CN101882763A CN 201010214557 CN201010214557A CN101882763A CN 101882763 A CN101882763 A CN 101882763A CN 201010214557 CN201010214557 CN 201010214557 CN 201010214557 A CN201010214557 A CN 201010214557A CN 101882763 A CN101882763 A CN 101882763A
Authority
CN
China
Prior art keywords
storage cabinets
tool storage
repair
cabinet
instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010214557
Other languages
Chinese (zh)
Inventor
卢兴远
拜克明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinxiang Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Xinxiang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxiang Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Xinxiang Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN 201010214557 priority Critical patent/CN101882763A/en
Publication of CN101882763A publication Critical patent/CN101882763A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a vehicle-mounted tool cabinet for power distribution rush-repair, which comprises an instrument frame and two tool storage cabinets. The two sides of the instrument cabinet are symmetrically connected with the two tool storage cabinets in parallel, the two tool storage cabinets protrude towards the front face of the instrument cabinet, the middle part of the front face of the instrument cabinet between the two tool storage cabinets is provided with a workbench for arrangement of a notebook computer and relevant files, the lower half parts of the two tool storage cabinets are respectively provided with a plurality of grids for arrangement of small items, and the upper half parts of the two tool storage cabinets are respectively provided with at least two layers of rows of insulating rod accommodating grooves. The invention provides a rush-repair device for the power supply system, which has the advantages of compact structure, neat layout and convenient use, and can effectively improve the rush-repair speed and the working efficiency.

Description

A kind of vehicle-mounted tool cabinet for power distribution rush-repair
Technical field:
The present invention is exclusively used in installation, maintenance, repairs or dismantle the method or the equipment of cable, is that multiple functional vehicle-mounted tool cabinet for power distribution rush-repair is set in the trunk of power distribution rush-repair vehicle specifically.
Background technology:
Existing power distribution rush-repair vehicle picking-up vehicle trunk, place instrument and meter that some emergency first-aid repairs use and some insulating bars, insulating gloves, earth connection, high voltage testing pen etc. within it, because the tool cabinet for power distribution rush-repair that this picking-up vehicle trunk is not a kind of special setting, in the use, each is rushed to repair apparatus and places disorderly, use inconvenience, influence carrying out in order of power distribution rush-repair time and repairing work.
Summary of the invention:
The purpose of this invention is to provide a kind of rationally distributedly, each utensil is placed in order, and helps the vehicle-mounted tool cabinet for power distribution rush-repair that power supply distribution maintenance and repairing work are carried out in order.Task of the present invention is finished as follows, it includes an instrument and meter frame and two tool storage cabinets, it is characterized in that: connecting two Tool Cabinet storing compartments in the positive outstanding symmetrical parallel of two side direction of instrument and meter cabinet, instrument and meter cabinet forward, central part between two tool storage cabinets is equipped with the workbench that can place notebook computer and interrelated data, Lower Half at two tool storage cabinets is provided with a plurality of small appliance lattice respectively, is provided with two-layer at least many row's insulating bar standing grooves respectively at the first half of two tool storage cabinets.The present invention can effectively improve repairing speed and operating efficiency for electric power system provides a kind of compact conformation, layout rush repair equipment neat, easy to use.
Description of drawings:
Accompanying drawing is a structural representation of the present invention.
Embodiment:
The present invention is the combination improvement to existing instrument and meter cabinet 1 and tool storage cabinet 3, as shown in drawings, connecting two tool storage cabinets in the positive outstanding symmetrical parallel of two side direction of an instrument and meter cabinet, instrument and meter cabinet forward, central part between two tool storage cabinets is equipped with the workbench 5 that can place notebook computer and interrelated data, Lower Half at two tool storage cabinets is provided with a plurality of small appliance lattice 4 respectively, can conveniently deposit insulating gloves, earth connection, high voltage testing pens etc. are provided with two-layer two row's insulating bar standing grooves 2 respectively at the first half of two tool storage cabinets.During use the present invention is placed on the power distribution rush-repair car, put and rush to repair instrument and instrument and used utensil thereof, can rush to repair fast, the present invention helps improving repairing speed for electric power system provides a kind of compact conformation, put rush repair equipment neat, easy to use.

Claims (1)

1. vehicle-mounted tool cabinet for power distribution rush-repair, it includes an instrument and meter frame and two tool storage cabinets, it is characterized in that: connecting two Tool Cabinet storing compartments in the positive outstanding symmetrical parallel of two side direction of instrument and meter cabinet, instrument and meter cabinet forward, central part between two tool storage cabinets is equipped with the workbench that can place notebook computer and interrelated data, Lower Half at two tool storage cabinets is provided with a plurality of small appliance lattice respectively, is provided with two-layer at least many row's insulating bar standing grooves respectively at the first half of two tool storage cabinets.
CN 201010214557 2010-07-01 2010-07-01 Vehicle-mounted tool cabinet for power distribution rush-repair Pending CN101882763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010214557 CN101882763A (en) 2010-07-01 2010-07-01 Vehicle-mounted tool cabinet for power distribution rush-repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010214557 CN101882763A (en) 2010-07-01 2010-07-01 Vehicle-mounted tool cabinet for power distribution rush-repair

Publications (1)

Publication Number Publication Date
CN101882763A true CN101882763A (en) 2010-11-10

Family

ID=43054696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010214557 Pending CN101882763A (en) 2010-07-01 2010-07-01 Vehicle-mounted tool cabinet for power distribution rush-repair

Country Status (1)

Country Link
CN (1) CN101882763A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104044498A (en) * 2014-06-18 2014-09-17 国网四川省电力公司成都市新都供电分公司 Distribution network recovery vehicle
CN105203140A (en) * 2015-09-19 2015-12-30 重庆泽青巨科技发展有限公司 Instrument cabinet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1024763A (en) * 1996-07-11 1998-01-27 Kyushu Matsushita Technical Service Kk Fixing method for on-vehicle object
CN201170999Y (en) * 2007-09-21 2008-12-24 甘肃省电力公司兰州供电公司 On-site maintenance apparatus for electric power SF6 switch
CN201345511Y (en) * 2009-02-14 2009-11-11 湖北省电力公司襄樊樊城供电公司 Distribution network emergency repair equipment vehicle
CN201742020U (en) * 2010-07-01 2011-02-09 河南省电力公司新乡供电公司 Vehicle-mounted distribution first-aid repair tool cabinet

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1024763A (en) * 1996-07-11 1998-01-27 Kyushu Matsushita Technical Service Kk Fixing method for on-vehicle object
CN201170999Y (en) * 2007-09-21 2008-12-24 甘肃省电力公司兰州供电公司 On-site maintenance apparatus for electric power SF6 switch
CN201345511Y (en) * 2009-02-14 2009-11-11 湖北省电力公司襄樊樊城供电公司 Distribution network emergency repair equipment vehicle
CN201742020U (en) * 2010-07-01 2011-02-09 河南省电力公司新乡供电公司 Vehicle-mounted distribution first-aid repair tool cabinet

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104044498A (en) * 2014-06-18 2014-09-17 国网四川省电力公司成都市新都供电分公司 Distribution network recovery vehicle
CN104044498B (en) * 2014-06-18 2016-02-10 国网四川省电力公司成都市新都供电分公司 A kind of distribution breakdown van
CN105203140A (en) * 2015-09-19 2015-12-30 重庆泽青巨科技发展有限公司 Instrument cabinet

Similar Documents

Publication Publication Date Title
CN201742020U (en) Vehicle-mounted distribution first-aid repair tool cabinet
CN101882763A (en) Vehicle-mounted tool cabinet for power distribution rush-repair
CN203781157U (en) Turnover box grabbing manipulator
CN206780372U (en) Livewire work tool rack in three-dimensional bucket
CN103094856A (en) Overhauling and calibration console of transformer substation
CN203485164U (en) Tool holder for electric power maintenance
CN202618903U (en) Instrument and tool cabinet
CN203805926U (en) Safety appliance arrangement vehicle
CN204573338U (en) A kind of tubing fixing device
CN202887870U (en) Busbar manufacturing combined tool
CN203937556U (en) Electric power rush-repair vehicle
CN203622405U (en) Multifunctional movable garage
CN204087192U (en) Portable field maintenance support equipment
CN201566547U (en) Network distributing failure emergency repair vehicle
CN202952873U (en) Mobile safe tool and instrument storehouse
CN106142032B (en) Quick disassembling tool cabinet
CN205085955U (en) Anticorrosive pipe production line machine maintenance instrument case
CN204506464U (en) A kind of lithium battery box locking, stripping assembly
CN207625205U (en) Look into power stealing specific purpose tool
CN103198741A (en) Small corner electric pole analog device used for live-working practical training
CN215989969U (en) Drawer cabinet testing trolley
CN204088831U (en) A kind of connection busbar of variable-angle
CN202997374U (en) Substation maintenance calibration stand
CN104161642A (en) Medical trolley
CN203838243U (en) Train-mounted electric energy monitoring system with multiple redundant circuits

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20101110