CN201321723Y - Steel column none-cable wind rope correcting structure - Google Patents

Steel column none-cable wind rope correcting structure Download PDF

Info

Publication number
CN201321723Y
CN201321723Y CNU2008201811085U CN200820181108U CN201321723Y CN 201321723 Y CN201321723 Y CN 201321723Y CN U2008201811085 U CNU2008201811085 U CN U2008201811085U CN 200820181108 U CN200820181108 U CN 200820181108U CN 201321723 Y CN201321723 Y CN 201321723Y
Authority
CN
China
Prior art keywords
steel column
cable wind
correcting
wind rope
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201811085U
Other languages
Chinese (zh)
Inventor
郭孔松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Jingtang Construction Co Ltd
Original Assignee
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Jingtang Construction Co Ltd filed Critical MCC Jingtang Construction Co Ltd
Priority to CNU2008201811085U priority Critical patent/CN201321723Y/en
Application granted granted Critical
Publication of CN201321723Y publication Critical patent/CN201321723Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a structure for installing and correcting steel columns in the process of installing a high-rise steel structure building, in particular to a steel column none-cable wind rope correcting structure. The steel column none-cable wind rope correcting structure comprises connecting plates which are welded on an upper steel column interface and a lower steel column interface, and clamp plates which are connected with the upper connecting plate and the lower connecting plate, the connecting plates are special-shaped plates with corners, the corners are forced support points of a jack, and elliptical screw holes are arranged on the clamp plates for installation. The steel column none-cable wind rope correcting structure has the beneficial effects that the special-shaped connecting plates are directly welded on the steel columns in the manufacture stage, the technical measures of demanding welding when in spot operations are solved, the time, materials and labor are saved, cable wind ropes do not need drawing in high-altitude, all operations are finished in a steel column installation platform, the power efficiency is improved, the operation panels are centralized, the structure avoids that operating staff should walk in high-altitude in large-amplitude, the unsafe factors are greatly reduced, the correcting effect is good, and the structure is fixed through spot welding after correction and does not affect other procedures or special construction.

Description

Steel column does not have the cable wind rope correcting structure
Technical field:
The utility model relates to installation, the correcting structure of steel column in the high-rise steel structure construction and installation process, and especially a kind of steel column does not have the cable wind rope correcting structure.
Background technology:
At present, steel column is installed timing in high-rise steel structure, needs on-the-spot junction plate in steel column joint weld ordinary rectangular plated construction, uses cable wind rope to regulate the steel column verticality then, and the drawback of its existence is: work high above the ground is not easy to operate; Cable wind rope draws to set up an office and is difficult for selecting, and does not have to draw outside the exterior frame column and set up an office; Work high above the ground personnel scope of operation span is big, operator safety protection difficulty; Need large quantities of turnover utensils such as cable wind rope, jack; Steel column is proofreaied and correct the back cable wind rope that finishes and is bumped unintentionally, proofreaies and correct ineffective demand repetitive operation as a result, and effect is not high; Cable wind rope draws everywhere to establish and hinders other operations or professional construction.
The utility model content:
The utility model is intended to solve the above-mentioned drawback that prior art exists, and provides a kind of steel column that can accelerate unsafe factor in speed of application, raising installation accuracy, the minimizing operation not have the cable wind rope correcting structure.
The technical scheme that the utility model addresses the above problem employing is: a kind of steel column does not have the cable wind rope correcting structure, comprise: the junction plate that is welded on upper and lower steel column interface, the clamping plate that connect upper and lower junction plate, described junction plate is the special-shaped plate at band turning, and its turning is the stressed strong point of jack; Described installation is provided with oval bolt hole with clamping plate.
Compared with prior art, the beneficial effects of the utility model are:
1. at the direct special-shaped junction plate of welding on steel column of process segment, the technical measures that need weld when having solved execute-in-place are saved time, material, manpower;
2. avoided the high-altitude to draw and established cable wind rope, all operations is all finished in the steel column mounting platform, and effect improves;
3. operating surface is concentrated, and avoids operating personnel's high-altitude walking significantly, significantly reduces unsafe factor;
4. calibration result is good, has proofreaied and correct back spot welding and has fixed, and does not hinder other operations or professional construction.
Description of drawings:
Fig. 1 is a structural representation of the present utility model.
Among the figure: go up steel column 1, junction plate 2, gad 3, clamping plate 4, following steel column 5, jack 6, bolt hole 7.
The specific embodiment:
The utility model is described in further detail below in conjunction with embodiment that accompanying drawing provides.The described steel column of present embodiment does not have the cable wind rope correcting structure as shown in Figure 1, the interface of last steel column 1 and following steel column 5 is welded with the junction plate 2 at band turning respectively, described turning is the stressed strong point of jack 6, connect upper and lower junction plate 2 clamping plate 4 its be provided with oval bolt hole 7, steel column is movable under jack 6 effects when being convenient to loose bolts.
Absolute altitude utilizes the rising and falling of tower crane suspension hook, crowbar to stir to regulate when adjusting goes up steel column 1 and following steel column 5 gaps until meeting the requirements, and squeezes into gad 3 in upper and lower junction plate 2 gaps, reaches the purpose of coarse adjustment absolute altitude.During the steel column rectify perpendicular, loosening connecting bolt can carry out the adjustment of steel column verticality, adjust by jack 6 and gad 3, at the homonymy hammering gad 3 of steel column deflection or jacking jack 6 slightly, very fast just can be with rectify perpendicular to meeting the requirements.

Claims (1)

1. a steel column does not have the cable wind rope correcting structure, comprising: be welded on the junction plate of upper and lower steel column interface, connect the clamping plate of upper and lower junction plate, it is characterized in that: described junction plate is the special-shaped plate at band turning, and its turning is the stressed strong point of jack; Described installation is provided with oval bolt hole with clamping plate.
CNU2008201811085U 2008-12-12 2008-12-12 Steel column none-cable wind rope correcting structure Expired - Fee Related CN201321723Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201811085U CN201321723Y (en) 2008-12-12 2008-12-12 Steel column none-cable wind rope correcting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201811085U CN201321723Y (en) 2008-12-12 2008-12-12 Steel column none-cable wind rope correcting structure

Publications (1)

Publication Number Publication Date
CN201321723Y true CN201321723Y (en) 2009-10-07

Family

ID=41159109

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201811085U Expired - Fee Related CN201321723Y (en) 2008-12-12 2008-12-12 Steel column none-cable wind rope correcting structure

Country Status (1)

Country Link
CN (1) CN201321723Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982048A (en) * 2014-05-04 2014-08-13 安徽富煌钢构股份有限公司 Overhead correction adjuster for box-shaped steel columns in ultrahigh layer steel structure
CN108999415A (en) * 2018-09-28 2018-12-14 北京首钢建设集团有限公司 A kind of method that box column uses high-strength bolt and connecting plate integrated positioning interface
CN110359722A (en) * 2019-06-28 2019-10-22 五冶集团上海有限公司 A kind of steel column correction jacking bracket and its application method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103982048A (en) * 2014-05-04 2014-08-13 安徽富煌钢构股份有限公司 Overhead correction adjuster for box-shaped steel columns in ultrahigh layer steel structure
CN108999415A (en) * 2018-09-28 2018-12-14 北京首钢建设集团有限公司 A kind of method that box column uses high-strength bolt and connecting plate integrated positioning interface
CN110359722A (en) * 2019-06-28 2019-10-22 五冶集团上海有限公司 A kind of steel column correction jacking bracket and its application method

Similar Documents

Publication Publication Date Title
CN204876779U (en) Slope shaft tower orthotic devices
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN201321723Y (en) Steel column none-cable wind rope correcting structure
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN204850516U (en) A horizontal lifeline system for steel construction factory building
CN203066491U (en) Locator for installing round tube type connection member
CN208440996U (en) A kind of novel inlet pipe
CN201347590Y (en) Quick connection and calibration clamp for steel column joint
CN108979152A (en) Fetal membrane and its construction method for the high-altitude segmented assembly of large span steel truss
CN205296203U (en) Tower crane basis connection structure
CN201826438U (en) Steel column convenient for constructing temporary operating platform
CN204416969U (en) The adjustable arm head of a kind of tower machine
CN202170644U (en) Compactor for attaching profiled steel sheet with surface of steel beam
CN203188612U (en) Beam frame type building template system
CN112357743A (en) Manufacturing method of simple hoisting tool for purlines of factory building roof
CN102296831B (en) Compactor for jointing surfaces of channeled steel plate and steel girder
CN203080988U (en) Umbrella-shaped standard processing shed
CN109505304A (en) A kind of permafrost soil area assembled type base for power transmission line iron tower prefab-form
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment
CN204826704U (en) A horizontal lifeline system for steel construction factory building
CN214942310U (en) Supporting template for building reinforcement
CN216239759U (en) Building engineering reinforcing apparatus
CN219794722U (en) Steel beam connection auxiliary frame
CN219080931U (en) Tool type buttress triangular protection device for close-spliced prefabricated outer wall
CN204418696U (en) Vertical reinforcement spreading lifting assistor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091007

Termination date: 20151212

EXPY Termination of patent right or utility model