CN107729201A - A kind of server method for testing fatigue and system - Google Patents

A kind of server method for testing fatigue and system Download PDF

Info

Publication number
CN107729201A
CN107729201A CN201711023430.5A CN201711023430A CN107729201A CN 107729201 A CN107729201 A CN 107729201A CN 201711023430 A CN201711023430 A CN 201711023430A CN 107729201 A CN107729201 A CN 107729201A
Authority
CN
China
Prior art keywords
server
measured
current value
abnormality
input current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711023430.5A
Other languages
Chinese (zh)
Inventor
路明远
王超
王守昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201711023430.5A priority Critical patent/CN107729201A/en
Publication of CN107729201A publication Critical patent/CN107729201A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/2273Test methods
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/26Functional testing
    • G06F11/263Generation of test inputs, e.g. test vectors, patterns or sequences ; with adaptation of the tested hardware for testability with external testers

Abstract

The present invention relates to server test technical field, there is provided a kind of server method for testing fatigue and system, control fatigue machine read the input current value of server to be measured;When the input current value for the server to be measured that fatigue machine is read is less than default second current value, fatigue machine powers off to server to be measured, and carries out electricity on automatic to server to be measured after the time threshold set;In server power up to be measured, server to be measured is circulated and performs startup and shutdown operation, in the startup and shutdown of server to be measured, when there is abnormality in server to be measured, control does not perform power operation to server to be measured, so as to realize the test that powers on/off to server to be measured, while when the states such as the machine of delaying occurs in system, be not in the phenomenon for forcing power-off, ensure testing fatigue quality and case study promptly and accurately.

Description

A kind of server method for testing fatigue and system
Technical field
The invention belongs to server test technical field, more particularly to a kind of server method for testing fatigue and system.
Background technology
Server is also referred to as servomechanism, is to provide the equipment of the service of calculating.Because server needs to respond service request, go forward side by side Row processing, therefore in general server should possess the service of undertaking and ensure the ability of service.The composition of server includes place Device, hard disk, internal memory, system bus etc. are managed, it is similar with general computer architecture, but due to needing to provide highly reliable clothes Business, therefore require higher in disposal ability, stability, reliability, security, scalability, manageability etc..In network Under environment, the service type provided according to server is different, is divided into file server, database server, application program service Device, WEB server etc..
For server, it is necessary to carry out a variety of tests before dispatching from the factory, wherein AC testing fatigues are exactly one of which.In server During carrying out AC testing fatigues, existing AC fatigue machines are to allow AC fatigue machines to complete upper electricity and power-off by the time of setting Operating, the time range of testing fatigue is far longer than system boot to the time of shutdown in this case, and if in system Appearance delay the abnormal conditions such as machine, blue screen when, fatigue machine still can in the time range of setting give test server power-off, it is this Method of testing both wastes the testing time, is unfavorable for the discovery and analysis of test problem again, has had a strong impact on the overall product of server Matter.
The content of the invention
It is an object of the invention to provide a kind of server method for testing fatigue, it is intended to solves server in the prior art Testing fatigue intelligence degree is relatively low, both wastes the testing time, is unfavorable for the discovery and analysis of test problem again, influences server The problem of quality.
The present invention is achieved in that a kind of server method for testing fatigue, and methods described comprises the steps:
Fatigue machine is controlled to read the input current value of server to be measured;
When the input current value for the server to be measured that the fatigue machine is read is less than default second current value, fatigue Machine powers off to server to be measured, and carries out electricity on automatic to the server to be measured after the time threshold set;
In the server power up to be measured, startup and shutdown operation is performed to the server circulation to be measured, wherein, In the startup and shutdown of the server to be measured, when abnormality occurs in the server to be measured, control is not treated to described Survey server and perform power operation.
As an improvement scheme, in the server power up to be measured, the server circulation to be measured is performed Startup and shutdown operate, wherein, in the startup and shutdown of the server to be measured, when abnormal shape occurs in the server to be measured During state, control does not specifically include following step to the step of server execution power operation to be measured:
After upper electricity, the server start to be measured, and in start process, it is different to judge whether the server to be measured occurs Normal state, wherein, the abnormality of the server to be measured includes delay machine and blue screen state;
When the server to be measured is in abnormality, then controls and power operation do not performed to the server to be measured, The input current value of the server to be measured, which is in, is more than default first electric current state of value;
When the server to be measured is in non-abnormality, the shutdown script in the server to be measured, control are performed The server shutdown to be measured;
Judge whether the server to be measured abnormality occurs in shutdown process;
When occurring abnormality in shutdown process, control does not perform power operation to the server to be measured, described The input current value of server to be measured, which is in, is more than default first electric current state of value;
When there is not abnormality in shutdown process, control and the input current value of the server to be measured is read Take, and judge whether the input current value is less than second current value;
If it is determined that when the input current value is less than second current value, then controls and powered off to the server to be measured, And return and perform the step of control fatigue machine reads the input current value of server to be measured.
As an improvement scheme, methods described also comprises the steps:
When the server to be measured is in the abnormality of switching on and shutting down, the termination test instruction of user's input is received, and The server shutdown to be measured is controlled, is powered off simultaneously.
As an improvement scheme, methods described also comprises the steps:
Test environment is pre-configured with, wherein, under the test environment, the fatigue machine connects institute by power line respectively State server and AC power supplies to be measured.
As an improvement scheme, methods described also comprises the steps:
First current value and the second current value are pre-set, wherein, it is in open state in the server to be measured When, the size of input current value is more than second current value, and in the power-offstate, the input current value is less than described second Current value, and second current value is less than first current value.
Another object of the present invention is to provide a kind of server fatigue test system, the system includes:
First input current value read module, for controlling fatigue machine to read the input current value of server to be measured;
Start shooting detection module, the input current value of server to be measured for being read when the fatigue machine is less than default During the second current value, fatigue machine powers off to server to be measured, and to the server to be measured after the time threshold set Carry out automatic upper electricity;
Loop test control module, in the server power up to be measured, being held to the server circulation to be measured Row startup and shutdown operate, wherein, in the startup and shutdown of the server to be measured, when exception occurs in the server to be measured During state, control does not perform power operation to the server to be measured.
As an improvement scheme, the loop test control module specifically includes:
Starting module, after upper electricity, the server start to be measured;
First abnormality judge module, in start process, judging whether the server to be measured exception occurs State, wherein, the abnormality of the server to be measured includes delay machine and blue screen state;
First not power-off control module, for when the server to be measured is in abnormality, then controlling not to described Server to be measured performs power operation, and the input current value of the server to be measured, which is in, is more than default first current value shape State;
Shutdown control module, for when the server to be measured is in non-abnormality, performing the server to be measured Interior shutdown script, the control server shutdown to be measured;
Second abnormality judge module, for judging whether the server to be measured abnormal shape occurs in shutdown process State;
Second not power-off control module, for when occurring abnormality in shutdown process, controlling not to described to be measured Server performs power operation, and the input current value of the server to be measured, which is in, is more than default first electric current state of value;
Second input current value read module, for when there is not abnormality in shutdown process, controlling to described The input current value of server to be measured is read out;
Current value judge module, for judging whether the input current value is less than second current value;
Power-off control module, for if it is determined that when the input current value is less than second current value, then controlling to institute Server power-off to be measured is stated, and returns and performs the step of control fatigue machine reads the input current value of server to be measured.
As an improvement scheme, the system also includes:
EOT end of test control module, during abnormality for being in switching on and shutting down when the server to be measured, receive user The termination test instruction of input, and the server shutdown to be measured is controlled, power off simultaneously.
As an improvement scheme, the system also includes:
Test environment configuration module, for being pre-configured with test environment, wherein, under the test environment, the fatigue Machine connects the server to be measured and AC power supplies by power line respectively.
As an improvement scheme, the system also includes:
Current value presetting module, for pre-setting first current value and the second current value, wherein, described to be measured When server is in open state, the size of input current value is more than second current value, in the power-offstate, the input Current value is less than second current value, and second current value is less than first current value.
In embodiments of the present invention, fatigue machine is controlled to read the input current value of server to be measured;When fatigue machine is read The input current value of server to be measured when being less than default second current value, fatigue machine powers off to server to be measured, and Electricity on automatic is carried out to server to be measured after the time threshold set;In server power up to be measured, to server to be measured Circulation performs startup and shutdown operation, in the startup and shutdown of server to be measured, when there is abnormality in server to be measured, Control does not perform power operation to server to be measured, so as to realize the test that powers on/off to server to be measured, while in system Appearance delay the states such as machine when, be not in the phenomenon for forcing power-off, ensure the timely standard of testing fatigue quality and case study Really.
Brief description of the drawings
Fig. 1 is the implementation process figure of server method for testing fatigue provided by the invention;
Fig. 2 be in server power up to be measured provided by the invention the server circulation to be measured is performed start and Power-off operation, wherein, in the startup and shutdown of the server to be measured, when there is abnormality in the server to be measured, Control does not perform the implementation process figure of power operation to the server to be measured;
Fig. 3 is the structured flowchart of server fatigue test system provided by the invention;
Fig. 4 is the structured flowchart of loop test control module provided by the invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Fig. 1 shows the implementation process figure of server method for testing fatigue provided by the invention, and it specifically includes following steps Suddenly:
In step S101, control fatigue machine reads the input current value of server to be measured.
In step s 102, the input current value of the server to be measured read when the fatigue machine is less than default second During current value, fatigue machine is powered off to server to be measured, and the server to be measured is carried out after the time threshold set Automatic upper electricity.
In step s 103, in server power up to be measured, server to be measured is circulated and performs startup and shutdown operation, Wherein, in the startup and shutdown of server to be measured, when abnormality occurs in server to be measured, control not to server to be measured Perform power operation.
As shown in Fig. 2 in server power up to be measured, startup and shutdown behaviour is performed to the server circulation to be measured Make, wherein, in the startup and shutdown of the server to be measured, when abnormality occurs in the server to be measured, control is not The step of performing power operation to the server to be measured specifically includes following step:
In step s 201, after upper electricity, the server start to be measured.
In step S202, in start process, judge whether the server to be measured abnormality occurs, be to perform Step S203, otherwise perform step S204.
Wherein, the abnormality of server to be measured includes delay machine and blue screen state.
In step S203, when server to be measured is in abnormality, then controls and power-off is not performed to server to be measured Operation, now, the input current value of the server to be measured, which is in, is more than default first electric current state of value.
In step S204, when server to be measured is in non-abnormality, the shutdown in the server to be measured is performed Script, the control server shutdown to be measured.
In step S205, judge whether server to be measured abnormality occurs in shutdown process, be, perform step S206, otherwise perform step S207.
In step S206, when occurring abnormality in shutdown process, control does not perform to the server to be measured Power operation, the input current value of the server to be measured, which is in, is more than default first electric current state of value.
In step S207, when there is not abnormality in shutdown process, control to the defeated of the server to be measured Enter current value to be read out.
In step S208, judge whether the input current value is less than second current value, be to perform step S209, otherwise wait for.
In step S209, if it is determined that when the input current value is less than second current value, then controls and treated to described Server power-off is surveyed, and returns and performs the step of control fatigue machine reads the input current value of server to be measured.
The embodiment it is above-mentioned give specific testing fatigue realize step, will not be repeated here.
In embodiments of the present invention, when the server to be measured is in the abnormality of switching on and shutting down, user's input is received Termination test instruction, and control the server to be measured shutdown, power off simultaneously.
Also need to perform following step before above-mentioned steps S101 is performed:
Test environment is pre-configured with, wherein, under the test environment, the fatigue machine connects described treat by power line respectively Server and AC power supplies are surveyed, other test environments can also be set certainly, will not be repeated here;
First current value and the second current value are pre-set, wherein, it is in open state in the server to be measured When, the size of input current value is more than second current value, and in the power-offstate, the input current value is less than described second Current value, and second current value is less than first current value.
In embodiments of the present invention, testing fatigue process is mainly input current value of the fatigue machine for test server, The difference of current value under system boot and off-mode, so as to judge the state of server system to be measured be open state or Have been switched off, so as to carry out AC upper electricity and power operation to server to be measured, and delayed in the system of server to be measured During the abnormalities such as machine, blue screen, it can be determined that the information of server system to be measured, be not in the phenomenon for forcing power-off, ensure Test quality and case study are promptly and accurately.
Fig. 3 shows the structured flowchart of server fatigue test system provided by the invention, for convenience of description, in figure only Give the part related to the embodiment of the present invention.
Server fatigue test system includes:
First input current value read module 11, for controlling fatigue machine to read the input current value of server to be measured;
Start detection module 12, the input current value of the server to be measured for being read when the fatigue machine, which is less than, to be preset The second current value when, fatigue machine powers off to server to be measured, and to the service to be measured after the time threshold set Device carries out automatic upper electricity;
Loop test control module 13, in the server power up to be measured, being circulated to the server to be measured Startup and shutdown operation is performed, wherein, in the startup and shutdown of the server to be measured, when the server appearance to be measured is different During normal state, control does not perform power operation to the server to be measured.
Wherein, as shown in figure 4, above-mentioned loop test control module 13 specifically includes:
Starting module 14, after upper electricity, the server start to be measured;
First abnormality judge module 15, in start process, judging it is different whether the server to be measured occurs Normal state, wherein, the abnormality of the server to be measured includes delay machine and blue screen state;
First not power-off control module 16, for when the server to be measured is in abnormality, then controlling not to institute State server to be measured and perform power operation, the input current value of the server to be measured, which is in, is more than default first current value shape State;
Shutdown control module 17, for when the server to be measured is in non-abnormality, performing the service to be measured Shutdown script in device, the control server shutdown to be measured;
Second abnormality judge module 18, for judging whether the server to be measured exception occurs in shutdown process State;
Second not power-off control module 19, for when occurring abnormality in shutdown process, control not to be treated to described Survey server and perform power operation, the input current value of the server to be measured, which is in, is more than default first electric current state of value;
Second input current value read module 20, for when there is not abnormality in shutdown process, controlling to institute The input current value for stating server to be measured is read out;
Current value judge module 21, for judging whether input current value is less than second current value;
Power-off control module 22, for if it is determined that when input current value is less than second current value, then controlling to be measured Server powers off, and returns and perform the step of control fatigue machine reads the input current value of server to be measured.
In this embodiment, above-mentioned server fatigue test system also includes:
EOT end of test control module 23, during abnormality for being in switching on and shutting down when the server to be measured, receive and use The termination test instruction of family input, and the server shutdown to be measured is controlled, power off simultaneously;
Test environment configuration module 24, for being pre-configured with test environment, wherein, it is described tired under the test environment Labor machine connects the server to be measured and AC power supplies by power line respectively;
Current value presetting module 25, for pre-setting first current value and the second current value, wherein, treated described When survey server is in open state, the size of input current value is more than second current value, in the power-offstate, described defeated Enter current value and be less than second current value, and second current value is less than first current value.
Wherein, for example above-mentioned embodiment of the method for the function of above-mentioned modules is recorded, and will not be repeated here.
In embodiments of the present invention, fatigue machine is controlled to read the input current value of server to be measured;When fatigue machine is read The input current value of server to be measured when being less than default second current value, fatigue machine powers off to server to be measured, and Electricity on automatic is carried out to server to be measured after the time threshold set;In server power up to be measured, to server to be measured Circulation performs startup and shutdown operation, in the startup and shutdown of server to be measured, when there is abnormality in server to be measured, Control does not perform power operation to server to be measured, so as to realize the test that powers on/off to server to be measured, while in system Appearance delay the states such as machine when, be not in the phenomenon for forcing power-off, ensure the timely standard of testing fatigue quality and case study Really.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should be included in the scope of the protection.

Claims (10)

1. a kind of server method for testing fatigue, it is characterised in that methods described comprises the steps:
Fatigue machine is controlled to read the input current value of server to be measured;
When the input current value for the server to be measured that the fatigue machine is read is less than default second current value, fatigue machine pair Server to be measured is powered off, and carries out electricity on automatic to the server to be measured after the time threshold set;
In the server power up to be measured, startup and shutdown operation is performed to the server circulation to be measured, wherein, in institute In the startup and shutdown for stating server to be measured, when abnormality occurs in the server to be measured, control not to the clothes to be measured Business device performs power operation.
2. server method for testing fatigue according to claim 1, it is characterised in that the server power up to be measured In, startup and shutdown operation is performed to the server circulation to be measured, wherein, in the startup and shutdown of the server to be measured In, when abnormality occurs in the server to be measured, control does not have to the step of server execution power operation to be measured Body comprises the steps:
After upper electricity, the server start to be measured, and in start process, judge whether the server to be measured abnormal shape occurs State, wherein, the abnormality of the server to be measured includes delay machine and blue screen state;
When the server to be measured is in abnormality, then controls and power operation is not performed to the server to be measured, it is described The input current value of server to be measured, which is in, is more than default first electric current state of value;
When the server to be measured is in non-abnormality, the shutdown script in the server to be measured is performed, described in control Server shutdown to be measured;
Judge whether the server to be measured abnormality occurs in shutdown process;
When occurring abnormality in shutdown process, control does not perform power operation to the server to be measured, described to be measured The input current value of server, which is in, is more than default first electric current state of value;
When there is not abnormality in shutdown process, control and the input current value of the server to be measured be read out, And judge whether the input current value is less than second current value;
If it is determined that when the input current value is less than second current value, then controls and powered off to the server to be measured, and return The step of controlling fatigue machine to read the input current value of server to be measured described in receipt row.
3. server method for testing fatigue according to claim 2, it is characterised in that methods described also includes following steps Suddenly:
When the server to be measured is in the abnormality of switching on and shutting down, the termination test instruction of user's input is received, and is controlled The server shutdown to be measured, is powered off simultaneously.
4. server method for testing fatigue according to claim 3, it is characterised in that methods described also includes following steps Suddenly:
Test environment is pre-configured with, wherein, under the test environment, the fatigue machine connects described treat by power line respectively Survey server and AC power supplies.
5. server method for testing fatigue according to claim 4, it is characterised in that methods described also includes following steps Suddenly:
First current value and the second current value are pre-set, wherein, it is defeated when the server to be measured is in open state The size for entering current value is more than second current value, and in the power-offstate, the input current value is less than second electric current Value, and second current value is less than first current value.
6. a kind of server fatigue test system, it is characterised in that the system includes:
First input current value read module, for controlling fatigue machine to read the input current value of server to be measured;
Start detection module, the input current value of the server to be measured for being read when the fatigue machine are less than default second During current value, fatigue machine is powered off to server to be measured, and the server to be measured is carried out after the time threshold set Automatic upper electricity;
Loop test control module, in the server power up to be measured, opening the server circulation execution to be measured Machine and power-off operation, wherein, in the startup and shutdown of the server to be measured, when abnormality occurs in the server to be measured When, control does not perform power operation to the server to be measured.
7. server fatigue test system according to claim 6, it is characterised in that the loop test control module tool Body includes:
Starting module, after upper electricity, the server start to be measured;
First abnormality judge module, in start process, judging whether the server to be measured abnormality occurs, Wherein, the abnormality of the server to be measured includes delay machine and blue screen state;
First not power-off control module, for when the server to be measured is in abnormality, then controlling not to described to be measured Server performs power operation, and the input current value of the server to be measured, which is in, is more than default first electric current state of value;
Shutdown control module, for when the server to be measured is in non-abnormality, performing in the server to be measured Shut down script, the control server shutdown to be measured;
Second abnormality judge module, for judging whether the server to be measured abnormality occurs in shutdown process;
Second not power-off control module, for when occurring abnormality in shutdown process, controlling not to the service to be measured Device performs power operation, and the input current value of the server to be measured, which is in, is more than default first electric current state of value;
Second input current value read module, for when there is not abnormality in shutdown process, controlling to described to be measured The input current value of server is read out;
Current value judge module, for judging whether the input current value is less than second current value;
Power-off control module, for if it is determined that when the input current value is less than second current value, then controlling and being treated to described Server power-off is surveyed, and returns and performs the step of control fatigue machine reads the input current value of server to be measured.
8. server fatigue test system according to claim 7, it is characterised in that the system also includes:
EOT end of test control module, during abnormality for being in switching on and shutting down when the server to be measured, receive user's input Termination test instruction, and control the server to be measured shutdown, power off simultaneously.
9. server fatigue test system according to claim 8, it is characterised in that the system also includes:
Test environment configuration module, for being pre-configured with test environment, wherein, under the test environment, the fatigue machine leads to Cross power line and connect the server to be measured and AC power supplies respectively.
10. server fatigue test system according to claim 9, it is characterised in that the system also includes:
Current value presetting module, for pre-setting first current value and the second current value, wherein, in the service to be measured When device is in open state, the size of input current value is more than second current value, in the power-offstate, the input current Value is less than second current value, and second current value is less than first current value.
CN201711023430.5A 2017-10-27 2017-10-27 A kind of server method for testing fatigue and system Pending CN107729201A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711023430.5A CN107729201A (en) 2017-10-27 2017-10-27 A kind of server method for testing fatigue and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711023430.5A CN107729201A (en) 2017-10-27 2017-10-27 A kind of server method for testing fatigue and system

Publications (1)

Publication Number Publication Date
CN107729201A true CN107729201A (en) 2018-02-23

Family

ID=61203133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711023430.5A Pending CN107729201A (en) 2017-10-27 2017-10-27 A kind of server method for testing fatigue and system

Country Status (1)

Country Link
CN (1) CN107729201A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110874295A (en) * 2019-09-24 2020-03-10 福建升腾资讯有限公司 Test method and system for boot verification after abnormal shutdown

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080164883A1 (en) * 2006-12-01 2008-07-10 Hong Fu Jin Precision Industry (Shenzhen) Co., Ltd. Power cycle test method for testing an electronic equipment
CN201378313Y (en) * 2009-04-16 2010-01-06 浪潮电子信息产业股份有限公司 Device for on/off fatigue tests used for microcomputer and server
CN104317712A (en) * 2014-10-23 2015-01-28 浪潮电子信息产业股份有限公司 Linux-based storage server fatigue testing method
CN105138437A (en) * 2015-08-25 2015-12-09 浪潮电子信息产业股份有限公司 SmartRack multi-node parallel reboot testing method based on fatigue testing machine and 4U fixture
CN106326057A (en) * 2016-08-29 2017-01-11 浪潮电子信息产业股份有限公司 Test method for realizing AC reboot based on IPMI tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080164883A1 (en) * 2006-12-01 2008-07-10 Hong Fu Jin Precision Industry (Shenzhen) Co., Ltd. Power cycle test method for testing an electronic equipment
CN201378313Y (en) * 2009-04-16 2010-01-06 浪潮电子信息产业股份有限公司 Device for on/off fatigue tests used for microcomputer and server
CN104317712A (en) * 2014-10-23 2015-01-28 浪潮电子信息产业股份有限公司 Linux-based storage server fatigue testing method
CN105138437A (en) * 2015-08-25 2015-12-09 浪潮电子信息产业股份有限公司 SmartRack multi-node parallel reboot testing method based on fatigue testing machine and 4U fixture
CN106326057A (en) * 2016-08-29 2017-01-11 浪潮电子信息产业股份有限公司 Test method for realizing AC reboot based on IPMI tool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110874295A (en) * 2019-09-24 2020-03-10 福建升腾资讯有限公司 Test method and system for boot verification after abnormal shutdown
CN110874295B (en) * 2019-09-24 2022-08-19 福建升腾资讯有限公司 Test method and system for boot verification after abnormal shutdown

Similar Documents

Publication Publication Date Title
CN109995097B (en) Power-on control method, device and system, computer device and storage medium
US8996850B2 (en) Server system and auto-reset method of the same
CN102915100A (en) Information processing apparatus and method of controlling the same
CN105739668A (en) Power management method and power management system of notebook computers
CN104268045A (en) Testing method for startup and shutdown in remote control system
CN106155797A (en) Terminal unit and the changing method of performance mode thereof
US9735563B2 (en) Power distribution method, power distribution apparatus, and information handling system
CN107729201A (en) A kind of server method for testing fatigue and system
CN109856984A (en) Power consumption management method, apparatus, computer equipment and storage medium
US11831151B2 (en) Photovoltaic electric appliance system, method and device of controlling voltage protection value thereof
CN105717877A (en) Method and device for verifying operating condition of pump storage group based on sequence control process
CN110147299B (en) Method and system for detecting abnormal power failure of SSD (solid State disk) complete machine
CN114584498A (en) Method, device, equipment, system and product for testing power on and power off of gateway equipment
CN105100125A (en) Sleep control method, sleep control device and sleep control system for virtual desktop
CN105159772A (en) Control method for memory of mobile terminal and mobile terminal
CN103529824A (en) Stability test method and system
US20160004576A1 (en) Apparatus for managing application program and method therefor
CN109766227A (en) The test method of server test system and its switch
CN114184885A (en) Fault detection method, device and storage medium
CN114689959A (en) Malignant load recognition device, method, system and storage medium
CN107273239A (en) A kind of protection system of startup of server code and guard method
CN110049264B (en) Laser television power supply control system and method
CN107870777A (en) A kind of hot patch implementation method and device, terminal
CN100472443C (en) Method and system for quick start-up for computer
CN109684165A (en) The control method of mobile terminal and its current emissions, computer storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223