CN206076953U - Region AC220V load supplying systems are built on a kind of ship - Google Patents

Region AC220V load supplying systems are built on a kind of ship Download PDF

Info

Publication number
CN206076953U
CN206076953U CN201621084476.9U CN201621084476U CN206076953U CN 206076953 U CN206076953 U CN 206076953U CN 201621084476 U CN201621084476 U CN 201621084476U CN 206076953 U CN206076953 U CN 206076953U
Authority
CN
China
Prior art keywords
bus
ship
bar
ac220v
region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621084476.9U
Other languages
Chinese (zh)
Inventor
杨璟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SDARI PUDONG PILOT BASE
Original Assignee
SDARI PUDONG PILOT BASE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SDARI PUDONG PILOT BASE filed Critical SDARI PUDONG PILOT BASE
Priority to CN201621084476.9U priority Critical patent/CN206076953U/en
Application granted granted Critical
Publication of CN206076953U publication Critical patent/CN206076953U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

The utility model discloses region AC220V load supplying systems are built on a kind of ship, which includes:Engine control room, including the first bus-bar of voltage identical and the second bus-bar;First transformator and the second transformator, Jing switches are connected its primary side with the first bus-bar and the second bus-bar respectively;Switchboard, be arranged on ship on build region, the 3rd bus-bar is provided with switchboard, the mains side of the 3rd bus-bar is connected with the secondary side of the first transformator or the second transformator;Ship is loaded, be arranged on ship on build region, ship load is connected with the feeding switch of the 3rd bus-bar;Administration of power networks monitoring means, are arranged on switchboard, for managing and monitoring operation of power networks state in switchboard.This utility model reduces the quantity that long-distance cable lays, and reduces cost, moreover it is possible to reduce impact of the voltage drop to grid stability, improves power supply motility.

Description

Region AC220V load supplying systems are built on a kind of ship
Technical field
This utility model is related to ship power supply systems technology field, more particularly to AC220V loads in region are built on a kind of ship Electric power system.
Background technology
As shown in figure 1, the AC220V loads that region is built on general ship include normal illumination, cabin blower fan, electric heater, Local area network outlet, communication navigation set and navigation lights signal lighties etc., by existing design, the main power source of the said equipment is by cabin collection The indoor main distribution board AC220V feed panels of control are directly powered, cable from cabin lay it is supreme build region, partial cables will also prolong Extend and build at the highest driver's cabin of region.
The shortcoming of prior art:
(1) it is, less economical:Build that the number of cables that need to lay in region is more, distance from cabin is supreme, and electric pressure is AC220V, it is contemplated that problem of pressure drop partial cables specification needs increase, above-mentioned reason that cable cost will be caused to increase, while increasing Cable laying construction cost;
(2), very flexible:When cabin AC220V system goes wrong, such as cabin endogenous cause of ill humidity causes AC220V distribution System insulation is low, the failure such as main transformer failure or cabin main distribution board AC220V feed panels in cabin and need maintenance when, then On build region AC220V main power sources also while cannot use;
(3), maintenance management inconvenience:Due to above build AC220V load it is more, therefore in cabin main distribution board to each upper construction Standby or point electronic box feeding switch is more, and each equipment arrangement is unfavorable for centralized management than relatively decentralized, and main distribution board distance is above built Farther out, many inconveniences are caused when needing repairing.
Utility model content
Main purpose of the present utility model is to provide region AC220V load supplying systems are built on a kind of ship, reduces length Apart from the quantity of cable laying, cost is reduced, moreover it is possible to reduce impact of the voltage drop to grid stability, improve power supply flexible Property.
To achieve these goals, this utility model to be provided and build region AC220V load supplying systems on a kind of ship, its Including:
Engine control room, including the first bus-bar of voltage identical and the second bus-bar;
First transformator and the second transformator, its primary side difference Jing switch and first bus-bar and the second bus-bar It is connected;
Switchboard, be arranged on ship on build region, the 3rd bus-bar, the 3rd bus-bar are provided with the switchboard Mains side be connected with the secondary side of first transformator or the second transformator;
Ship is loaded, be arranged on ship on build region, the feeding switch of the ship load and the 3rd bus-bar It is connected;
Administration of power networks monitoring means, are arranged on the switchboard, for managing and monitoring electrical network fortune in the switchboard Row state.
According to a preferred embodiment of the present utility model:The engine control room is additionally provided with AC220V feed panels, described Mains side difference the 3rd transformators of Jing of AC220V feed panels and the 4th transformator and first bus-bar and the second bus-bar It is connected, the feeding switch of the AC220V feed panels is connected with AC220V electric equipments.
According to a preferred embodiment of the present utility model:The ship load is mechanical, electrical including luminaire, cabin wind is above built Heater, lan device, navigational equipment, navigational aid, radio, navigation lamp apparatus and changing of traffic lights.
According to a preferred embodiment of the present utility model:The administration of power networks monitoring means include and the 3rd bus-bar Voltmeter, ammeter, insulating monitor and the alarm buzzer being connected.
According to a preferred embodiment of the present utility model:The insulating monitor is also connected with the monitor and alarm system of shipyard Connect.
According to a preferred embodiment of the present utility model:3rd bus-bar is additionally provided with multiple backup circuit breakers.
According to a preferred embodiment of the present utility model:The voltage of the described first to the 3rd bus-bar is respectively:440V/ 380V, 440V/380V and 220V.
The beneficial effects of the utility model are:
(1), cable ordering cost is reduced.Original supreme region of building of cabin needs many long-distance cables, now the company of only needing to Two long-distance cables of the first transformator and the second transformator are connect, cable cost and cost of labor is reduced.
(2), reduce line steady-state voltage drop.Originally the supreme long-distance cable voltage for building region of cabin is AC220V, this Voltage cable in utility model is AC380V or AC440V, and line electricity problem of pressure drop is less.
(3), powering, motility is good, and the first transformator, the second transformator, the first to the 3rd bus-bar are mutually independent, mutually Do not affect.
(4), equipment centralized Control.Switchboard is arranged in builds region, loads relatively closely apart from ship, and maintenance and management are all non- Often convenient, for after, ship concentrated controling management provides fine platform.
(5), outward appearance is preferable, characteristics of compact layout.
Description of the drawings
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise for not paying creative work Under, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Fig. 1 is the frame diagram that region AC220V load supplying systems are built on the ship of prior art;
Fig. 2 is the frame diagram that region AC220V load supplying systems are built on ship of the present utility model.
Specific embodiment
Below in conjunction with the accompanying drawings preferred embodiment of the present utility model is described in detail, so that advantage of the present utility model Can be easier to be readily appreciated by one skilled in the art with feature, it is apparent clear and definite so as to make to protection domain of the present utility model Define.
Refering to region AC220V load supplying systems shown in Fig. 2, are built on ship of the present utility model, which includes:
Engine control room 1, including voltage identical the first bus-bar 11 and the second bus-bar 12;In this utility model, the The voltage of one bus-bar 11 and the second bus-bar 12 is AC440V/60HZ or AC380V/50HZ.
First transformator 2 and the second transformator 3, Jing switches 4 are confluxed its primary side with the first bus-bar 11 and second respectively Row 12 is connected;
Switchboard 5, be arranged on ship on build region 6, is provided with the 3rd bus-bar 51, the 3rd bus-bar 51 in switchboard 5 Mains side be connected with the secondary side of the first transformator 2 or the second transformator 3;In this utility model, the first transformator 2 and Two transformators 3 only have wherein 1 to be in power supply state, and one is then in resting state in addition, so as to reach guarantee circuit stability The effect of power supply.
Ship load 7, be arranged on ship on build region 6,10 phase of feeding switch of ship load 7 and the 3rd bus-bar 51 Connection;Ship load 7 in this utility model includes that building luminaire 71, cabin blower fan 72, electric heater 73, LAN sets Standby 74, navigational equipment 75, navigational aid 76, radio 77, navigation lamp apparatus 78 and changing of traffic lights 79 etc..These feedbacks Electric switch 10 is in ON position, it is ensured that the 3rd bus-bar 51 loads 7 continued powers to ship.In addition, the 3rd bus-bar 51 are additionally provided with multiple backup circuit breakers 9, and after being, the increase of equipment is ready.
Administration of power networks monitoring means 8, are arranged on switchboard 5, for managing and monitoring operation of power networks shape in switchboard 5 State.In this utility model, voltmeter 81 that administration of power networks monitoring means 8 include being connected with the 3rd bus-bar 51, ammeter 82, Insulating monitor 83 and alarm buzzer 84.Wherein, insulating monitor 83 is also connected with the monitor and alarm system of shipyard.When exhausted Edge monitor 83 detects insulation fault, and buzzer 84 sends warning, and the monitor and alarm system for being sent to shipyard by reporting to the police, with Notify stand-by vessel person as early as possible to fix a breakdown, it is ensured that electrical network continues safely to run.
In this utility model, engine control room 1 is additionally provided with AC220V feed panels 13, the mains side point of AC220V feed panels 13 Other the 3rd transformators 14 of Jing and the 4th transformator 15 are connected with the first bus-bar 11 and the second bus-bar 12, AC220V feed panels 13 feeding switch is connected with AC220V electric equipments 16.The AC220V electric equipments 16 are conventional in engine control room 1 Electric equipment, which is separate with ship load 7, is independent of each other, and makes maintenance and manages convenient.
In sum, the utility model has the advantage of:
(1), cable ordering cost is reduced.Original supreme region of building of cabin needs many long-distance cables, now the company of only needing to Two long-distance cables of the first transformator and the second transformator are connect, cable cost and cost of labor is reduced.
(2), reduce line steady-state voltage drop.Originally the supreme long-distance cable voltage for building region of cabin is AC220V, this Voltage cable in utility model is AC380V or AC440V, and line electricity problem of pressure drop is less.
(3), powering, motility is good, and the first transformator, the second transformator, the first to the 3rd bus-bar are mutually independent, mutually Do not affect.
(4), equipment centralized Control.Switchboard is arranged in builds region, loads relatively closely apart from ship, and maintenance and management are all non- Often convenient, for after, ship concentrated controling management provides fine platform.
(5), outward appearance is preferable, characteristics of compact layout.
More than, specific embodiment only of the present utility model, but protection domain of the present utility model is not limited thereto, Any change or replacement expected without creative work, should all cover within protection domain of the present utility model.Therefore, The protection domain that protection domain of the present utility model should be limited by claims is defined.

Claims (7)

1. region AC220V load supplying systems are built on a kind of ship, it is characterised in that include:
Engine control room, including the first bus-bar of voltage identical and the second bus-bar;
First transformator and the second transformator, its primary side difference Jing switch are connected with first bus-bar and the second bus-bar Connect;
Switchboard, be arranged on ship on build region, the 3rd bus-bar, the electricity of the 3rd bus-bar are provided with the switchboard Source is connected with the secondary side of first transformator or the second transformator;
Ship is loaded, be arranged on ship on build region, the ship load is connected with the feeding switch of the 3rd bus-bar Connect;
Administration of power networks monitoring means, are arranged on the switchboard, for managing and monitoring operation of power networks shape in the switchboard State.
2. region AC220V load supplying systems are built on ship as claimed in claim 1, it is characterised in that the cabin collection control Room is additionally provided with AC220V feed panels, mains side difference the 3rd transformators of Jing of the AC220V feed panels and the 4th transformator and institute State the first bus-bar and the second bus-bar is connected, the feeding switch of the AC220V feed panels is connected with AC220V electric equipments Connect.
3. region AC220V load supplying systems are built on ship as claimed in claim 2, it is characterised in that the ship load Including above building luminaire, cabin blower fan, electric heater, lan device, navigational equipment, navigational aid, radio, boat Portable lighter equipment and changing of traffic lights.
4. region AC220V load supplying systems are built on ship as claimed in claim 3, it is characterised in that the administration of power networks Monitoring means include voltmeter, ammeter, insulating monitor and the alarm buzzer being connected with the 3rd bus-bar.
5. region AC220V load supplying systems are built on ship as claimed in claim 4, it is characterised in that the insulating monitoring Instrument is also connected with the monitor and alarm system of shipyard.
6. region AC220V load supplying systems are built on the ship as described in any one of claim 1-5, it is characterised in that described 3rd bus-bar is additionally provided with multiple backup circuit breakers.
7. region AC220V load supplying systems are built on ship as claimed in claim 1, it is characterised in that described first to The voltage of three bus-bars is respectively:440V/380V, 440V/380V and 220V.
CN201621084476.9U 2016-09-27 2016-09-27 Region AC220V load supplying systems are built on a kind of ship Active CN206076953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621084476.9U CN206076953U (en) 2016-09-27 2016-09-27 Region AC220V load supplying systems are built on a kind of ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621084476.9U CN206076953U (en) 2016-09-27 2016-09-27 Region AC220V load supplying systems are built on a kind of ship

Publications (1)

Publication Number Publication Date
CN206076953U true CN206076953U (en) 2017-04-05

Family

ID=58441068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621084476.9U Active CN206076953U (en) 2016-09-27 2016-09-27 Region AC220V load supplying systems are built on a kind of ship

Country Status (1)

Country Link
CN (1) CN206076953U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108288856A (en) * 2018-03-06 2018-07-17 上海振华重工(集团)股份有限公司 Wind turbine installation vessel construction equipment power supply system
CN109347098A (en) * 2018-11-09 2019-02-15 南通中远海运川崎船舶工程有限公司 A kind of cargo hold blower classification power supply mode

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108288856A (en) * 2018-03-06 2018-07-17 上海振华重工(集团)股份有限公司 Wind turbine installation vessel construction equipment power supply system
CN108288856B (en) * 2018-03-06 2023-11-07 上海振华重工(集团)股份有限公司 Power supply system for wind power installation ship construction equipment
CN109347098A (en) * 2018-11-09 2019-02-15 南通中远海运川崎船舶工程有限公司 A kind of cargo hold blower classification power supply mode

Similar Documents

Publication Publication Date Title
US8638008B2 (en) 380 volt direct current power distribution system for information and communication technology systems and facilities
CN105205725A (en) Power distribution system and container type data center
CN103001254B (en) Alternating current-direct current hybrid micro-grid system
CN206076953U (en) Region AC220V load supplying systems are built on a kind of ship
CN104836327A (en) Machine room commercial power/UPS integrated power distribution cabinet
JP2013013174A (en) Power supply system
CN204391886U (en) The integrated power distribution cabinet of machine room civil power/UPS
CN104362733B (en) A kind of prefabricated uninterruptible power system
CN202616884U (en) Intelligent AC (alternating-current) distribution device for communication
CN105000160B (en) Power supply system for ship bow equipment
CN206195248U (en) Electrified bypass equipment who changes with equipment on pole multiloop shaft tower
CN212849578U (en) Movable high-pressure chamber
CN204871577U (en) Boats and ships bow equipment power supply system
CN210350851U (en) Medical distribution box
CN203260909U (en) Safe and disassemblable power distribution cabinet body
CN209709742U (en) Double-CT power taking and supplying device for high-voltage cable monitoring equipment
CN203326904U (en) Intelligent high-frequency switching power supply system
CN208028585U (en) Wind turbine installation vessel construction equipment power supply system
CN103872753A (en) Wiring circuit for UPS bypass standby power supply
CN217444207U (en) Ship three-phase transformer
CN206163935U (en) Shift switches station
CN203995881U (en) A kind of supply vehicle
CN212277946U (en) Intelligent adjustable low-voltage shore power system
Megdiche et al. Data Center Electrical Design
CN203691053U (en) High-risk power consumption user emergency power supply connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant