CN201378313Y - Device for on/off fatigue tests used for microcomputer and server - Google Patents
Device for on/off fatigue tests used for microcomputer and server Download PDFInfo
- Publication number
- CN201378313Y CN201378313Y CN200920020977U CN200920020977U CN201378313Y CN 201378313 Y CN201378313 Y CN 201378313Y CN 200920020977 U CN200920020977 U CN 200920020977U CN 200920020977 U CN200920020977 U CN 200920020977U CN 201378313 Y CN201378313 Y CN 201378313Y
- Authority
- CN
- China
- Prior art keywords
- relay
- control module
- module
- timing
- microcomputer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009661 fatigue test Methods 0.000 title abstract 4
- 238000012360 testing method Methods 0.000 claims description 20
- 238000007689 inspection Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Test And Diagnosis Of Digital Computers (AREA)
Abstract
The utility model discloses a device for on/off fatigue tests used for a microcomputer and a server, which belongs to a device for on/off fatigue tests, and comprises a power supply control module, a delay control module, a machine switch recognition module, a counting module and a software module, wherein the power supply control module comprises an AC contactor and a relay; the delay control module comprises a delay relay; the machine switch recognition module comprises a relay and a computer power supply output interface connected to the relay; the counting module comprises a counting switch; and the software module carries out machine hardware configuration examination. Compared with the prior art, the device has the advantages that the manual operation workload in the on/off fatigue test process is reduced, the personnel is free from work, and the work efficiency is improved.
Description
Technical field
The utility model relates to a kind of device that is used for the switching on and shutting down testing fatigue, specifically a kind of device that is used for microcomputer and server switching on and shutting down testing fatigue.
Background technology
In the development﹠ testing process of microcomputer and server, be the stability of detection machine, the test of start again after a large amount of switching on and shutting down tests and the outage is effective means.This part work major part is by manually operating, and mechanical workload is big and uninteresting, and efficient is low, the production cost height.
The utility model content
Technical assignment of the present utility model is at above weak point, provide a kind of minimizing for the manually-operated workload in the switching on and shutting down testing fatigue process, liberation personnel, improved a kind of device that is used for microcomputer and server switching on and shutting down testing fatigue of work efficiency.
The technical scheme that its technical matters that solves the utility model adopts is: comprise energy supply control module, time-delay control module, machine switch identification module, counting module and software module, energy supply control module comprises A.C. contactor and relay, the time-delay control module comprises timing relay, machine switch identification module comprises relay and the computer power supply output interface that is connected with relay, counting module comprises counter switch, and software module is carried out the machine hardware configuration inspection.
Energy supply control module comprises two A.C. contactors and relay, two A.C. contactors all connect 220V output voltage and 220V input voltage, an A.C. contactor is connected with relay, another A.C. contactor is connected with the timing relay of time-delay control module, the interface of often opening of the relay in relay and the machine switch identification module is connected, and is provided with manually constantly electrical testing switch between two relays.
The time-delay control module comprises three timing relays, the computer switch interface connects first timing relay, second timing relay of first timing relay series connection, second timing relay is connected with one of them A.C. contactor of energy supply control module, the normally closed interface of the relay in second timing relay and the machine switch identification module is connected, the interface of often opening of the relay in the 3rd timing relay and the machine switch identification module is connected the 3rd the external alarm module of timing relay.
The interface of often opening of the relay in the counter switch in the counting module and the machine switch identification module is connected, and counter switch connects power supply.
Energy supply control module is realized the external power supply of machine is controlled, and the time-delay of being scheduled to, to reach the function of automatic switching; The time-delay control module can Preset Time, the instruction of sending switching on and shutting down and power on/off by the default time, the interval time of coming the gauge tap machine; Machine switch identification module is utilized the power light signal of mainboard, differentiates the on-off state of machine, and sends the instruction of start according to the state of shutdown, and the function that encounters problems and report to the police is automatically arranged; The instruction that counting module sends according to machine switch identification module is counted, and can set, demonstration, gauge tap machine number of times; Software module is carried out the machine hardware configuration inspection, can realize that machine shuts down automatically.
A kind of microcomputer that is used for of the present utility model is compared with prior art with the device of server switching on and shutting down testing fatigue, has the following advantages or good effect:
1, reduces artificial operation, increase work efficiency, and then improve the quality level of microcomputer and server;
2, making is simple, investment is less, easy to use easy-to-use, can make things convenient for configuration switch machine number of times and counting intuitively, and phenomenon of the failure can be kept to perform an analysis;
3, can cut off the power supply automatically and power on by the delay time of setting;
4, test process encounters problems automatic alarm.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further specified.
Accompanying drawing 1 is a kind of circuit theory diagrams that are used for the device of microcomputer and server switching on and shutting down testing fatigue.
Among the figure: zone 1 is an energy supply control module, and zone 2 is the time-delay control module, and zone 3 is a machine switch identification module, and zone 4 is a counting module.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
A kind of device that is used for microcomputer and server switching on and shutting down testing fatigue of the present utility model, comprise energy supply control module 1, time-delay control module 2, machine switch identification module 3, counting module 4 and software module, energy supply control module 1 comprises A.C. contactor and relay, time-delay control module 2 comprises timing relay, machine switch identification module 3 comprises relay and the computer power supply output interface that is connected with relay, counting module 4 comprises counter switch, and software module is carried out the machine hardware configuration inspection.
Energy supply control module 1 comprises two A.C. contactors and relay, two A.C. contactors all connect 220V output voltage and 220V input voltage, an A.C. contactor is connected with relay, another A.C. contactor is connected with the timing relay of time-delay control module 2, the interface of often opening of the relay in relay and the machine switch identification module 3 is connected, and is provided with manually constantly electrical testing switch between two relays.
Time-delay control module 2 comprises three timing relays, the computer switch interface connects first timing relay, second timing relay of first timing relay series connection, second timing relay is connected with one of them A.C. contactor of energy supply control module 1, the normally closed interface of the relay in second timing relay and the machine switch identification module 3 is connected, the interface of often opening of the relay in the 3rd timing relay and the machine switch identification module 3 is connected the 3rd the external alarm module of timing relay.
The interface of often opening of the relay in the counter switch in the counting module 4 and the machine switch identification module 3 is connected, and counter switch connects power supply.
A kind of its processing and fabricating of device that is used for microcomputer and server switching on and shutting down testing fatigue of the present utility model is very simple and convenient, and processing and fabricating gets final product shown in the by specification accompanying drawing.
Except that the described technical characterictic of instructions, be the known technology of those skilled in the art.
Claims (4)
1, a kind of device that is used for microcomputer and server switching on and shutting down testing fatigue, it is characterized in that comprising energy supply control module, time-delay control module, machine switch identification module, counting module and software module, energy supply control module comprises A.C. contactor and relay, the time-delay control module comprises timing relay, machine switch identification module comprises relay and the computer power supply output interface that is connected with relay, counting module comprises counter switch, and software module is carried out the machine hardware configuration inspection.
2, a kind of device that is used for microcomputer and server switching on and shutting down testing fatigue according to claim 1, it is characterized in that energy supply control module comprises two A.C. contactors and relay, two A.C. contactors all connect 220V output voltage and 220V input voltage, an A.C. contactor is connected with relay, another A.C. contactor is connected with the timing relay of time-delay control module, the interface of often opening of the relay in relay and the machine switch identification module is connected, and is provided with manually constantly electrical testing switch between two relays.
3, a kind of device that is used for microcomputer and server switching on and shutting down testing fatigue according to claim 1, the control module that it is characterized in that delaying time comprises three timing relays, the computer switch interface connects first timing relay, second timing relay of first timing relay series connection, second timing relay is connected with one of them A.C. contactor of energy supply control module, the normally closed interface of the relay in second timing relay and the machine switch identification module is connected, the interface of often opening of the relay in the 3rd timing relay and the machine switch identification module is connected the 3rd the external alarm module of timing relay.
4, a kind of device that is used for microcomputer and server switching on and shutting down testing fatigue according to claim 1, the interface of often opening that it is characterized in that the relay in counter switch and the machine switch identification module in the counting module is connected, and counter switch connects power supply.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920020977U CN201378313Y (en) | 2009-04-16 | 2009-04-16 | Device for on/off fatigue tests used for microcomputer and server |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920020977U CN201378313Y (en) | 2009-04-16 | 2009-04-16 | Device for on/off fatigue tests used for microcomputer and server |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201378313Y true CN201378313Y (en) | 2010-01-06 |
Family
ID=41518430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920020977U Expired - Fee Related CN201378313Y (en) | 2009-04-16 | 2009-04-16 | Device for on/off fatigue tests used for microcomputer and server |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201378313Y (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102854423A (en) * | 2012-09-14 | 2013-01-02 | 上海斐讯数据通信技术有限公司 | Method for testing starting reliability of equipment |
CN103970630A (en) * | 2014-05-23 | 2014-08-06 | 浪潮电子信息产业股份有限公司 | Method for testing overall stability of server |
CN104615520A (en) * | 2015-03-10 | 2015-05-13 | 浪潮集团有限公司 | Test method for evaluating startup and shutdown life of server |
CN105068900A (en) * | 2015-07-27 | 2015-11-18 | 浪潮电子信息产业股份有限公司 | Testing method for remote control server cold reboot |
CN105138437A (en) * | 2015-08-25 | 2015-12-09 | 浪潮电子信息产业股份有限公司 | SmartRack multi-node parallel rebot test method based on fatigue test machine and 4U jig |
CN107133134A (en) * | 2017-04-28 | 2017-09-05 | 郑州云海信息技术有限公司 | A kind of efficient RAID card Auto-Test System and method |
CN107168838A (en) * | 2017-05-16 | 2017-09-15 | 郑州云海信息技术有限公司 | A kind of RAID card Auto-Test System |
CN107729201A (en) * | 2017-10-27 | 2018-02-23 | 郑州云海信息技术有限公司 | A kind of server method for testing fatigue and system |
CN109324252A (en) * | 2017-07-31 | 2019-02-12 | 英业达科技有限公司 | Power key test macro and method |
-
2009
- 2009-04-16 CN CN200920020977U patent/CN201378313Y/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102854423A (en) * | 2012-09-14 | 2013-01-02 | 上海斐讯数据通信技术有限公司 | Method for testing starting reliability of equipment |
CN103970630A (en) * | 2014-05-23 | 2014-08-06 | 浪潮电子信息产业股份有限公司 | Method for testing overall stability of server |
CN104615520A (en) * | 2015-03-10 | 2015-05-13 | 浪潮集团有限公司 | Test method for evaluating startup and shutdown life of server |
CN105068900A (en) * | 2015-07-27 | 2015-11-18 | 浪潮电子信息产业股份有限公司 | Testing method for remote control server cold reboot |
CN105138437A (en) * | 2015-08-25 | 2015-12-09 | 浪潮电子信息产业股份有限公司 | SmartRack multi-node parallel rebot test method based on fatigue test machine and 4U jig |
CN107133134A (en) * | 2017-04-28 | 2017-09-05 | 郑州云海信息技术有限公司 | A kind of efficient RAID card Auto-Test System and method |
CN107168838A (en) * | 2017-05-16 | 2017-09-15 | 郑州云海信息技术有限公司 | A kind of RAID card Auto-Test System |
CN109324252A (en) * | 2017-07-31 | 2019-02-12 | 英业达科技有限公司 | Power key test macro and method |
CN107729201A (en) * | 2017-10-27 | 2018-02-23 | 郑州云海信息技术有限公司 | A kind of server method for testing fatigue and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201378313Y (en) | Device for on/off fatigue tests used for microcomputer and server | |
CN201203627Y (en) | Auto-switch power supply device for test and test system composed by the same | |
CN202524167U (en) | A state detection and intelligent control device for high-voltage circuit breaker | |
CN106405403B (en) | Intelligent testing equipment for function test of charge control circuit breaker | |
CN202948109U (en) | Apparatus for automatically detecting time-delay characteristic of breaker | |
CN201707433U (en) | Intelligent controller characteristic test instrument | |
CN202330638U (en) | Online automatic test system for printed circuit board | |
CN202486273U (en) | Digital insulation testing device | |
CN202102059U (en) | Power unit testing apparatus | |
CN203327035U (en) | Automatic on-off detection system for router | |
CN203310938U (en) | Startup/shutdown test system of electronic device | |
CN204479735U (en) | Transmission line malfunction indicator proving installation | |
CN104897982A (en) | Function test system and method of over-current protection card | |
CN201548579U (en) | Delayed-response transducer for withstand voltage test of transformer | |
CN201886091U (en) | Tester of frequency converter | |
CN204360172U (en) | Large-scale automatic centrifugation ore separators PLC control system | |
CN204538812U (en) | A kind of electric force monitoring apparatus realizing timing automatic and patrol and examine | |
CN203313211U (en) | Automatic startup and shutdown detection system for router | |
CN203164392U (en) | LED power source intelligent detection system | |
CN102590684A (en) | Full-automatic insulated comprehensive testing device | |
CN105572514A (en) | Independent testing system and method of uninterruptible power supply static bypass switch interface board | |
CN206248741U (en) | A kind of AC servo driver overload automatic test device | |
CN204215220U (en) | A kind of Direct Current Power Supervise Control System based on PLC | |
CN110365112B (en) | Intelligent substation big data mining application method based on reality virtual technology | |
CN202075352U (en) | Automatic performance test circuit for dust collectors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |