CN201317910Y - Mobile fixed point maintenance platform for large dam road bridge - Google Patents

Mobile fixed point maintenance platform for large dam road bridge Download PDF

Info

Publication number
CN201317910Y
CN201317910Y CNU2008201809992U CN200820180999U CN201317910Y CN 201317910 Y CN201317910 Y CN 201317910Y CN U2008201809992 U CNU2008201809992 U CN U2008201809992U CN 200820180999 U CN200820180999 U CN 200820180999U CN 201317910 Y CN201317910 Y CN 201317910Y
Authority
CN
China
Prior art keywords
road bridge
platform
fixed point
suspension bracket
maintenance platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201809992U
Other languages
Chinese (zh)
Inventor
薛晶
张桂英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PANJIAKOU POWER STORAGE PLANT OF STATE GRID XINYUAN Co Ltd
State Grid Xinyuan Co Ltd
Original Assignee
PANJIAKOU POWER STORAGE PLANT OF STATE GRID XINYUAN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PANJIAKOU POWER STORAGE PLANT OF STATE GRID XINYUAN Co Ltd filed Critical PANJIAKOU POWER STORAGE PLANT OF STATE GRID XINYUAN Co Ltd
Priority to CNU2008201809992U priority Critical patent/CN201317910Y/en
Application granted granted Critical
Publication of CN201317910Y publication Critical patent/CN201317910Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a maintenance platform in a huge project, in particular to a mobile fixed point maintenance platform for a large dam road bridge, which comprises a hanger platform and guardrails arranged on the road bridge, wherein the two sides of the hanger platform are connected with a cross beam by a connecting rod; a chain block is arranged between the cross beam and the hanger platform; the cross beam is hinged with a pulling rod with a chain wheel on the upper end; the guardrail is provided with bearing tubes in parallel; one end of the bearing tube is connected with a weight tray, and the other end thereof is provided with a slideway which is matched with the chain wheel. Compared with the prior art, the utility model is simple in the structure, is convenient to manufacture, can be recycled, has high safety factor and convenient operation, can not effect the normal living and production, and is short in the repair time.

Description

Dam road bridge fixed point maintenance mobile platform
Technical field
The utility model relates to maintenance platform in the major works, specifically a kind of dam road bridge fixed point maintenance mobile platform.
Background technology
Fixed point inspection, the service work of lower storage reservoir dam road bridge are heavy, present repair method is to use ship to build scaffold with steel pipe under road bridge between the water surface and bridge to carry out service work, because the steel pipe quantity that the every bridge of road bridge uses is many, volume, the weight of steel pipe are big, repair time is quite long, waste bigger man power and material, and in maintenance process, need the vehicle of road bridge to break off a friendship, have a strong impact on normal production and life.
The utility model content
The utility model technical issues that need to address are: provide a kind of simple in structure, and under the situation that road bridge is not broken off a friendship, the dam road bridge fixed point maintenance mobile platform that can overhaul road bridge at short notice.
Realize that the technical scheme that above-mentioned purpose adopts is: a kind of dam road bridge fixed point maintenance mobile platform, comprise suspension bracket platform and the guardrail that places on the road bridge, the both sides of described suspension bracket platform are connected with crossbeam with connecting rod, between crossbeam and the suspension bracket platform Chain block are housed; Be hinged with the pull bar of upper end band pulley on the described crossbeam; Be set side by side with bearing tube on the guardrail, an end of this bearing tube is connected with ballast box, on its other end slideway is housed, and this slideway and pulley are used.
Compared with prior art, the utility model is simple in structure, and is easy to make, can be recycled, and the safety factor height, easy to operate, do not influence normal life, production, the repair time is short.
Description of drawings
Fig. 1 is a front view of the present utility model.
Fig. 2 is the vertical view of Fig. 1.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is described further.
Referring to accompanying drawing 1-2, in the present embodiment, use diameter as the weldering of the steel pipe of 50mm make a long 10m, wide 1m, high 1m is the suspension bracket platform 5 of cuboid frame construction, the bottom of this suspension bracket platform 5 is fixing with the bamboo raft tiling.All be connected with crossbeam 9 above the suspension bracket platform 5 in the both sides of suspension bracket platform 5, a Chain block 11 is housed respectively between crossbeam 9 and the suspension bracket platform 5 with connecting rod 10.What described crossbeam 9 adopted is that diameter is the steel pipe of 20mm, is hinged with two pull bars 12 on the crossbeam 9, and these pull bar 12 upper ends all are equipped with pulley 8.Being set side by side with diameter on the guardrail 2 is the bearing tube 3 of 50mm, and an end of this bearing tube 3 is connected with ballast box 4 on being fixed on road bridge 6, is welded with a grooved slideway 7 on its other end, and this slideway 7 is used with the pulley 8 of pull bar 12 upper ends.
Ballast box 4 is placed on the bridge floor inboard of road bridge 6, uses the sandbag counterweight in this ballast box 4.All adopt pipe clamp fixedly connected between all steel pipes.
Using method of the present utility model is: after suspension bracket platform 5 installs, the maintainer can be by walking back and forth in suspension bracket platform 5, diverse location to road bridge 6 carries out highly difficult operations such as drill hole sampling, charing, after a hole road bridge inspection finishes, remove the connecting rod 10 of platform upstream side, make suspension bracket platform 5 one ends sagging, unsettled, utilize the connecting rod 10 in downstream on slideway 8, to slide, realize that suspension bracket platform 5 integral body are moved to next hole road bridge, reconnect the connecting rod 10 of inspection platform upstream side then.So repeatedly, can finish the fixed point service work of road bridge at short notice.

Claims (1)

1, a kind of dam road bridge fixed point maintenance mobile platform comprises suspension bracket platform and the guardrail that places on the road bridge, it is characterized in that the both sides of described suspension bracket platform are connected with crossbeam with connecting rod, between crossbeam and the suspension bracket platform Chain block are housed; Be hinged with the pull bar of upper end band pulley on the described crossbeam; Be set side by side with bearing tube on the guardrail, an end of this bearing tube is connected with ballast box, on its other end slideway is housed, and this slideway and pulley are used.
CNU2008201809992U 2008-12-12 2008-12-12 Mobile fixed point maintenance platform for large dam road bridge Expired - Fee Related CN201317910Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201809992U CN201317910Y (en) 2008-12-12 2008-12-12 Mobile fixed point maintenance platform for large dam road bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201809992U CN201317910Y (en) 2008-12-12 2008-12-12 Mobile fixed point maintenance platform for large dam road bridge

Publications (1)

Publication Number Publication Date
CN201317910Y true CN201317910Y (en) 2009-09-30

Family

ID=41196676

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201809992U Expired - Fee Related CN201317910Y (en) 2008-12-12 2008-12-12 Mobile fixed point maintenance platform for large dam road bridge

Country Status (1)

Country Link
CN (1) CN201317910Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102730561A (en) * 2012-07-10 2012-10-17 烟台宝井钢材加工有限公司 Overhauling platform for travelling crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102730561A (en) * 2012-07-10 2012-10-17 烟台宝井钢材加工有限公司 Overhauling platform for travelling crane

Similar Documents

Publication Publication Date Title
CN104131519B (en) A kind of bridging toughening equipment construction method
CN202830785U (en) High pier bridge cantilever casting concrete 0 # block pier top bracket
CN201317910Y (en) Mobile fixed point maintenance platform for large dam road bridge
CN205604547U (en) Anti GBF tubular construction that floats
CN2869202Y (en) External-hooping internal-arching sliding form device
CN205046825U (en) Pier drum type fender maintenance platform
CN203096608U (en) Mobile platform for bridge fixed-point overhauling
CN202079565U (en) Auxiliary tool for installing steel arch center
CN102330413B (en) Construction method for enabling bridge girder erection machine to independently go up and down girder carrier
CN103072922A (en) Manhole cover opening device operating trolley
CN214570413U (en) Special device for underground rapid lifting pipeline of mine
CN207700655U (en) A kind of precast beam stretching construction lift work platform
CN210561782U (en) Pier support is changed with supplementary construction equipment
CN202644407U (en) Demoulding device for bottom plate bracket of capping beam constructed by hoop method
CN201305437Y (en) A mobile platform for penstock maintenance
CN203128120U (en) Manhole cover opening device work vehicle
CN201746247U (en) Fixed double hoisting cantilever rail girder hanger
CN202559734U (en) Cantilever slab template-supporting inclined support device of aluminum alloy template system
CN206707719U (en) The bracket of supporting chassis translation after a kind of constructing tunnel auxiliary TBM
CN201377639Y (en) Pipe channeling device used in pipeline construction of pipe rack
CN206408528U (en) Precast T-Beam adjustable and portable formula support
CN203834365U (en) Assembly device for continuous beam pier construction supporting frames
CN103938551B (en) A kind of apparatus for assembling of continuous beam pier support for construction
CN214653267U (en) Underwater concrete pouring guide pipe lifting frame convenient to move
CN204321975U (en) A kind of loader differential mechanism assembly dismounting support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090930

Termination date: 20101212