔片横向连接的侧面上制成齿槽(3-2)形并设预埋件(3-1),组合时用复全混凝土粘合剂粘接并用螺栓(3-5)、螺母(3-4)固定,在第一节(2)、第二节(3)塔体每片上端面中设纵向高强钢筋(7),大功率风力发电塔架拆装方便灵活,满足大功率风力发电塔架的要求,彻底解决了大直径风力发电塔架的吊装运输难题。

Description

大功率风力发电塔架
技术领域
本实用新型属于风力发电设备,特别涉及一种大功率风力发电塔架。
背景技术
风力发电塔架是风力发电设备的重要组成部分,随着风力发电机组功率不断增大,对风力发电塔架的高度、强度提出了更高的要求,由于受运输条件的限制,无限度扩大塔架的直径对于吊装一个很大的难题,现有的设备很难完成。
发明内容
本实用新型的目的在于克服上述技术不足,提供一种便于吊装运输、拆装灵活方便的大功率风力发电塔架。
本实用新型解决技术问题采用的技术方案是:大功率风力发电塔架包括地基底座,其特点是在地基底座上设预埋固定件和地基预埋件与第一节混凝土塔体用螺母固定连接,塔架由三节混凝土塔体组成,每节塔体均用等弧度的三片塔片组成,每片塔片横向连接的侧面上制成齿槽形并设预埋件,组合时用复全混凝土粘合剂粘接并用螺栓、螺母固定,在第一节、第二节塔体每片上端面中设纵向高强钢筋,组合的上一节塔片下端面对应设钢筋槽,在每片端面纵向连接处设多个凹槽,凹槽中用螺栓、螺母固定连接,在第三节塔
Figure G2009200137530D00011
上端固定一个锥台形连接法兰体,法兰体的内侧面设多个加强板,每个加强板中间与下面的塔体和上面的钢塔架用螺栓、螺母固定连接,在三节塔体内的周围设多根通长的纵向高强钢筋,高强钢筋下端铆固在地基底座上,上端与法兰下面的法兰孔固定连接。
本实用新型的有益效果是:大功率风力发电塔架拆装方便灵活,如果按公路桥梁限高4.5米,限宽3.5米的道路条件,塔筒的最大直径可以做到12米,满足大功率风力发电塔架的要求,彻底解决了大直径风力发电塔架的吊装运输难题。
附图说明
以下结合附图以实施例具体说明。
图1是大功率风力发电塔架外部结构图。
图2是图1的拆开图。
图3是图2中的I处局部放大图。
图4是图2中的II处局部放大图。
图5是图2中的III处局部放大图。
图6是图2中的IV处局部放大图。
图7是图2中的V处局部放大图。
图中,1-底座;1-1-预埋固定件;1-2-地基预埋件;1-3-固定件;2-第一节塔体;3-第二节塔体;3-1-塔片连接预埋件;3-2-齿槽;3-3-复合水泥粘结剂;3-4-固定螺母;3-5-固定螺栓;4-第三节塔体;5-连接法兰体;5-1-钢架连接孔;5-2-钢塔架连接螺栓;5-3-转换件链接;5-4-加强板;6-纵向高强钢筋;7-塔片中纵向高强钢筋;
具体实施方式
实施例,参照附图1、2,大功率风力发电塔架由三节带有锥度的混凝土塔体2、3、4、底座1和连接法兰5组合而成,每节塔体均由三片中心角120度的弧形塔片组成,参照附图3、7,塔片之间连接是在每片的侧面上设预埋件3-1并设有齿槽3-2,在齿槽3-2和齿口中填满复合水泥粘结剂3-3并用预埋件3-1、螺栓3-5、螺母3-4固定一起。在第一节、第二节塔体2、3的每个塔片上端面中设纵向高强钢筋7、在第二、第三节塔体3、4的每个塔片下端对应高强钢筋7设槽,高强钢筋7插入槽中,起加固作用。参照附图4、5,在第一节塔体2的塔片底部及上部设数个凹槽,底部的凹槽中用螺母1-3把底座1上的预埋固定件1-1和地基预埋件1-2固定一起。第二、第三节塔体3、4的横向连接同样在每片塔片的对应上、下端设数个凹槽,用螺母3-4、螺栓3-5固定连接一起。参照附图6,在第三节塔体4的顶端用连接件固定锥台形的连接法兰5。法兰5的内壁上设转换件链接5-3,在转换件链接5-3中设数个加强板5-4。在法兰5的上端用连接孔5-1、钢塔法兰连接件5-2固定装钢塔架8。在三节塔体2、3、4内的周围设多根通长的纵向高强钢筋6,高强钢筋6的下端铆固在地基底座1上,上端与法兰5下面的孔固定连接,使法兰5与地基底座1和每节塔体结合牢固。

Claims (1)

1、一种大功率风力发电塔架,包括地基底座(1),其特征在于在地基底座(1)上设预埋固定件(1-1)和地基预埋件(1-2)与第一节混凝土塔体(2)用螺母(1-3)固定连接,塔架由三节(2、3、4)混凝土塔体组成,每节塔体均用等弧度的三片塔片组成,每片塔片横向连接的侧面上制成齿槽(3-2)形并设预埋件(3-1),组合时用复全混凝土粘合剂粘接并用螺栓(3-5)、螺母(3-4)固定,在第一节(2)、第二节(3)塔体每片上端面中设纵向高强钢筋(7),组合的上一节塔片下端面对应设钢筋槽,在每片端面纵向连接处设多个凹槽,凹槽中用螺栓(3-6)、螺母(3-4)固定连接,在第三节塔体上端固定一个锥台形连接法兰体(5),法兰体(5)的内侧面设多个加强板(5-4),每个加强板(5-4)中间与下面的塔体(4)和上面的钢塔架(8)用螺栓(5-2)、螺母固定连接,在三节塔体(2、3、4)内的周围设多根通长的纵向高强钢筋(6),高强钢筋(6)下端铆固在地基底座(1)上,上端与法兰(5)下面的法兰孔固定连接。
CN2009200137530U 2009-05-13 2009-05-13 大功率风力发电塔架 Expired - Fee Related CN201401294Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200137530U CN201401294Y (zh) 2009-05-13 2009-05-13 大功率风力发电塔架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200137530U CN201401294Y (zh) 2009-05-13 2009-05-13 大功率风力发电塔架

Publications (1)

Publication Number Publication Date
CN201401294Y true CN201401294Y (zh) 2010-02-10

Family

ID=41661094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200137530U Expired - Fee Related CN201401294Y (zh) 2009-05-13 2009-05-13 大功率风力发电塔架

Country Status (1)

Country Link
CN (1) CN201401294Y (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330646A (zh) * 2011-08-26 2012-01-25 姚瑜宁 风力发电机塔架及其运输组装方法
CN102720644A (zh) * 2012-05-03 2012-10-10 沈阳华创风能有限公司 一种塔筒结构
CN103883482A (zh) * 2014-03-28 2014-06-25 北京金风科创风电设备有限公司 预制混凝土筒节、其制造方法及风机塔筒
CN104373304A (zh) * 2014-11-19 2015-02-25 天水锻压机床(集团)有限公司 组合式风力发电塔塔体
WO2015177377A1 (de) * 2014-05-23 2015-11-26 Wobben Properties Gmbh Windenergieanlagen-turm und verfahren zum errichten eines windenergieanlagen-turms
CN106438214A (zh) * 2016-10-08 2017-02-22 霍尔果斯新国金新能源科技有限公司 用于风力发电机的塔筒
CN106640539A (zh) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 用于风力发电机的塔筒
CN106640538A (zh) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 塔筒构件及其灌浆方法
CN108301983A (zh) * 2018-03-06 2018-07-20 中国电建集团华东勘测设计研究院有限公司 一种分片预制式风电机组预应力混凝土塔筒
CN108301982A (zh) * 2017-01-12 2018-07-20 上海泰胜风能装备股份有限公司 分片式风机塔筒及其制造方法和运输方法
CN108468621A (zh) * 2018-01-22 2018-08-31 佛山尉达科技有限公司 风力发电装置
CN108468618A (zh) * 2018-01-22 2018-08-31 佛山尉达科技有限公司 风力发电设备
CN109072878A (zh) * 2016-04-08 2018-12-21 乌本产权有限公司 连接体,风能设备塔环形段和用于连接两个风能设备塔环形段的方法
CN111732016A (zh) * 2020-06-04 2020-10-02 东营胜滋自动化科技有限责任公司 模块化组装的绞车卷筒及绞车

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102330646A (zh) * 2011-08-26 2012-01-25 姚瑜宁 风力发电机塔架及其运输组装方法
CN102720644A (zh) * 2012-05-03 2012-10-10 沈阳华创风能有限公司 一种塔筒结构
CN103883482A (zh) * 2014-03-28 2014-06-25 北京金风科创风电设备有限公司 预制混凝土筒节、其制造方法及风机塔筒
JP2017516952A (ja) * 2014-05-23 2017-06-22 ヴォッベン プロパティーズ ゲーエムベーハーWobben Properties Gmbh 風力発電装置−タワーおよび風力発電装置−タワーの設置方法
WO2015177377A1 (de) * 2014-05-23 2015-11-26 Wobben Properties Gmbh Windenergieanlagen-turm und verfahren zum errichten eines windenergieanlagen-turms
US9841007B2 (en) 2014-05-23 2017-12-12 Wobben Properties Gmbh Wind turbine tower and method for erecting a wind turbine tower
CN104373304A (zh) * 2014-11-19 2015-02-25 天水锻压机床(集团)有限公司 组合式风力发电塔塔体
CN104373304B (zh) * 2014-11-19 2017-04-12 天水锻压机床(集团)有限公司 组合式风力发电塔塔体
CN109072878A (zh) * 2016-04-08 2018-12-21 乌本产权有限公司 连接体,风能设备塔环形段和用于连接两个风能设备塔环形段的方法
CN106640538A (zh) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 塔筒构件及其灌浆方法
CN106640539A (zh) * 2016-10-08 2017-05-10 霍尔果斯新国金新能源科技有限公司 用于风力发电机的塔筒
CN106438214A (zh) * 2016-10-08 2017-02-22 霍尔果斯新国金新能源科技有限公司 用于风力发电机的塔筒
CN106640538B (zh) * 2016-10-08 2024-07-05 上海风领新能源有限公司 塔筒构件及其灌浆方法
CN108301982A (zh) * 2017-01-12 2018-07-20 上海泰胜风能装备股份有限公司 分片式风机塔筒及其制造方法和运输方法
CN108468621A (zh) * 2018-01-22 2018-08-31 佛山尉达科技有限公司 风力发电装置
CN108468618A (zh) * 2018-01-22 2018-08-31 佛山尉达科技有限公司 风力发电设备
CN108301983A (zh) * 2018-03-06 2018-07-20 中国电建集团华东勘测设计研究院有限公司 一种分片预制式风电机组预应力混凝土塔筒
CN111732016A (zh) * 2020-06-04 2020-10-02 东营胜滋自动化科技有限责任公司 模块化组装的绞车卷筒及绞车

Similar Documents

Publication Publication Date Title
CN201401294Y (zh) 大功率风力发电塔架
CN102135077A (zh) 一种张拉式多段混凝土风电塔架
CN201310072Y (zh) 桥梁施工支撑托架
CN202039377U (zh) 预应力钢绞线组合锚栓
CN202545137U (zh) 体内预应力植筋连接式混凝土风电塔架
CN206785083U (zh) 一种具有高稳固支撑性能的组合式抱杆
CN202099809U (zh) 特高压钢管插入式基础和特高压铁塔
CN103806373B (zh) 斜拉装配式公路钢桥斜拉索锚固系统
CN201943080U (zh) 大功率预应力六片式混凝土塔架
CN202090658U (zh) 一种用于钢管塔的节点连接的插板、钢管塔及其节点
CN216197040U (zh) 输电线路耐张型酒杯钻越塔
CN201661107U (zh) 铁塔变截面组合接头
CN202031370U (zh) 一种混凝土-钢结构复合风电塔架
CN210396223U (zh) 一种光伏电站杆塔加固装置
CN205046924U (zh) 带有可一次张拉柔性斜杆的风力发电塔
CN201963021U (zh) 后张拉式预应力多段混凝土风电塔架
CN212002582U (zh) 一种具有高稳定性的通信铁塔
CN210002235U (zh) 大跨度非对称斜拉桥配重结构
CN202017584U (zh) 一种张拉式多段混凝土风电塔架
CN201521034U (zh) 一种轻钢管网架节点构件
CN209367674U (zh) 一种大吨位桥面起重机专用锚固拉杆装置
CN209177853U (zh) 一种用于法兰结构型式钢管的吊装横梁
CN203373657U (zh) 一种上弦杆加长型装配式主梁
CN201817774U (zh) 支架系统的三角支架
CN216429144U (zh) 一种高稳定性输变电塔用支撑辅助机构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: LIAONING DAJIN HEAVY INDUSTRIES STOCK CO., LTD.

Free format text: FORMER NAME: LIAONING DAJIN STEEL STRUCTURE ENGINE (GROUP) CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Fuxin City, Liaoning Province, 123000 New Street No. 155

Patentee after: Liaoning Dajin Heavy Industry Co., Ltd.

Address before: Fuxin City, Liaoning Province, 123000 New Street No. 155

Patentee before: Liaoning DHI DCW (Group) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100210

Termination date: 20180513

CF01 Termination of patent right due to non-payment of annual fee