CN201330397Y - Elevation and expansion old tailing pond - Google Patents
Elevation and expansion old tailing pond Download PDFInfo
- Publication number
- CN201330397Y CN201330397Y CNU2008202392731U CN200820239273U CN201330397Y CN 201330397 Y CN201330397 Y CN 201330397Y CN U2008202392731 U CNU2008202392731 U CN U2008202392731U CN 200820239273 U CN200820239273 U CN 200820239273U CN 201330397 Y CN201330397 Y CN 201330397Y
- Authority
- CN
- China
- Prior art keywords
- dam
- tailing
- dilatation
- elevation
- mine tailing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to an elevation and expansion old tailing pond; an elevation and expansion dam is added on the prior tailing dam with the sand-settling tailing obtained by tailing separation; longitudinal and transverse seepage drainage blind ditches are paved on the foundation of the elevation and expansion dam; and a retaining dam provided with a seepage body is built at the slope toe of the elevation and expansion dam. The elevation and expansion old tailing pond not only can reinforce the tailing dam and expand the capacity of the tailing pond, but also realizes waste utilization, greatly reduces the engineering cost and the tailing storage volume, prolongs the service life of the tailing pond, prevents the investment and occupied area of the new tailing pond, has the advantages of large expanded capacity of the tailing pond, good safety and stability of the tailing dam, convenient engineering construction, local material use, expenditure saving, low maintenance and management expenses and the like, and great economic benefit and obvious social benefit.
Description
Technical field
The utility model belongs to the milltailings treatment facility, relates in particular to a kind of mine tailing that utilizes the metal mine ore dressing to discharge, and increases thickening tailing dam, stablizes dam body thereby form, and what prolong length of service increases dilatation tailing storehouse.
Background technology
The mine tailing storehouse that China metal mine ore dressing plant is used, be built in twentieth century five, the sixties even more early mostly, through long-term storing up and using, substantially, be at present the intermediary and later stages of the limit and the mine tailing storehouse length of service of mine tailing storage volumes, therefore also all exist certain potential safety hazard to some extent, as not handled as early as possible and solve, even the danger that tailing dam caves in, mine tailing breaches a dyke can appear at any time.In order to keep the continuous ordinary production in mine, each ore dressing manufacturer and relevant department and researcher are doing one's utmost to seek the preferred plan that the mine tailing later stage stores, to solve the storage problem that continues of mine tailing.The approach that solves: the one, newly-built mine tailing storehouse, the 2nd, transform existing mine tailing storehouse.If a newly-built mine tailing storehouse, the existence investment is many, expropriation of land is difficult, ambient influnence is big, the problem that the construction period is long.If dilatation is increased in the original debris storehouse, because existing mine tailing storehouse generally adopts " upstream formula " mine tailing to build a dam, disperse ore drawing, the dam body that is constituted to contain multi-level sludge interlayer on the dam, cause the dam seepage line height, structural strength is low, the dam stability extreme difference.If continue to increase dilatation with " upstream formula " mode of building a dam, then not only the engineering difficulty is big, and builds that the mine tailing high dam is subjected to the restriction of dam stability and the storage ore deposit finite capacity that can enlarge.
Summary of the invention
The purpose of this utility model is exactly at the problems referred to above, aims to provide a kind of simple in structurely, and materials are gathered materials on the spot, and can guarantee that safety of dam body is stable, the mine tailing storehouse of realizing increasing significantly dilatation.
For this reason, the technical solution taked of the utility model is:
A kind of dilatation tailing storehouse of increasing is to set up to increase the dilatation dam on the basis that original " upstream formula " mine tailing is built a dam, and is equipped with on the dam foundation of increasing the dilatation dam vertically and transverse row is oozed french drain, has the retaining dam along the toe place of increasing the dilatation dam.
Described retaining dam system adopts the building stones heap to build and forms, and retaining is established the infiltration body in the dam, makes dam body form the drainage rock-fill dam structure.
The described dilatation dam of increasing is to be piled up by the coarse fraction sand setting mine tailing that separates in the mine tailing to form.
The beneficial effects of the utility model are:
The utility model is built a dam with original " upstream formula " mine tailing and is the basis, utilize the discarded for many years mine tailing of piling up, through the sand setting mine tailing of resulting separation original mine tailing is built a dam to pile up and increase thickening, when reinforcing tailing dam, enlarging the mine tailing storage capacity, realized twice laid, both greatly reduce engineering cost, reduced the mine tailing storage capacity again.
Simultaneously, make full use of the physico mechanical characteristic of mine tailing, the geography in mine tailing storehouse, orographic condition and unemployed space, and carry out the mine tailing storehouse in conjunction with the engineering present situation in tailing storehouse and increase that drainage is reinforced in dilatation, base slope and ground row is oozed processing, not only greatly prolonged the length of service in mine tailing storehouse, avoid the investment and the occupation of land in newly-built mine tailing storehouse, and have that dilatation amount in mine tailing storehouse is big, the tailing dam security and stability is good, engineering construction is convenient, gather materials on the spot and reduce expenses and many advantages such as the maintenance management expense is low, have very big economic benefit and remarkable social benefit.
Description of drawings
Accompanying drawing is for increasing dilatation tailing storehouse generalized section.
Among the figure: mine tailing is built a dam 1, is increased dilatation dam 2, retaining dam 3, retaining dam infiltration body 4, row ooze french drain 5.
The specific embodiment
Below, in conjunction with the accompanying drawings the utility model is further described.
By accompanying drawing as seen, the utility model mainly by mine tailing build a dam 1, increase dilatation dam 2, retaining dam 3 and row ooze french drain 5 and formed.Its unitary construction is to build a dam at original " upstream formula " tailing to pile up the coarse fraction sand setting mine tailing that separates with the side from mine tailing above 1, forms and increases dilatation dam 2, thereby make whole mine tailing dam body increase thickening, enlarges the storage ore deposit capacity in mine tailing storehouse.
In order to prevent to increase the coarse fraction sand setting mine tailing flow further downstream that dilatation dam 2 is piled up, promptly with the building stones block retaining dam 3 is arranged one at the lower margin of increasing dilatation dam 2 along the whole toe of increasing dilatation dam 2, retaining 3 inside, dam are provided with a plurality of infiltration bodies, make the retaining dam body form a drainage rock-fill dam structure, to drain the moisture in the coarse fraction sand setting mine tailing, avoid coarse fraction sand setting mine tailing owing to the landslide phenomenon too much appears in water content, improve the stability of increasing dilatation dam 2 dam bodys.Coarse fraction sand setting mine tailing is to adopt hydrocyclone that discarded mine tailing is separated to obtain after handling with classification, and the overflow mine tailing that obtains is simultaneously handled by the mine tailing of storing.
In addition, be equipped with vertical transverse row that reaches and ooze french drain 5 on the ground of increasing dilatation dam 2, its effect also is the water seepage that reduces and discharge whole dam body, improves the intensity of dam body, the service life in prolongation mine tailing storehouse.
Increasing dilatation with certain mining industry Co., Ltd mill tailings storehouse is example.Building a dam for " upstream formula " mine tailing in this mine tailing storehouse, has been in the mine tailing storehouse storage storage capacity limit and the length of service near latter stage, only has 650 days these storehouses promptly to reach former design according to measuring and calculating and finally pile up absolute altitude, therefore need a newly-built mine tailing storehouse badly with the production that continues.Yet budgetary estimate is the result think, if discharging of newly-built year mine tailing amount 2,750,000 m
3New mine tailing storehouse, not only investment is big, and enterprise is difficult to bear; And the soil of requisition is many, and formality is numerous and diverse; In addition, design and long construction period will directly influence ore dressing production, therefore build new storehouse almost become impossible.After dilatation tailing storehouse technical scheme is originally increased in employing, do not influencing under the prerequisite of mine tailing processing, very fast just enforcement finished at all.Through practical measurement, can prolong this mine tailing storehouse length of service 11.5, invest 7,290,000 yuan, mine tailing treatment technology economic indicator is 1.5 yuan/m
3, alleviated the urgent need that mine tailing is handled, quite be subjected to the welcome of enterprise.
Claims (3)
1, a kind of dilatation tailing storehouse of increasing is characterized in that, sets up on the basis that original mine tailing is built a dam and increases the dilatation dam, and be equipped with on the dam foundation of increasing the dilatation dam vertically and transverse row is oozed french drain, has the retaining dam along the toe place of increasing the dilatation dam.
2, the dilatation tailing storehouse of increasing according to claim 1 is characterized in that, described retaining dam system adopts the building stones heap to build and forms, and retaining is established the infiltration body in the dam, makes dam body form the drainage rock-fill dam structure.
3, the dilatation tailing storehouse of increasing according to claim 1 is characterized in that, the described dilatation dam of increasing is to be piled up by the coarse fraction sand setting mine tailing that separates in the mine tailing to form.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202392731U CN201330397Y (en) | 2008-12-31 | 2008-12-31 | Elevation and expansion old tailing pond |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008202392731U CN201330397Y (en) | 2008-12-31 | 2008-12-31 | Elevation and expansion old tailing pond |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201330397Y true CN201330397Y (en) | 2009-10-21 |
Family
ID=41223774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008202392731U Expired - Fee Related CN201330397Y (en) | 2008-12-31 | 2008-12-31 | Elevation and expansion old tailing pond |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201330397Y (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845817A (en) * | 2010-06-23 | 2010-09-29 | 贵阳铝镁设计研究院 | Method for increasing capacity of flat type wet-method red mud disposal site by dry method |
CN102261075A (en) * | 2010-10-30 | 2011-11-30 | 鞍钢集团矿业公司 | Method for optimizing waste rock field revetment by using solidified filling materials |
CN102644288A (en) * | 2011-11-12 | 2012-08-22 | 刘照朗 | Method for constructing saving, clean and safe anhydrous tailings pond |
CN102691303A (en) * | 2012-05-22 | 2012-09-26 | 北京航空航天大学 | A method for improving in-service tailings pond capacity and a device thereof |
CN102691304A (en) * | 2012-05-22 | 2012-09-26 | 北京航空航天大学 | Method for increasing mine tailing storage reserve based on designed storage capacity |
CN104264690A (en) * | 2014-09-01 | 2015-01-07 | 湖南辰州矿业股份有限公司 | Method for increasing volume of tailings pond for mine enterprise |
CN105951849A (en) * | 2016-06-24 | 2016-09-21 | 陕西冶金设计研究院有限公司 | Tailings pond potential safety hazard treatment system and treatment method thereof |
CN106223347A (en) * | 2016-08-15 | 2016-12-14 | 大连地拓重工有限公司 | A kind of method extending the in-service Tailings Dam length of service |
CN106284373A (en) * | 2016-08-30 | 2017-01-04 | 金堆城钼业股份有限公司 | A kind of method of construction of Tailings Dam |
CN106284374A (en) * | 2016-09-26 | 2017-01-04 | 广东省建筑设计研究院 | A kind of old dam entirety increases structure and the attachment structure on new and old dam |
CN110080201A (en) * | 2019-05-21 | 2019-08-02 | 唐山工业职业技术学院 | A kind of row's infiltration system and construction method for accelerating the dam body consolidation settlement of alkaline residue library |
CN110171661A (en) * | 2019-04-17 | 2019-08-27 | 曹妃甸港矿石码头股份有限公司 | A kind of bulk cargo terminal storage yard stockpiling ability expansion method |
CN111305210A (en) * | 2020-03-05 | 2020-06-19 | 中钢集团马鞍山矿山研究总院股份有限公司 | Ultra-fine grain tailing pond heightening and expanding heap-discharging structure adopting midline method for one-time dam building |
CN111305211A (en) * | 2020-03-05 | 2020-06-19 | 中钢集团马鞍山矿山研究总院股份有限公司 | Novel method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method |
-
2008
- 2008-12-31 CN CNU2008202392731U patent/CN201330397Y/en not_active Expired - Fee Related
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101845817A (en) * | 2010-06-23 | 2010-09-29 | 贵阳铝镁设计研究院 | Method for increasing capacity of flat type wet-method red mud disposal site by dry method |
CN101845817B (en) * | 2010-06-23 | 2014-10-08 | 贵阳铝镁设计研究院有限公司 | Method for increasing capacity of flat type wet-method red mud disposal site by dry method |
CN102261075B (en) * | 2010-10-30 | 2012-11-28 | 鞍钢集团矿业公司 | Method for optimizing waste rock field revetment by using solidified filling materials |
CN102261075A (en) * | 2010-10-30 | 2011-11-30 | 鞍钢集团矿业公司 | Method for optimizing waste rock field revetment by using solidified filling materials |
CN102644288B (en) * | 2011-11-12 | 2016-02-03 | 刘照朗 | A kind of construction method saving the anhydrous Tailings Dam of clean and safe |
CN102644288A (en) * | 2011-11-12 | 2012-08-22 | 刘照朗 | Method for constructing saving, clean and safe anhydrous tailings pond |
CN102691304B (en) * | 2012-05-22 | 2014-07-02 | 北京航空航天大学 | Method for increasing mine tailing storage reserve based on designed storage capacity |
CN102691303B (en) * | 2012-05-22 | 2014-07-02 | 北京航空航天大学 | A method for improving in-service tailings pond capacity and a device thereof |
CN102691303A (en) * | 2012-05-22 | 2012-09-26 | 北京航空航天大学 | A method for improving in-service tailings pond capacity and a device thereof |
CN102691304A (en) * | 2012-05-22 | 2012-09-26 | 北京航空航天大学 | Method for increasing mine tailing storage reserve based on designed storage capacity |
CN104264690A (en) * | 2014-09-01 | 2015-01-07 | 湖南辰州矿业股份有限公司 | Method for increasing volume of tailings pond for mine enterprise |
CN105951849A (en) * | 2016-06-24 | 2016-09-21 | 陕西冶金设计研究院有限公司 | Tailings pond potential safety hazard treatment system and treatment method thereof |
CN106223347B (en) * | 2016-08-15 | 2018-07-03 | 大连地拓环境科技有限公司 | A kind of method for extending the in-service Tailings Dam length of service |
CN106223347A (en) * | 2016-08-15 | 2016-12-14 | 大连地拓重工有限公司 | A kind of method extending the in-service Tailings Dam length of service |
CN106284373A (en) * | 2016-08-30 | 2017-01-04 | 金堆城钼业股份有限公司 | A kind of method of construction of Tailings Dam |
CN106284374A (en) * | 2016-09-26 | 2017-01-04 | 广东省建筑设计研究院 | A kind of old dam entirety increases structure and the attachment structure on new and old dam |
CN110171661A (en) * | 2019-04-17 | 2019-08-27 | 曹妃甸港矿石码头股份有限公司 | A kind of bulk cargo terminal storage yard stockpiling ability expansion method |
CN110080201A (en) * | 2019-05-21 | 2019-08-02 | 唐山工业职业技术学院 | A kind of row's infiltration system and construction method for accelerating the dam body consolidation settlement of alkaline residue library |
CN111305210A (en) * | 2020-03-05 | 2020-06-19 | 中钢集团马鞍山矿山研究总院股份有限公司 | Ultra-fine grain tailing pond heightening and expanding heap-discharging structure adopting midline method for one-time dam building |
CN111305211A (en) * | 2020-03-05 | 2020-06-19 | 中钢集团马鞍山矿山研究总院股份有限公司 | Novel method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method |
CN111305210B (en) * | 2020-03-05 | 2021-05-25 | 中钢集团马鞍山矿山研究总院股份有限公司 | Ultra-fine grain tailing pond heightening and expanding heap-discharging structure adopting midline method for one-time dam building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201330397Y (en) | Elevation and expansion old tailing pond | |
CN103669398B (en) | A kind of monoblock type cutting retaining wall | |
CN111305210B (en) | Ultra-fine grain tailing pond heightening and expanding heap-discharging structure adopting midline method for one-time dam building | |
CN201485823U (en) | Anti-seepage structure of hydraulic asphalt concrete panel | |
CN206220972U (en) | Frame branch arched tunnel lining structure | |
CN103266549A (en) | Routing table water discharging system in construction period of expressway reconstruction and extension project | |
CN104695386A (en) | Blocking and discharge structure and method for ditch water treatment | |
CN111305211B (en) | Method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method | |
CN103628488B (en) | A kind of damming method of mine tailing embankment dam | |
CN103015487A (en) | System using green land rainwater for compensating urban groundwater | |
CN204803703U (en) | Concrete road surface water collect structures permeates water | |
CN203808020U (en) | Concrete face rock-fill dam structure with mudstone damming materials | |
CN203383192U (en) | Dry-type discharging tailing sand foundation impervious dam structure | |
CN104264635A (en) | Construction technology of slag stacking behind concrete faced rock-fill dam | |
CN104652383A (en) | Tailings pond dam body free draining device | |
CN203625928U (en) | Integrated cutting retaining wall | |
CN202090321U (en) | Forebay bottom plate displacement type drain hole for drainage pump station | |
CN201485845U (en) | Tailing dam muddy foundation reinforcing device | |
CN104846779A (en) | Method for heaping up waterproof tailings pond dam | |
CN205503182U (en) | Current drive system between ditch of both sides in rich water tunnel with inclined shaft | |
CN205012318U (en) | Soft soil foundation treatment device | |
CN204551386U (en) | For the gear row structure of ditch water treatment | |
CN205399343U (en) | Reinforcement type waterproof and anti -seepage bank protection | |
CN104929081A (en) | Enrockment concrete permeable dike and construction method thereof | |
CN201648879U (en) | Mining area gabion structure railway embankment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091021 Termination date: 20161231 |
|