CN201310101Y - Control modulus pile formulation apparatus - Google Patents

Control modulus pile formulation apparatus Download PDF

Info

Publication number
CN201310101Y
CN201310101Y CNU2008202152969U CN200820215296U CN201310101Y CN 201310101 Y CN201310101 Y CN 201310101Y CN U2008202152969 U CNU2008202152969 U CN U2008202152969U CN 200820215296 U CN200820215296 U CN 200820215296U CN 201310101 Y CN201310101 Y CN 201310101Y
Authority
CN
China
Prior art keywords
pile
drill bit
model
control
controlling platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008202152969U
Other languages
Chinese (zh)
Inventor
缪林昌
赵韩
马在宏
蒋爱祥
王非
张亚军
景春
陈家富
张成相
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CNU2008202152969U priority Critical patent/CN201310101Y/en
Application granted granted Critical
Publication of CN201310101Y publication Critical patent/CN201310101Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a control modulus pile formulation apparatus and a method thereof, which belongs to the field of geotechnical engineering composite foundation bearing characteristic tests. The apparatus of the utility model is composed of a drill bit, a motor, a control platform, a drill frame, a drill rod, a transmitting chain, a slurry-feeding pipe, a pressurizing pump and a model box. The utility model realizes the functions of ration design of control transformation and control bearing capacity of a composite foundation and transfer of soils between piles through pile soil stress ratio adjustments.

Description

Control modulus stake pile-forming equipment
Technical field
The utility model relates to a kind of control modulus stake pile-forming equipment, belongs to geotechnical engineering composite foundation bearer properties field tests.
Background technology
Composite foundation is present most popular a kind of soft-soil foundation treatment method in the current geotechnical engineering field, because the complexity of foundation soil condition, at present the bearer properties mechanism research of composite foundation is difficult to satisfy the requirement of actual engineering, it can only be the quantification that semiempirical half is simplified, because pile and testing equipment can not satisfy the needs of research, have seriously restricted the deep development of theory of composite foundation.Laboratory test often adopts the Model Pile of organic material to carry out, and result of the test and actual monitoring result come in and go out bigger.Just because of Model Pile and relevant device exist very big inadaptability, relevant research and design can only be in by virtue of experience or the state of existing engineering priori.
The utility model content
The technical problems to be solved in the utility model is to propose a kind of control modulus stake pile-forming equipment at the defective that prior art exists.
The utility model control modulus stake pile-forming equipment, by drill bit, motor, controlling platform, drilling cramp, drilling rod, driving-chain, feed pipe for mortar, force (forcing) pump, model casing is formed, wherein drill bit and drilling rod all are provided with longitudinal hole, the delivery outlet of force (forcing) pump is communicated with the top through hole of drilling rod by feed pipe for mortar, the bottom of drilling rod and the top of controlling platform are oppositely arranged, the bottom of controlling platform and the top of drilling cramp are fixed, the top of driving-chain is oppositely arranged with the cross bar on drilling cramp top respectively, the bottom of driving-chain is oppositely arranged with the two ends, the left and right sides of controlling platform respectively, motor is fixed on the power transmission shaft of the top of drilling cramp and motor and driving-chain and controlling platform and is oppositely arranged, the bottom of drill bit and controlling platform is oppositely arranged, the bottom of drilling cramp is provided with model casing, and model casing is positioned at the below of drill bit.
Drill bit 1 adopts full augers to guarantee that the boring behind the pore-forming can not cause the phenomenons such as hole, distortion of collapsing because of the lateral pressure of soil, guarantee pore-forming the quality outside diameter be 5cm, the aperture of drill bit internal (is the mud jacking hole, being communicated with feed pipe for mortar) aperture is 1.0~1.5cm, so that cement mortar can be pressed into bored pile.
The output pressure of cement mortar is kept in the control of cement mortar delivery pump, and cement mortar is injected in the boring incessantly.
The utility model design is carried out pile by adjusting different cement paste proportionings, it is consistent with the material of actual engineering piles to make into pile material, and can quantitatively control the modulus of Model Pile, realize the design of controlled deformation, realize the controlled deformation of composite foundation and the quantitative design of control bearing capacity, give full play to the effect of inter-pile soil by the stress ratio of adjusting stake soil.
Description of drawings
Fig. 1: the utility model equipment structure chart.
The specific embodiment
As shown in Figure 1.A kind of control modulus stake pile-forming equipment, by drill bit 1, motor 2, controlling platform 3, drilling cramp 4, drilling rod 5, driving-chain 6, feed pipe for mortar 7, force (forcing) pump 8, model casing 10 is formed, wherein drill bit 1 and drilling rod 5 all are provided with longitudinal hole, the delivery outlet of force (forcing) pump 8 is communicated with the top through hole of drilling rod 5 by feed pipe for mortar 7, the top of the bottom of drilling rod 5 and controlling platform 3 is oppositely arranged, the top of the bottom of controlling platform 3 and drilling cramp 4 is fixed, the top of driving-chain 6 is oppositely arranged with the cross bar on drilling cramp 4 tops respectively, the bottom of driving-chain 6 is oppositely arranged with the two ends, the left and right sides of controlling platform 3 respectively, motor 2 is fixed on the power transmission shaft of the top of drilling cramp 4 and motor 2 and driving-chain 6 and controlling platform 3 and is oppositely arranged, drill bit 1 is oppositely arranged with the bottom of controlling platform 3, the bottom of drilling cramp 4 is provided with model casing 10, and model casing 10 is positioned at the below of drill bit 1.
Full augers guarantees that the boring behind the pore-forming can not cause the phenomenons such as hole, distortion of collapsing because of the lateral pressure of soil, outside diameter is 5cm, cement mortar is pressed into pile in the boring by the intercommunicating pore of drill bit internal, the pressure of mud jacking is controlled at about 15.0-20.0kPa, can not be too fast in the process of pile for avoiding occurring speed that broken pile requires to promote drill bit, laboratory test was controlled at about 1.5-2.0cm/ minute, or rose by the anti-drill bit that pushes away of mud jacking.Weak soil stops up the cement mortar leadout hole of drill bit bottom when preventing to hole, and need keep an equilibrium pressure in the defeated slurry passage of drill bit internal during boring, and equilibrium pressure is generally 5.0-10.0kPa.d.) load plate test, control modulus stake and deformation design
Maintenance is 28 days behind the pile, and the former humidity that maintenance is banketed between curing time prevents water evaporates.The load plate test that control modulus stake maintenance can be correlated with after 28 days, as bearing capacity, side friction, stress ratio etc., bearing capacity with the checking composite foundation, adjust of the influence of the stiffness measuring different-stiffness pressing plate of pressing plate, can control the design and the composite foundation Deformation Control Design of modulus stake like this according to the theory of composite foundation to stress ratio.

Claims (1)

1. control modulus stake pile-forming equipment for one kind, it is characterized in that by drill bit (1), motor (2), controlling platform (3), drilling cramp (4), drilling rod (5), driving-chain (6), feed pipe for mortar (7), force (forcing) pump (8), model casing (10) is formed, wherein drill bit (1) and drilling rod (5) all are provided with longitudinal hole, the delivery outlet of force (forcing) pump (8) is communicated with the top through hole of drilling rod (5) by feed pipe for mortar (7), the top of the bottom of drilling rod (5) and controlling platform (3) is oppositely arranged, the top of the bottom of controlling platform (3) and drilling cramp (4) is fixed, the top of driving-chain (6) is oppositely arranged with the cross bar on drilling cramp (4) top respectively, the bottom of driving-chain (6) is oppositely arranged with the two ends, the left and right sides of controlling platform (3) respectively, motor (2) is fixed on the power transmission shaft of the top of drilling cramp (4) and motor (2) and driving-chain (6) and controlling platform (3) and is oppositely arranged, drill bit (1) is oppositely arranged with the bottom of controlling platform (3), the bottom of drilling cramp (4) is provided with model casing (10), and model casing (10) is positioned at the below of drill bit (1).
CNU2008202152969U 2008-12-09 2008-12-09 Control modulus pile formulation apparatus Expired - Lifetime CN201310101Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202152969U CN201310101Y (en) 2008-12-09 2008-12-09 Control modulus pile formulation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202152969U CN201310101Y (en) 2008-12-09 2008-12-09 Control modulus pile formulation apparatus

Publications (1)

Publication Number Publication Date
CN201310101Y true CN201310101Y (en) 2009-09-16

Family

ID=41107354

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202152969U Expired - Lifetime CN201310101Y (en) 2008-12-09 2008-12-09 Control modulus pile formulation apparatus

Country Status (1)

Country Link
CN (1) CN201310101Y (en)

Similar Documents

Publication Publication Date Title
KR100968656B1 (en) Apparatus and method for forming compacted piers with multiple lifts
CN102901676A (en) Vertical direct shear test device
KR101241705B1 (en) Method for tri-axial compression test of unsaturated soils and intermediate soils
CN109443954B (en) Multi-working condition torsion shear characteristic testing device and method for interface between pile or anchor and rock-soil body
CA2583608A1 (en) Drilling device and method for producing a drilling column in the soil
CN105352884A (en) Experiment method and experiment member for testing bond strength of concrete and coal, rock or concrete
EP3628782B1 (en) Method for producing a foundation element free of peak pressure
CN104374650A (en) Testing device and method for testing static force shear property between tubular pile and grouting soil body
CN106351585A (en) Hole collapse and shrinkage prevention bidirectional spiral extrusion and expansion drilling tool and construction technology thereof
CN101435209B (en) Pile-forming equipment and method of control modulus pile
CN202916155U (en) Vertical direct shear test device
CN201310101Y (en) Control modulus pile formulation apparatus
US3470701A (en) Means for making concrete piles
US8944184B2 (en) Suspension extraction device
CN106120717A (en) Control modulus stake band pressure balanced pile making method
CN116289472B (en) Pavement thickness detection device
CN100591854C (en) Construction method of non-soil squeezing pipe sinking filling pile and device
KR101719745B1 (en) Multi boring apparatus for changing tool
CN208748647U (en) The construction equipment of impact holing stake
US20150299976A1 (en) Method for manufacturing a pile
CN202092933U (en) Earth pressure cabin model device for earth improvement test in earth pressure balance shield construction
CN100585091C (en) Rotary squeezing filling pile and pile-forming method therefor
CN201851001U (en) Drilling machine for constructing piles with high bearing capacity
CN112730055B (en) Testing device and method for simulating drawing of deep soil layer constant-resistance soil anchor
CN110616702B (en) System and method for monitoring construction quality of compaction pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20090916

Effective date of abandoning: 20081209