The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer,, the utility model is further elaborated below in conjunction with drawings and Examples.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
The utility model embodiment is by the trip information of each system of pick-up transducers, by intelligent controller the user is carried out the dynamic analysis prediction with cold demand, and predict the outcome, equipment operational factor etc. utilized intelligence database analysis, propose to optimize operating scheme and also carry out the control system equipment control module.
See also Fig. 1, the central air-conditioning intelligent optimization control device that the utility model embodiment provides comprises sensor, intelligent controller and system equipment control module.
Wherein, described system equipment control module comprises: cooling water pump switch board, chilled water pump switch board and cooling tower switch board.
Described sensor obtains the trip information of each system, and sensor is mainly gathered outdoor environment humiture, indoor temperature and humidity, chilled-water flow, freezingly advanced return water temperature, return water temperature, least favorable terminal temperature difference cold water pressure reduction, freezing host setting leaving water temperature etc. are advanced in cooling.
Described sensor is connected with described intelligent controller by communication interface, after obtaining above data, is transferred to intelligent controller through communication interface.Wherein, each sensor acquisition parameter information is aggregated into its inner data module, and the latter gets in touch by communication interface and intelligent controller.
The trip information that described intelligent controller obtains according to described sensor carries out the dynamic load analyses and prediction to the user with cold demand.
Preferably, multiple parameter and service data that described intelligent controller obtains according to described sensor, when the user is carried out the dynamic analysis prediction with cold demand, use following formula:
Q(t)=cpGtΔTt
Q(t+dt)=Q(t)+[Q(t)-Q(t-dt)],
Wherein, Q (t) is a t air conditioner load constantly;
Cp is the water specific heat at constant pressure;
Gt is a t chilled-water flow constantly;
Δ Tt is the t freezing water temperature difference of sending back to constantly;
The load prediction value is: Q (t+dt)=Q (t)+[Q (t)-Q (t-dt)]
In the formula: Q (t+dt)---next sense cycle air conditioner load predicted value
Q (t-dt)---last sense cycle actual measurement air conditioner load value.
After obtaining the load prediction value, described intelligent controller is controlled the operation of corresponding cooling water pump switch board, chilled water pump switch board and cooling tower switch board according to the load prediction results that draws.
In specific implementation process, can operating scheme be proposed according to intelligence database and the load prediction that obtains value, each component devices of system is implemented control, effect comprises following three aspects:
1, team control: according to the user's who analyzes demand, optimum organization start and stop operational outfit makes it in efficient district's work, brings into play each equipment potential to greatest extent, and system effectiveness is the highest:
Central air-conditioning generally is made up of many handpiece Water Chilling Units and supporting water pump and cooling tower, and air conditioner load is changing at any time, handpiece Water Chilling Units cooling amount is also adjusted thereupon, because every unit performance indications under each load condition have very big-difference, promptly along with the variation of loading, the pairing efficient of unit is different, and every unit all has fixing efficient district.In running, adjust cold source equipment all the time in its efficient district work by the optimum organization arrangement, just can reduce the cooling energy consumption significantly.
The utility model embodiment can be according to the air conditioner load value of prediction, and the configuration unit is in the operation of efficient district, and the unit's of making cooling energy consumption minimum has been optimized the use of the energy greatly.
2, optimize host configuration: according to the customer charge demand and the environmental analysis that draw, control handpiece Water Chilling Units leaving water temperature and cold in-water temperature guarantee main frame under the prerequisite that meets the demands, efficient operation:
The standard service condition of central air-conditioning handpiece Water Chilling Units is 7 ℃/12 ℃ of cold water temperatures, 30 ℃/35 ℃ of cooling water temperatures, this group parameter can satisfy all kinds of demands of air-conditioning system, but, central air-conditioning load change at random amplitude is bigger, if according to fixing operational factor cooling, will cause the phenomenon that wastes energy, calculate and site-test analysis according to theory, the handpiece Water Chilling Units leaving water temperature is whenever heightened 1 ℃, its cooling energy consumption can reduce about 3%, because the unit leaving water temperature is by the decision of air-conditioning latent heat load, and latent heat load mainly is to be caused by indoor occupant and new wind, for the bigger commercial building of flow of personnel, meeting room, user's latent heat load random fluctuations such as stadiums are very big, therefore to make operation adjustment in good time, whole air-conditioning system energy consumption level is greatly improved.The utility model embodiment can contrast according to detecting data and intelligence database according to aforementioned load prediction, provides prioritization scheme, dynamically adjusts the handpiece Water Chilling Units leaving water temperature, has saved energy consumption.
And 1 ℃ of the every reduction of handpiece Water Chilling Units coolant water temperature equally also can reduce by 3% left and right sides energy consumption, and coolant water temperature is relevant with the cooling tower operation with environment wet-bulb temperature.The utility model embodiment can adjust cooling blower rotating speed or increase and decrease cooling tower operation quantity according to the load value that calculates in good time, makes the main frame efficient operation.
3, equipment coordination operation: according to the maximum principle of comprehensive COP, control chilled water pump, cooling water pump, blower fan of cooling tower running frequency make system energy consumption minimum:
Central air-conditioning cooling, chilled water pump, blower fan of cooling tower variable-frequency control technique are according to advancing the backwater temperature difference differential pressure, proportion of utilization integral differential (Proportion Integral Derivative, PID) or proportional integral (Proportion Integral,) the PI method implements variable frequency regulating speed control to equipment, to reach the variable air rate variable water volume purpose that cuts down the consumption of energy, this technology is widely used in the reducing energy consumption engineering, and obtains effect preferably.But a deficiency of this technology is only to consider to regulate and control single devices, and central air-conditioning is a complication system, and the individual equipment energy-saving effect is not necessarily best to system, also negative benefit can occur under certain situation.As in the variable water volume adjustment process, water pump is regulated can be energy-conservation, and host manager opinion and actual measurement prove that all energy consumption increases to some extent, therefore how will see the entire system effect.The comprehensive COP notion of the utility model embodiment drawing-in system is defined as:
Comprehensively
In the formula: Q----air-conditioning cooling amount
N
j------main frame power consumption
N
l------cooling water pump power consumption
N
d------chilled water pump power consumption
N
t------cooling tower power consumption
See also Fig. 2 according to comprehensive COP variation of actual measurement and equipment power consumption:
Wherein, the crosspoint of main frame energy consumption and pump energy consumption is the extreme point of comprehensive COP, its system synthesis benefit maximum.The utility model intelligent data library storage mass data can find this extreme point in conjunction with on-the-spot detection, reaches optimal result.
See also Fig. 3, this figure is the course of work of the central air-conditioning intelligent optimization control device that provides of the utility model.
In step 01, obtain the trip information of each system.
In step 02,, the user is carried out the dynamic load analyses and prediction with cold demand according to multiple parameter and the service data that described sensor obtains;
According to multiple parameter and the service data that described sensor obtains, when the user is carried out the dynamic analysis prediction with cold demand, use following formula:
Q(t)=cpGtΔTt
Q(t+dt)=Q(t)+[Q(t)-Q(t-dt)],
Wherein, Q (t) is a t air conditioner load constantly;
Cp is the water specific heat at constant pressure;
Gt is a t chilled-water flow constantly;
Δ Tt is the t freezing water temperature difference of sending back to constantly;
The load prediction value is: Q (t+dt)=Q (t)+[Q (t)-Q (t-dt)]
In the formula: Q (t+dt)---next sense cycle air conditioner load predicted value
Q (t-dt)---last sense cycle actual measurement air conditioner load value.
In step 03, according to the current running status of judgement system that predicts the outcome.When positive trend appears in described load, carry out step 04; When described load occurs bearing trend, carry out step 05; When described load is constant, carry out step 06;
Step 04, prompting control centre increases unit;
Step 05, prompting control centre reduces unit
Step 06, it is constant that prompting control centre keeps unit.
The utility model embodiment is by the trip information of each system of pick-up transducers, by intelligent controller the user is carried out the dynamic analysis prediction with cold demand, and predict the outcome, equipment operational factor etc. utilized intelligence database analysis, propose to optimize operating scheme and carry out the control system equipment control module, make the central air-conditioning energy potentiality obtain maximum performance, obtain maximum economic benefit.
The above only is preferred embodiment of the present utility model; not in order to restriction the utility model; all any modifications of within spirit of the present utility model and principle, being done, be equal to and replace and improvement etc., all should be included within the protection domain of the present utility model.