CN109028446A - A kind of refrigerating plant room control method based on equipment overall performance model - Google Patents

A kind of refrigerating plant room control method based on equipment overall performance model Download PDF

Info

Publication number
CN109028446A
CN109028446A CN201810731097.1A CN201810731097A CN109028446A CN 109028446 A CN109028446 A CN 109028446A CN 201810731097 A CN201810731097 A CN 201810731097A CN 109028446 A CN109028446 A CN 109028446A
Authority
CN
China
Prior art keywords
overall performance
refrigerating plant
performance model
cold water
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810731097.1A
Other languages
Chinese (zh)
Inventor
陈文震
单奇峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Liweineng Energy Conservation And Environmental Protection Technology Co Ltd
Original Assignee
Shanghai Liweineng Energy Conservation And Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Liweineng Energy Conservation And Environmental Protection Technology Co Ltd filed Critical Shanghai Liweineng Energy Conservation And Environmental Protection Technology Co Ltd
Priority to CN201810731097.1A priority Critical patent/CN109028446A/en
Publication of CN109028446A publication Critical patent/CN109028446A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention is based on the refrigerating plant room control methods of equipment overall performance model.It is abstracted and is summarized by the overall performance data to cold water main unit, water pump and cooling tower in refrigerating plant room, establish overall performance model.The overall performance model of calibration is generated by the device data of field real-time acquisition again.Control system is according to the sensing data of refrigerating plant room, and using equipment overall performance model, traversal calculates each possible opening of device quantity and combinations of states, searches out optimal opening of device number of units and combinations of states.Open signal is transported to corresponding equipment by control system, realizes the control for opening number of devices to cold water computer room, solves the disadvantage that existing refrigerating plant room control technology can not be controlled according to equipment overall performance.The present embodiment method is realized under any operating condition, refrigerating plant room operates in the state of minimum power consumption always by using refrigerating plant room overall performance model.

Description

A kind of refrigerating plant room control method based on equipment overall performance model
Technical field
The present invention relates to a kind of refrigerating plant room control methods based on equipment overall performance model.
Background technique
The refrigeration that refrigerating plant room is widely used in the fields such as civil buildings, business premises, factory, data center, hospital is empty In adjusting system.Data show, air-conditioning system accounts for 50% or more of building total power consumption in civil building, and wherein refrigeration machine Electricity consumed by room accounts for 70% or more of air-conditioning refrigeration system power consumption.The energy-efficient operation of refrigerating plant room is building and work The energy-efficient important content of industry.General cold water computer room is made of equipment such as more cold water main units, water pump and cooling columns, and increasingly More equipment uses converter technique.Control system in existing refrigerating plant room is mainly calculated each equipment using independent control Method is controlled, and according to the preset parameter of declared working condition, determines the quantity and state of running equipment.Only it is directed to entire refrigeration machine The all devices in room establish overall performance model, can realize the optimization of refrigerating plant room overall performance.
Application number: 201310246889.7 invention is related to a kind of refrigerator room energy-saving control system, including requirement forecasting System, intelligent optimization system and programmable controller, the demand forecast system is to field controller from refrigerator room equipment institute The data such as temperature, humidity, pressure, the flow of acquisition are analyzed, and are predicted load, are estimated parameter;The intelligence Can optimization system end load and outdoor environment situation are analyzed, to water cooler, chilled water pump, cooling water pump performance with Operating parameter is fitted function, matches cooling tower operational mode, obtains PRELIMINARY RESULTS with mathematical model, to PRELIMINARY RESULTS into Row intelligent optimization operation obtain refrigerator room optimized operation as a result, and it is optional output to programmable controller.PLC technology The frequency of each equipment runs each equipment under lowest energy consumption in device control refrigerator room, reaches energy-efficient purpose.
(1) application number 301310246889.7 calculates the efficiency best effort shape of cold water computer room by load forecasting method State, and the deviation of load prediction and real-time load can mislead the calculating to cold water computer room best efficiency point.
(2) application number 301310246889.7 does not illustrate that the function between device performance parameters and cold water energy consumption of machine room closes System.Meanwhile when carrying out Function Fitting, only considered water cooler and water pump, there is no by the performance parameter of cooling tower into Line function fitting.Its intellectualized algorithm mentioned and mathematical model are also only a concept, without any formula and explanation.
(3) application number 301310246889.7 mentions its programmable controller and seeks each equipment in lowest energy consumption state Operation, to realize the best energy consumption of entire cold water computer room.And in fact, being not institute when the energy consumption of entire computer room is minimum There is equipment all to work in lowest energy consumption point.Such as the energy consumption of cooling tower is when reducing, the cold in-water temperature of water cooler can on It rises, so that will lead to the energy consumption of water cooler can rise.
Summary of the invention
It is an object of the invention to overcome the above deficiencies in the existing technologies, and provide a kind of based on equipment full working scope The refrigerating plant room control method of performance model.
Technical solution used by the present invention solves the above problems is:
A kind of refrigerating plant room control method based on equipment overall performance model, by cold water master in refrigerating plant room The overall performance data of machine, water pump and cooling tower are abstracted and are summarized, and overall performance model is established;Pass through scene again The device data acquired in real time generates the overall performance model of calibration;Control system according to the sensing data of refrigerating plant room, Using the overall performance model of calibration, traversal calculates each possible opening of device quantity and combinations of states, searches out most Excellent opening of device number of units and state;Open signal is transported to corresponding equipment by control system, is realized and is opened to cold water computer room The control of number of devices and state.
Above-mentioned refrigerating plant room control method specifically comprises the following steps:
(1) by collecting the overall performance parameter in cold water main unit, water pump and the report of cooling tower type selecting, cooling water is established Performance model between inlet and outlet temperature, cooling water flow, chilled water inlet and outlet temperature, main unit load and output power, passes through Performance model simulates the performance under the various operating conditions of cold water main unit, obtains preconfigured overall performance pattern die;
(2) actual operating data that cold water main unit, water pump and cooling tower are collected by the I/O equipment of refrigerating plant room, to pre- The overall performance model first configured is modified, and obtains the overall performance model of calibration;
(3) according to refrigerating plant room refrigerating capacity and outdoor wet-bulb temperature, use the overall performance model of calibration, calculate Power consumed by the cold water main unit, water pump and cooling tower of different number is opened, show that the smallest correspondence of power needed for totality is set Standby quantity and state, i.e. optimized operation logic;
(4) according to optimized operation logic, control instruction is sent to relevant device.
The lectotype selection report or overall performance parameter provided first according to device manufacturer, to the total energy consumption of cold water computer room It is carried out curve fitting using binary polynomial equation, the pattern function on its basis is obtained by taking binary cubic equation as an example are as follows:
Pc=(aLc3+bLc2+cLc+d)x(eTc3+fTc2+gTc+h)
Wherein:
Pc: the power consumed required for cold water computer room;
Lc: the refrigerating capacity of cold water computer room;
Tc: the cooling water temperature of cold water computer room;
A, b, c, d, e, f, g, h: constant, numerical values recited can be that positive number is also negative, be provided according to equipment manufacturer Energy consumption parameter in type selecting report under different operating conditions determines.
Performance degradation due to being installed by field device, after long-play etc. influences, equipment actual motion energy consumption meeting There are certain deviations between the energy consumption data that producer provides.
The present invention can be according to the physical device operation data read from computer room group control system, using machine learning algorithm to power Constant a, b, c, d, e, f, g, h are modified in pattern function described in benefit 3.
Compared with prior art, the present invention having the following advantages that and effect: what this method was provided according to equipment manufacturer first Type selecting report or full working scope energy consumption data, initial full working scope energy consumption model is established to each equipment of refrigerating plant room.Pass through system The actual operation parameters of cold room control system (BAS) are modified initial full working scope energy consumption model, the modified process It is continual in real time;This method is in each calculating cycle, and using revised full working scope energy consumption model, traversal calculates each The combination of kind opening of device number of units and state, obtains the smallest equipment of energy consumption and combinations of states.Refrigeration machine is sent by the instruction Room control system.
Detailed description of the invention
Fig. 1 is the schematic diagram of refrigerating plant room control method of the embodiment of the present invention.
The step of Fig. 2 is refrigerating plant room control method of the embodiment of the present invention demonstrates block diagram.
Fig. 3 is the theory structure schematic diagram of air conditioner refrigerating room system of the embodiment of the present invention.
Fig. 4 is the structural block diagram of air conditioner refrigerating room system of the embodiment of the present invention.
Fig. 5 is schematic diagram of the embodiment of the present invention to its performance model fitted of centrifugal chiller room.
Fig. 6 is the schematic diagram of the performance model of calibration of the embodiment of the present invention.
Fig. 7 is refrigerating capacity of the embodiment of the present invention, coefficient of energy dissipation and the corresponding curve diagram for opening number of devices.
Specific embodiment
With reference to the accompanying drawing and by embodiment, the present invention is described in further detail, and following embodiment is to this The explanation of invention, and the invention is not limited to following embodiments.
Referring to Fig. 1 and Fig. 2, refrigerating plant room control method of the present embodiment based on equipment overall performance model, including such as Lower step:
(1) by overall performance parameter in the type selecting report of cold water main unit, cooling water inlet and outlet temperature, cooling water are established Overall performance model between flow, chilled water inlet and outlet temperature, workload and output power, passage capacity model, mould The performance under cold water main unit, water pump and the various operating conditions of cooling tower is drawn up, preconfigured performance model mould is obtained, to centrifugal cold The overall performance model that water dispenser room fits is as shown in Figure 5:
(2) by the actual operating data of the I/O equipment collecting device of refrigerating plant room, to preconfigured performance model into Row amendment, obtains the overall performance model of calibration, as shown in Figure 6;
(3) according to the refrigerating capacity of refrigerating plant room and outdoor wet-bulb temperature, using the overall performance model of calibration, calculating is opened Power consumed by the cold water main unit, water pump and cooling tower of different number is opened, obtains the smallest corresponding equipment of power needed for totality Quantity and state, i.e. optimized operation logic.As shown in fig. 7, abscissa is refrigerating capacity, ordinate is coefficient of energy dissipation, different curves Represent different unlatching number of devices.;
(4) according to optimized operation logic, control instruction is sent to relevant device.
Lectotype selection report or overall performance parameter are provided according to device manufacturer first, the total energy consumption of cold water computer room is adopted It is carried out curve fitting with binary polynomial equation, the pattern function on its basis is obtained by taking binary cubic equation as an example are as follows:
Pc=(aLc3+bLc2+cLc+d)x(eTc3+fTc2+gTc+h)
Wherein:
Pc: the power consumed required for cold water computer room;
Lc: the refrigerating capacity of cold water computer room;
Tc: the cooling water temperature of cold water computer room;
A, b, c, d, e, f, g, h: constant, numerical values recited can be that positive number is also negative, be provided according to equipment manufacturer Energy consumption parameter in type selecting report under different operating conditions determines.
Performance degradation due to being installed by field device, after long-play etc. influences, equipment actual motion energy consumption meeting There are certain deviations between the energy consumption data that producer provides.
This method can be according to the physical device operation data read from computer room group control system, using machine learning algorithm to power Constant a, b, c, d, e, f, g, h are modified in pattern function described in benefit 3.
The present embodiment is taken out by the overall performance data to cold water main unit, water pump and cooling tower in refrigerating plant room As and summarize, establish overall performance model.Again by the device data of field real-time acquisition, the overall performance of calibration is generated Model.Control system is according to the sensing data of refrigerating plant room, and using the equipment overall performance model of calibration, traversal calculates every A kind of possible opening of device quantity and combinations of states, search out optimal opening of device number of units and state.Control system will be opened It opens signal and is transported to corresponding equipment, realize the control for opening number of devices and state to cold water computer room, solve existing refrigeration The shortcomings that computer room control technology can not be controlled according to equipment overall performance.The present embodiment method is by using refrigerating plant room Overall performance model calculates, and realizes under any operating condition, refrigerating plant room operates in the state of minimum power consumption always.
Based on above-mentioned refrigerating plant room control method, the present embodiment also provides a kind of air conditioner refrigerating room system, referring to fig. 4, Air conditioner refrigerating room system includes refrigerating plant room control system (BAS), cloud computing server, wisdom controller, cold water main unit, water Pump and cooling tower, the cloud computing server are connected to wisdom controller, cold water main unit, water pump and cooling tower.Wisdom control Device processed is connected to refrigerating plant room control system (BAS), cold water main unit, water pump and cooling tower.Refrigerating plant room control system (BAS) It is connected to cold water main unit, water pump and cooling tower.Wisdom controller is connected to refrigerating plant room control based on open communications protocol System (BAS), refrigerating plant room control system (BAS) are connected to cold water main unit, water pump and cooling based on open communications protocol Tower.Shown wisdom controller includes MCU processor, Internet of Things communication module, machine learning processor, communication module and data Memory, MCU processor are connected to Internet of Things communication module, machine learning processor, communication module and data storage, object Combined network communication module is connected to refrigerating plant room control system (BAS), cold water main unit, water pump and cooling tower, and communication module connects It is connected to cloud computing server.
Working method such as Fig. 3, the air conditioner refrigerating computer room intelligence control system based on cloud computing is as follows:
(1) wisdom controller passes through open communications protocol reading BAS or equipment operating data;
(2) wisdom controller transmits data to Cloud Server by internet;
(3) Cloud Server calculates equipment optimized operation logic by algorithm;
(4) wisdom controller is sent by optimized operation logic;
(5) wisdom controller transmits data to BAS or equipment by open communications protocol.
The wisdom controller of air conditioner refrigerating computer room intelligence control system based on cloud computing passes through open communications protocol and system The control system (BAS) or device controller in cold room carry out data communication, send cloud clothes by network for the data of acquisition Business device after Cloud Server handles data, sends control instruction to wisdom controller, then by wisdom controller and passes through opening The operating status of communications protocol control equipment.The control system of existing refrigerating plant room mainly guarantees equipment operational safety, realizes The remote on-off of calculator room equipment.The present invention is based on the air conditioner refrigerating computer room intelligence control systems of cloud computing, can optimize former control The control strategy of system processed realizes the raising of refrigerating plant room efficiency by the adjustment to equipment operating parameter.
Above content is only illustrations made for the present invention described in this specification.Technology belonging to the present invention The technical staff in field, can make various modifications or additions to the described embodiments or by a similar method Substitution, content without departing from description of the invention or beyond the scope defined by this claim should belong to this The protection scope of invention.

Claims (4)

1. a kind of refrigerating plant room control method based on equipment overall performance model, it is characterised in that: by refrigerating plant room The overall performance data of middle cold water main unit, water pump and cooling tower are abstracted and are summarized, and overall performance model is established;Again The overall performance model of calibration is generated by the device data of field real-time acquisition;Control system is according to the induction of refrigerating plant room Device data, using the equipment performance model, traversal calculates each possible opening of device quantity and combinations of states, searches out most Excellent cold water computer room operation logic;Control system is transported to corresponding equipment according to this optimal logic, by open signal, control The intelligent management to cold water computer room is realized in the operation of cold water computer room.
2. the refrigerating plant room control method according to claim 1 based on equipment overall performance model, it is characterised in that: Specifically comprise the following steps:
(1) pass through cold water main unit, the overall performance parameter in water pump and the report of cooling tower type selecting establishes cooling water disengaging water temperature Overall performance model between degree, cooling water flow, chilled water inlet and outlet temperature, workload and output power, passability Energy model, simulates cold water main unit, the performance under water pump and the various operating conditions of cooling tower obtains preconfigured overall performance mould Type;
(2) cold water main unit is collected by the I/O equipment of refrigerating plant room, the actual operating data of water pump and cooling tower, to matching in advance The overall performance model set is modified, and obtains the overall performance model of calibration;
(3) it according to the refrigerating capacity of refrigerating plant room and outdoor wet-bulb temperature, is calculated and is opened not using the overall performance model of calibration Power consumed by cold water main unit, water pump and cooling tower with quantity obtains the overall consumption the smallest corresponding number of devices of power And state, i.e. optimized operation logic.
(4) according to optimized operation logic, control instruction is sent to relevant device.
3. the refrigerating plant room control method according to claim 1 based on equipment overall performance model, it is characterised in that: The report of equipment full working scope type selecting or performance parameter provided first according to device manufacturer, uses binary to the total energy consumption of cold water computer room Polynomial equation carries out curve fitting, and the pattern function on its basis is obtained by taking binary cubic equation as an example are as follows:
Pc=(aLc3+bLc2+cLc+d)x(eTc3+fTc2+gTc+h)
Wherein:
Pc: the power consumed required for cold water computer room
Lc: the refrigerating capacity of cold water computer room
Tc: the cooling water temperature of cold water computer room
A, b, c, d, e, f, g, h: constant, numerical values recited can be that positive number is also negative, the type selecting provided according to equipment manufacturer Energy consumption parameter in report under different operating conditions determines.
4. the refrigerating plant room control method according to claim 3 based on equipment overall performance model, it is characterised in that: According to the physical device operation data read from computer room group control system, using machine learning algorithm to model letter described in right 3 Constant a in number, b, c, d, e, f, g, h are modified.
CN201810731097.1A 2018-07-05 2018-07-05 A kind of refrigerating plant room control method based on equipment overall performance model Pending CN109028446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810731097.1A CN109028446A (en) 2018-07-05 2018-07-05 A kind of refrigerating plant room control method based on equipment overall performance model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810731097.1A CN109028446A (en) 2018-07-05 2018-07-05 A kind of refrigerating plant room control method based on equipment overall performance model

Publications (1)

Publication Number Publication Date
CN109028446A true CN109028446A (en) 2018-12-18

Family

ID=64640457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810731097.1A Pending CN109028446A (en) 2018-07-05 2018-07-05 A kind of refrigerating plant room control method based on equipment overall performance model

Country Status (1)

Country Link
CN (1) CN109028446A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110392515A (en) * 2019-07-23 2019-10-29 上海朗绿建筑科技股份有限公司 A kind of Cooling and Heat Source equipment room energy-conserving control method and system based on historical data
CN110737252A (en) * 2019-09-27 2020-01-31 南京大学 Intelligent chemical system based on equipment selection
CN110781540A (en) * 2019-09-30 2020-02-11 同济大学建筑设计研究院(集团)有限公司 Design scheme analysis method and device, storage medium and computer equipment
CN111076354A (en) * 2019-12-31 2020-04-28 珠海格力电器股份有限公司 Equipment model selection method and system of central air conditioner
CN112747418A (en) * 2021-01-05 2021-05-04 青岛海信日立空调系统有限公司 Air conditioner and cloud server
CN113432268A (en) * 2021-06-28 2021-09-24 广东美的白色家电技术创新中心有限公司 Control method of module unit and related equipment
CN114396714A (en) * 2021-12-14 2022-04-26 广州智业节能科技有限公司 System and method for automatically controlling and operating system starting number
CN114427742A (en) * 2022-01-27 2022-05-03 广州施杰节能科技有限公司 Central air-conditioning cold station energy efficiency control method, device, equipment and storage medium
CN114857812A (en) * 2022-05-26 2022-08-05 深圳市英维克信息技术有限公司 Energy-saving control method, energy-saving control device, electronic apparatus, and storage medium
CN114935222A (en) * 2022-06-10 2022-08-23 中南大学 Semiconductor refrigerator dynamic temperature distribution obtaining and refrigeration control method and system
CN114963631A (en) * 2022-05-25 2022-08-30 珠海格力电器股份有限公司 Control method and control device of refrigeration system and refrigeration system
CN115145211A (en) * 2022-09-06 2022-10-04 上海桁壹高科技有限公司 Control method, system, medium and electronic device of non-switching value device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050240382A1 (en) * 2004-04-22 2005-10-27 Yokogawa Electric Corporation Plant operation support system
CN101251291A (en) * 2008-04-03 2008-08-27 上海交通大学 Central air conditioning system global optimization energy-saving control method and device based on model
JP2010243002A (en) * 2009-04-02 2010-10-28 Daikin Ind Ltd Air conditioning system
CN101968250A (en) * 2010-10-13 2011-02-09 日滔贸易(上海)有限公司 Energy-saving optimized control system and method for refrigerator room
US20130167560A1 (en) * 2010-10-13 2013-07-04 Weldtech Technology (Shanghai) Co., Ltd. Energy-saving optimized control system and method for refrigeration plant room

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050240382A1 (en) * 2004-04-22 2005-10-27 Yokogawa Electric Corporation Plant operation support system
CN101251291A (en) * 2008-04-03 2008-08-27 上海交通大学 Central air conditioning system global optimization energy-saving control method and device based on model
JP2010243002A (en) * 2009-04-02 2010-10-28 Daikin Ind Ltd Air conditioning system
CN101968250A (en) * 2010-10-13 2011-02-09 日滔贸易(上海)有限公司 Energy-saving optimized control system and method for refrigerator room
US20130167560A1 (en) * 2010-10-13 2013-07-04 Weldtech Technology (Shanghai) Co., Ltd. Energy-saving optimized control system and method for refrigeration plant room

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
练斯甄: "冷水机组能效预测及节能优化运行研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110392515A (en) * 2019-07-23 2019-10-29 上海朗绿建筑科技股份有限公司 A kind of Cooling and Heat Source equipment room energy-conserving control method and system based on historical data
CN110737252A (en) * 2019-09-27 2020-01-31 南京大学 Intelligent chemical system based on equipment selection
CN110737252B (en) * 2019-09-27 2021-02-23 南京大学 Intelligent chemical system based on equipment selection
CN110781540B (en) * 2019-09-30 2024-02-02 同济大学建筑设计研究院(集团)有限公司 Design scheme analysis method and device, storage medium and computer equipment
CN110781540A (en) * 2019-09-30 2020-02-11 同济大学建筑设计研究院(集团)有限公司 Design scheme analysis method and device, storage medium and computer equipment
CN111076354A (en) * 2019-12-31 2020-04-28 珠海格力电器股份有限公司 Equipment model selection method and system of central air conditioner
CN112747418A (en) * 2021-01-05 2021-05-04 青岛海信日立空调系统有限公司 Air conditioner and cloud server
CN113432268A (en) * 2021-06-28 2021-09-24 广东美的白色家电技术创新中心有限公司 Control method of module unit and related equipment
CN114396714A (en) * 2021-12-14 2022-04-26 广州智业节能科技有限公司 System and method for automatically controlling and operating system starting number
CN114427742A (en) * 2022-01-27 2022-05-03 广州施杰节能科技有限公司 Central air-conditioning cold station energy efficiency control method, device, equipment and storage medium
CN114963631A (en) * 2022-05-25 2022-08-30 珠海格力电器股份有限公司 Control method and control device of refrigeration system and refrigeration system
CN114963631B (en) * 2022-05-25 2023-08-15 珠海格力电器股份有限公司 Control method and control device of refrigerating system and refrigerating system
CN114857812A (en) * 2022-05-26 2022-08-05 深圳市英维克信息技术有限公司 Energy-saving control method, energy-saving control device, electronic apparatus, and storage medium
CN114935222A (en) * 2022-06-10 2022-08-23 中南大学 Semiconductor refrigerator dynamic temperature distribution obtaining and refrigeration control method and system
CN115145211A (en) * 2022-09-06 2022-10-04 上海桁壹高科技有限公司 Control method, system, medium and electronic device of non-switching value device
CN115145211B (en) * 2022-09-06 2022-12-09 上海桁壹高科技有限公司 Control method, system, medium and electronic device of non-switching value device

Similar Documents

Publication Publication Date Title
CN109028446A (en) A kind of refrigerating plant room control method based on equipment overall performance model
CN109028447A (en) A kind of air conditioner refrigerating computer room intelligence control system and control method based on cloud computing
CN104134100B (en) A kind of energy-saving management system based on cloud computing
CN103277875B (en) Energy-saving control system for refrigeration plant room
CN105444356B (en) A kind of the efficiency Intelligent Optimal control system and its control method of central air conditioner system
CN103062861B (en) Energy-saving method and system for central air conditioner
CN202649779U (en) Constant temperature and constant humidity textile workshop air-conditioning control system based on Internet of things
CN101655272A (en) Energy-saving control management system of network central air conditioner and method thereof
WO2011106918A1 (en) Computer room energy management control system and method for electronic information system based on cloud computing
CN102062459A (en) Energy-saving control system of central air conditioner
CN110220288A (en) Central air-conditioning system intelligent optimized control method and device based on big data cloud platform
CN204943795U (en) A kind of central air conditioner room efficiency optimization system
CN105115113B (en) A kind of central air conditioner room efficiency optimization system
CN107036238B (en) Intelligent energy-saving control method for dynamically predicting external air and load
CN203869259U (en) Variable pressure difference control device based on openness of chilled water valve of tail-end air conditioning equipment
CN104121666A (en) Hourly frequency conversion air supplying system and control method for central air conditioning ventilation system
CN212720195U (en) Cooling water system control device based on system overall energy efficiency ratio COP is best
CN203797883U (en) Frequency conversion cooperative control device of central air conditioner
CN203533800U (en) Fuzzy control system of central air conditioner
CN110895029A (en) Building load prediction method based on temperature of chilled water
CN201335488Y (en) Intelligently optimized control device for central air conditioner
CN203100068U (en) Energy-conservation controlling device for central air conditioning system
CN109283900A (en) Building quality classification water supply and power-assisted water supply and energy saving emission reduction standardized system and control method
CN201476187U (en) Dynamic energy saving system of central air-conditioning
CN203454337U (en) Energy-saving intelligent control system of central air conditioner based on Profibus bus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181218