CN201345511Y CNU2009200837241U CN200920083724U CN201345511Y CN 201345511 Y CN201345511 Y CN 201345511Y CN U2009200837241 U CNU2009200837241 U CN U2009200837241U CN 200920083724 U CN200920083724 U CN 200920083724U CN 201345511 Y CN201345511 Y CN 201345511Y
Authority
CN
China
Prior art keywords
district
vehicle
area
appliance
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200837241U
Other languages
Chinese (zh)
Inventor
何朝阳
巨大江
李伟
胡国辉
肖江
尹莉君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XIANGYANG POWER SUPPLY Corp OF HUBEI ELECTRIC POWER CORPORATION
State Grid Corp of China SGCC
Original Assignee
HUBEI ELECTRIC POWER COMPANY XIANGFAN FANCHENG POWER SUPPLY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI ELECTRIC POWER COMPANY XIANGFAN FANCHENG POWER SUPPLY Co filed Critical HUBEI ELECTRIC POWER COMPANY XIANGFAN FANCHENG POWER SUPPLY Co
Priority to CNU2009200837241U priority Critical patent/CN201345511Y/en
Application granted granted Critical
Publication of CN201345511Y publication Critical patent/CN201345511Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A distribution network emergency repair equipment vehicle applied to distribution network emergency repair has the structure that the vehicle body is divided into an administrative area, a safety tool and appliance area, and a spare part area; the front half part of the vehicle body is the administrative area, and the left side and the right side of the rear half part of the vehicle body are the safety tools and appliance area and the spare part area; and side doors are formed on the vehicle body on the left side and the right side corresponding to the safety tools and appliance area and the spare part area. The equipment vehicle solves the problems that in the prior art, the repair time is prolonged in the power repair, and the safety tool and appliance, as well as the construction tool and appliance, are placed on the vehicle and can not be fixedly arranged, so that damage is caused in the running process of the vehicle. The equipment vehicle has perfect configuration, realizes function division and set layout, optimizes integral vehicle body structure, increases space utilization rate of restored vehicle, facilitates tool cleaning, and improves work efficiency, thereby maximally reducing loss, reducing maintenance cost, and realizing quick fault recovery.

Description

Distribution electric power first-aid equipment cart
Technical field
The utility model relates to a kind of equipment special car that is applied to electric power first-aid.
Background technology
Electric power first-aid is an important process of power supply enterprise's service power customer.For the repairing service is provided, each electric company has all disposed the electric power first-aid car.Breakdown van is generally picking-up vehicle, and driving cabin is sat the repairing personnel, places repairing apparatus, standby redundancy in the loading space, and power supply unit installs the gps satellite navigation system according to actual conditions additional to the part vehicle, but the setting of vehicle inside structure, function division all fails to consider.Because job is many, operation disperses, and equipment is numerous and diverse, and fault type is different.In maintenance work, repairing process, after recovery vehicle often occurring and going to fault or job site, the need that do not cause entirely because of outfit construction Work tool, standby redundancy come and go several times back and forth by the phenomenon of instrument or material, cause the repairing time lengthening, and electric power feeding time is delayed virtually; Managing security tools and instruments, construction Work tool are put onboard because of causing Work tool to obtain destruction virtually in the vehicle ' process by fixation on the other hand, also do not meet safety standard requirements; The damage of Work tool i.e. directly influence construction, increases cost again.Above-mentioned deficiency has directly influenced the lifting of power supply reliability index, and for guaranteeing carrying out in order of breakdown repair work, power supply department has consumed great amount of manpower and material resources, financial resources.
Summary of the invention
The purpose of this utility model is to provide a kind of multiple major function with required special equipment in the distribution electric power first-aid, and managing security tools and instruments, construction Work tool are laid rationally, can finish the distribution electric power first-aid equipment cart of distribution electric power first-aid fast and efficiently
The technical solution of the utility model is: a kind of distribution electric power first-aid equipment cart, comprise car body, compartment, it is characterized in that: be separated into Office Area, construction Work tool district, managing security tools and instruments district, standby redundancy district in the compartment: the first half in the compartment is the Office Area; Left and right sides one side of the latter half in compartment is the managing security tools and instruments district, and opposite side is the standby redundancy district; Have side door on the left and right sides car body corresponding with managing security tools and instruments district and standby redundancy district.
The utility model is compared with prior art functional to have obtained bigger raising, realization function division, fixation are put, optimize the car load end structure, in a compartment, realize the rational deployment and the subregion of various functions, instrument, improved the space availability ratio of recovery vehicle, the instrument cleaning is easier, can increase work efficiency, thereby reduce the loss, reduce maintenance cost to greatest extent, realize the quick reparation of fault.Compared with prior art, have following advantage:
The instrument completeness: the repairing Eleabir rigby can satisfy the required managing security tools and instruments of the small-sized repairing of breakdown repair more than 98%, construction Work tool, standby redundancy.
Management regulation: standard recovery vehicle equipment, realize that the subregion of repairing instrument is placed, carry out FIXED MANAGEMENT to rushing to repair indispensable Work tool, fundamental test equipment, standby redundancy.
Office hommization: realize the human oriented design of Administrative Area, make things convenient for the repairing personnel to draft work ticket, consider wireless network, office facility interface, power supply simultaneously, for network newspaper ticket, circuit platform district service data query analysis, with no paper office from now on provides condition.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing.
Fig. 1 is the utility model floor plan (overlooking).
Fig. 2 is left view of the present utility model (not comprising side door on the car body).
Fig. 3 is right view of the present utility model (not comprising side door on the car body).
Fig. 4 is rearview of the present utility model (not comprising back door on the car body).
Embodiment
Among Fig. 1,1 is car body.In the compartment 2 by install the space dividing plate additional, fixedly realization function division branch is effectively cut apart, make up to the stick measure to the inner space, is separated into Office Area 3, Work tool district 4, managing security tools and instruments district 5, standby redundancy district 6 construct.2 first half is Office Area 3 in the compartment; Left and right sides one side of the latter half in compartment 2 is managing security tools and instruments district 5, and opposite side is standby redundancy district 6; Open the sidecar door respectively on the left and right sides car body corresponding, for construction Work tool district 4, have rear door on the rear side car body at construction 4 places, Work tool district between managing security tools and instruments district 5 and the standby redundancy district 6 with managing security tools and instruments district 5 and standby redundancy district 6.Unitized in order to dispatch, the utility model has installed the gps satellite location additional, so that 95598 unified scheduling help promoting reply accident ability, improve power supply reliability.
Among Fig. 2, managing security tools and instruments district 5 total length 1700mm, two-layer about dividing, one deck is apart from ground 300mm, and two layer heights are 700mm.One deck is a drawer type, divides two-layerly, and floor height 150mm places 26 cover insulating rods; Two layers is three vertical perpendicular cabinets: the long 400mm of 1# cabinet, place six cover high-voltage earthing lines, six cover high-voltage earthing pins; The long 500mm of 2# cabinet places Third Mate's riding boogie board, four pairs of waistbands, Third Mate's lifting rope, Second Mates rope that insulate; The long 800mm of 3# cabinet divides three layers, and the first floor height 250m places four top safety caps; The second floor height 100mm places electroscope; The 3rd floor height 350mm places insulated shoes, insulating gloves.There is the office desk and chair setting Office Area 3, realize the human oriented design of Administrative Area, make things convenient for the repairing personnel to draft work ticket, consider wireless network, office facility interface, power supply simultaneously, for network newspaper ticket, circuit platform district service data query analysis, with no paper office from now on provides condition.
Among Fig. 3, standby redundancy district 6 configuration cable spare parts, device clamp, nose circuit spare part, hot line clamp, parallel groove clamp, insurance circuit spare part, hot line clamp, parallel groove clamp, insurance, air switch, fuse gold utensil, screw, connection iron, ball-eye, right angle link, illuminating lamp, drum, porcelain vase, generator etc.3 is the Office Area.
Among Fig. 4,5 is the managing security tools and instruments district, and 4 are construction Work tool district.Construction Work tool district 4 configuration phasing testers, guardrail support, screening hurdle, insulating ladder, pincerlike meter, ground connection megohmmeter, low pressure megohmmeter, single double bridge, transformation megohmmeter, electric hammer, puncher.

Claims (5)

1, a kind of distribution electric power first-aid equipment cart comprises car body, compartment, it is characterized in that: be separated into Office Area, construction Work tool district, managing security tools and instruments district, standby redundancy district in the compartment: the first half in the compartment is the Office Area; Left and right sides one side of the latter half in compartment is the managing security tools and instruments district, and opposite side is the standby redundancy district; Have side door on the left and right sides car body corresponding with managing security tools and instruments district and standby redundancy district.
2, distribution electric power first-aid equipment cart according to claim 1, it is characterized in that: there are wireless network office facility interface, power supply in described Office Area, personnel seat, work tables and chairs.
3, distribution electric power first-aid equipment cart according to claim 1 is characterized in that: described managing security tools and instruments district, divide two parts up and down, and a part is a drawer type, divides two-layerly, is used to place insulating rod; Two parts are three vertical perpendicular cabinets: a cabinet specification is provided with according to the specification size of placing high-voltage earthing line, high-voltage earthing pin; Two cabinet specifications are according to placing riding boogie board, waistband, lifting rope, the setting of insulation rope specification size; Three cabinet specifications are according to placing safety cap, electroscope, the setting of insulation articles for use specification size.
4, distribution electric power first-aid equipment cart according to claim 3, it is characterized in that: the configuration in described standby redundancy district comprises cable spare part, device clamp, nose circuit spare part, hot line clamp, parallel groove clamp, insurance circuit spare part, hot line clamp, parallel groove clamp, insurance, fuse gold utensil, screw, connection iron, ball-eye, right angle link, illuminating lamp, drum, porcelain vase, generator.
5, distribution electric power first-aid equipment cart according to claim 1 is characterized in that: the configuration in described construction Work tool district comprises phasing tester, guardrail support, hides hurdle, insulating ladder, pincerlike meter, ground connection megohmmeter, low pressure megohmmeter, single double bridge, transformation megohmmeter, electric hammer, puncher.
CNU2009200837241U 2009-02-14 2009-02-14 Distribution network emergency repair equipment vehicle Expired - Fee Related CN201345511Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200837241U CN201345511Y (en) 2009-02-14 2009-02-14 Distribution network emergency repair equipment vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200837241U CN201345511Y (en) 2009-02-14 2009-02-14 Distribution network emergency repair equipment vehicle

Publications (1)

Publication Number Publication Date
CN201345511Y true CN201345511Y (en) 2009-11-11

Family

ID=41277094

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200837241U Expired - Fee Related CN201345511Y (en) 2009-02-14 2009-02-14 Distribution network emergency repair equipment vehicle

Country Status (1)

Country Link
CN (1) CN201345511Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882763A (en) * 2010-07-01 2010-11-10 河南省电力公司新乡供电公司 Vehicle-mounted tool cabinet for power distribution rush-repair
CN102114798B (en) * 2009-12-31 2013-03-13 上海市电力公司 Vehicular intelligent safety instrument cabinet
CN107732736A (en) * 2017-11-16 2018-02-23 广东电网有限责任公司应急抢修中心 A kind of mobile platform for electric power apparatus examination
CN107891797A (en) * 2017-12-05 2018-04-10 国网江苏省电力公司南通供电公司 A kind of distribution electric power rush-repair vehicle

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102114798B (en) * 2009-12-31 2013-03-13 上海市电力公司 Vehicular intelligent safety instrument cabinet
CN101882763A (en) * 2010-07-01 2010-11-10 河南省电力公司新乡供电公司 Vehicle-mounted tool cabinet for power distribution rush-repair
CN107732736A (en) * 2017-11-16 2018-02-23 广东电网有限责任公司应急抢修中心 A kind of mobile platform for electric power apparatus examination
CN107891797A (en) * 2017-12-05 2018-04-10 国网江苏省电力公司南通供电公司 A kind of distribution electric power rush-repair vehicle

Similar Documents

Publication Publication Date Title
CN201345511Y (en) Distribution network emergency repair equipment vehicle
CN202337236U (en) Vehicle-mounted tool box for electric maintenance
CN105379052A (en) UPS systems and methods using variable configuration modules
CN103600680A (en) Alternating current withstand voltage vehicle-mounted testing platform for 750kV ultrahigh voltage equipment
CN203739728U (en) Mobile power distribution vehicle
CN201360111Y (en) Special tool cabinet for power emergency repair
CN203611844U (en) Intelligent power construction equipment vehicle
KR101358441B1 (en) System And Apparatus, and Method For measuring error point in DC current environment
CN206628745U (en) Car is pressed and protected in a kind of 10kV/40MVA
CN103579921B (en) A kind of comprehensive distribution equipment
CN103094856A (en) Overhauling and calibration console of transformer substation
CN106683527A (en) Multifunctional installation and wiring training device for electric energy meter and mutual inductor
CN203423424U (en) Locomotive low-voltage circuit pre-wiring mould plate
CN206076953U (en) Region AC220V load supplying systems are built on a kind of ship
CN204361544U (en) A kind of electric power maintenance vehicle
CN206442143U (en) The electric car electric charging station of multiloop inlet wire
CN204927819U (en) Adopt four angle scheme's 750kV HGIS arrangement structure
CN201802299U (en) Special ladder for high-tension line maintenance
CN109472382A (en) An a kind of method for optimizing scheduling protecting electric-examination and repairing
CN203260909U (en) Safe and disassemblable power distribution cabinet body
CN208239541U (en) A kind of reaying protection test frame
CN208127744U (en) A kind of electric substation automation system dynamic analog platform
CN208045949U (en) A kind of high voltage distribution installation main electrical scheme system
CN201821305U (en) Mining flame-proof low-voltage soft starter
CN206349636U (en) Power supply first cabinet of each row and data center

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XIANGYANG POWER SUPPLY COMPANY OF HUBEI ELECTRIC P

Free format text: FORMER OWNER: HUBEI ELECTRIC POWER COMPANY, XIANGFAN FANCHENG POWER SUPPLY COMPANY

Effective date: 20130206

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130206

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130206

Address after: 441002 Changhong Road, Hubei, Xiangfan, No. 15

Patentee after: Xiangyang Power Supply Corporation of Hubei Electric Power Corporation

Patentee after: State Grid Corporation of China

Address before: 441002 No. 9 Changhong Road, Hubei, Xiangfan

Patentee before: Hubei Electric Power Company, Xiangfan Fancheng Power Supply Company

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091111

Termination date: 20180214

CF01 Termination of patent right due to non-payment of annual fee