CN201305433Y - Handling machine for bricks - Google Patents

Handling machine for bricks Download PDF

Info

Publication number
CN201305433Y
CN201305433Y CNU2008201399574U CN200820139957U CN201305433Y CN 201305433 Y CN201305433 Y CN 201305433Y CN U2008201399574 U CNU2008201399574 U CN U2008201399574U CN 200820139957 U CN200820139957 U CN 200820139957U CN 201305433 Y CN201305433 Y CN 201305433Y
Authority
CN
China
Prior art keywords
loader
unloader
telescopic boom
brick
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201399574U
Other languages
Chinese (zh)
Inventor
李新国
陈勇
张桂彬
张贺平
于景伟
章双林
孙瑞祥
孙洪侠
庞士军
王军旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUAN YONGFENG NORTH FORK JINGGONG ENGINEERING MACHINERY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008201399574U priority Critical patent/CN201305433Y/en
Application granted granted Critical
Publication of CN201305433Y publication Critical patent/CN201305433Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a handling machine for bricks, which relates to the field of transporting and handling machinery, is designed for transporting objects after lifting and casting off the restriction of ground. The handling machine for bricks comprises a handing machine body, traveling wheels are arranged below the handling machine body, a driving mechanism controlling the travel of the traveling wheels is arranged in the handling machine body, a primary telescopic boom is arranged at the rear part of the handling machine body, the primary telescopic boom extends above the front part of the handling machine body, a first manipulating device controlling the primary telescopic boom is arranged in the handling machine body, and a supporting arm supporting the primary telescopic boom is arranged between the front part of the handling machine body and the primary telescopic boom. The first manipulating device controls the primary telescopic boom to make the driving mechanism drive the traveling wheels to travel after the objects transported by the handling machine for bricks are lifted over the ground. The handling machine for bricks can be used for transporting and handling objects.

Description

The brick loader-unloader
Technical field
The utility model relates to a kind of handling and loading machinery, relates in particular to a kind of brick loader-unloader that is not subjected to the place restriction.
Background technology
The brick machine can a disposable steam-cured still brick, and a still brick is approximately 20000 polyliths, and these fragments of brick are in still after steam-cured the finishing, its entrucking need be transported to broad place temporarily deposits, or be sold to the user, behind the arrival destination, also need fragment of brick to be unloaded and pile up on the ground.If the use manual work is carried a still brick and need be equipped with employee 13 people, 2 hours times spent, handling efficiency is low, does not meet the requirement of modern industry automation.
For improving the efficient of carrying fragment of brick, generally use mechanical haulage equipment carrying fragment of brick, compare with a dead lift, adopt mechanical haulage equipment once can carry a large amount of fragments of brick, saved labour power.But adopt the process of mechanical haulage equipment carrying fragment of brick generally to be at present, use overhead traveling crane that fragment of brick is transported to another place from a place,, often be subjected to the restriction in place when therefore using overhead traveling crane carrying fragment of brick owing to set up the place that overhead traveling crane need be fixed.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of brick loader-unloader, transports after object can having been removed, and is not subjected to the restriction in place.
For solving the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of brick loader-unloader comprises the loader-unloader body, has road wheel at described loader-unloader body, is provided with the driver train of the described road wheel walking of control in described loader-unloader body; Be provided with main telescopic boom at described loader-unloader After-Body, described main telescopic boom extends to described loader-unloader front part of a body oblique upper, in described loader-unloader body, be provided with first operating control of the described main telescopic boom of control, between described loader-unloader front part of a body and described main telescopic boom, be provided with the hold-down arm that supports described main telescopic boom; Described first operating control control object that described main telescopic boom makes described brick carry with loader-unloader rise liftoff after, the described road wheel walking of described drive mechanism.
For described main telescopic boom can be stretched steadily, in described main telescopic boom, be provided with telescopic hydraulic cylinder.
As a kind of optimal way, described hold-down arm can be designed to telescopic supporting cylinder, in described loader-unloader body, be provided with second operating control of the described supporting cylinder of control simultaneously.
In order better to carry object, be provided with the clamping device of clamping object in the end that described main telescopic boom extends, described clamping device comprises two clamping limbs, between the upper end of described two clamping limbs, be provided with clamping hydraulic cylinder, be hinged with the pipe link that connects described two clamping limbs at the middle part of described two clamping limbs.
And, in described loader-unloader body, be provided with the 3rd operating control that the described clamping device of control clamps and unclamps.
Further, between the elongated end of described main telescopic boom and described clamping device, be provided with the sidesway hydraulic actuating cylinder that makes described clamping device sway, in described loader-unloader body, be provided with the 4th operating control of the described sidesway hydraulic actuating cylinder of control, finely tune with position to described clamping device.
For making described two clamping limb synchronization actions, between described two clamping limbs, be provided with and make described two synchronous devices that clamping limb clamps synchronously or unclamps.
As a kind of preferred version, described synchronous device comprises two pitch wheels that are located on the described pipe link, described gear that the position is close and described clamping limb are corresponding mutually, are provided with two connecting rod mechanisms between the top of mutual cooresponding described each gear and described each clamping limb.
And, be provided with two relative grip blocks rotationally in the inboard, bottom of described two clamping limbs, at the inboard of described two clamping limbs and be provided with two struts relatively on described two grip blocks, described two grip blocks are located on described two struts with gap by the perforation of its upper end.
And, have its clamped height regulating plate at described pipe link.
The brick loader-unloader that the utility model provides, have road wheel at its loader-unloader body, and in described loader-unloader body, also be provided with the driver train that drives described road wheel walking, be provided with main telescopic boom at the rear portion of described loader-unloader body, and in described loader-unloader body, be provided with first operating control of the described telescopic boom of control, because described main telescopic boom extends to the anterior oblique upper of described loader-unloader body, therefore between described loader-unloader front part of a body and described main telescopic boom, be provided with hold-down arm to support described main telescopic boom, controlling described main telescopic boom when described first operating control stretches, so that the object that described brick is carried with loader-unloader rise liftoff after, handle described driver train to drive described road wheel walking, thereby driving described brick walks together with the object of being carried with loader-unloader integral body, and described brick is not subjected to the restriction in place with the track of loader-unloader walking, can be with object transport to place far away.
Description of drawings
Fig. 1 is the integral structure figure of the utility model brick with loader-unloader and clamping device;
Fig. 2 is the front view of clamping device shown in Figure 1;
Fig. 3 is the left view of Fig. 2;
Fig. 4 is the body form scheme drawing with inclined side.
The specific embodiment
The utility model aims to provide a kind of brick loader-unloader, transports after object can having been removed, and is not subjected to the restriction in place.
Below in conjunction with accompanying drawing and embodiment the utility model is described in detail.
As shown in Figure 1, the brick loader-unloader of the utility model embodiment, comprise loader-unloader body 1, have two seniority among brothers and sisters travelling wheels 2 at loader-unloader body 1, in loader-unloader body 1, also be provided with the driver train of control road wheel 2 walkings, be provided with main telescopic boom 3 at the rear portion of loader-unloader body 1, main telescopic boom 3 extends to the oblique upper of loader-unloader body 1 front portion, the rear portion that lifting arm 3 is located at loader-unloader body 1 is moved after making the center of gravity of lifting arm 3, help guaranteeing the front and back stress balance of described brick with loader-unloader, in loader-unloader body 1, be provided with first operating control of the main telescopic boom 3 of control, between loader-unloader body 1 front portion and main telescopic boom 3, be provided with the hold-down arm 4 that supports main telescopic boom 3, controlling main telescopic boom 3 when first operating control stretches, so that the object that brick is carried with loader-unloader rise liftoff after, handle driver train with ground-engaging wheel 2 walkings, thereby driving described brick walks together with the object of being carried with loader-unloader integral body, and described brick is not subjected to the restriction in place with the track of loader-unloader walking, can be with object transport to place far away.
Because hydrostatic drive power is steady greatly, consider the weight of object that main telescopic boom need be carried, because in the present embodiment, described brick is mainly used in the carrying fragment of brick with loader-unloader, its once carrying amount can reach 4 tons, this needs very big hoisting force, but also to guarantee of the steady running of described brick with the loader-unloader car load, therefore according to hydraulicdriven these characteristics, in main telescopic boom 3, telescopic hydraulic cylinder 5 is set, simultaneously hydraulic actuating cylinder 5 has also enlarged the scope of work of main telescopic boom 3, and main telescopic boom 3 can be touched from described brick with loader-unloader object far away.At this moment, described first operating control comprises the hydraulic oil oil circuit and is located at various control cock on the oil circuit.
With object transport behind the destination, often need object is piled up from level to level, object is piled up highly more, just need main telescopic boom 3 to promote highly more, therefore, can promote De Genggao for making main telescopic boom 3, hold-down arm 4 is designed to a telescopic hydraulic actuating cylinder, along with the stretching out and withdraw of hold-down arm 4, main telescopic boom 3 can rise and descend, to adapt to the object that is positioned at the differing heights position.In loader-unloader body 1, also be provided with second operating control that control hold-down arm 4 stretches.
As can be seen from Figure 1, be provided with the clamping device 6 of clamping object at the free end of main telescopic boom 3.In conjunction with Fig. 2 and shown in Figure 3, clamping device 6 comprises left clamping limb 61 and right clamping limb 62, between the upper end of left clamping limb 61 and right clamping limb 62, be provided with two clamping hydraulic cylinders 63,63 1 of these two clamping hydraulic cylinders drive left clamping limb 61, another drives right clamping limb 62, middle part at left clamping limb 61 and right clamping limb 62 also is hinged with the pipe link 64 that is connected the two, and left clamping limb 61 and right clamping limb 62 can rotate around the hinged place, thereby realizes the clamping of clamping device 6 and unclamp.
For the clamping of control clamping device 6 with unclamp, in loader-unloader body 1, be provided with the 3rd operating control, the 3rd operating control comprises the hydraulic oil oil circuit and is located at various control cock on the oil circuit.
In the use of reality, when utilizing described brick with loader-unloader carrying object, not that the clamping device 6 and the position of object are adapted, if the two is incompatible, can control main telescopic boom 3 by described first operating control, clamping device 6 is moved forward and backward, but also can be by described second operating control control hold-down arm 4, clamping device 6 is moved up and down, in order to make the clamping device 6 can sway, between the elongated end of main telescopic boom 3 and clamping device 6, also be provided with sidesway hydraulic actuating cylinder (not shown), in loader-unloader body 1, be provided with the 4th operating control of the described sidesway hydraulic actuating cylinder of control simultaneously.
As shown in Figure 2, for making left clamping limb 61 and right clamping limb 62 can clamp or unclamp object simultaneously, between left clamping limb 61 and right clamping limb 62, be provided with synchronous device, as a kind of optimal way, in the present embodiment, described synchronous device is for being provided with two pitch wheels 611 between left clamping limb 61 and right clamping limb 62,621, gear 611 and gear 612 are identical, at gear 611,612 and the top of left clamping limb 61 and right clamping limb 62 between be provided with two connecting rod mechanisms, be specially, on gear 611, be fixed with fork 612, on gear 621, be fixed with fork 622, be connected with push rod 613, be connected with push rod 623 at the other end of fork 622 at the other end of fork 612, push rod 613 is connected with the top of left clamping limb 61, and push rod 623 is connected with the top of right clamping limb 62.
When the action earlier of left clamping limb 61, push rod 613 on it promotes fork 612 swings, fork 612 driven gears 611 rotate, thereby make gear 621 rotate, gear 621 drives fork 622 swings again, fork 622 drives push rod 623 again and promotes right clamping limb 62 actions, finally makes left clamping limb 61 and right clamping limb 62 synchronization actions.When the action earlier of right clamping limb 62, its course of action is with above-mentioned opposite.
Be provided with relative two grip blocks 65 that are provided with in the inboard, lower end of left clamping limb 61 and right clamping limb 62, grip block 65 links to each other with the lower end of left clamping limb 61 and right clamping limb 62 by pin 66, grip block 65 can rotate around pin 66, in the lower end of left clamping limb 61 and right clamping limb 62 inboard and on grip block 65 relative two struts 67 that are provided with, grip block 65 is located on the strut 67 with gap by the perforation of its upper end, as shown in Figure 4, when the object side facial contour of being carried slightly tilts, grip block 65 can be done minor rotation better fitting with object, thereby helps grip objects.
The utility model brick is mainly used to the handling and loading fragment of brick with loader-unloader, and once can carry a steam-cured car brick, and in the steam-cured car brick that present brick field is produced, what have is 10 layers, what have is 11 layers, it is highly different, for preventing that fragment of brick drops in the process of carrying, have its clamped height regulating plate 68 at pipe link 64, if be 11 layers of brick, then to regulating plate 68 be improved by the screw on the regulating plate 68, if be 10 layers of brick, then to regulating plate 68 be reduced, by regulating by the screw on the regulating plate 68, regulating plate 68 is pressed on the brick layer, in order to avoid fragment of brick drops in handling process.
The above; it only is the specific embodiment of the present utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; can expect easily changing or replacing, all should be encompassed within the protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the described protection domain of claim.

Claims (10)

1, a kind of brick loader-unloader comprises the loader-unloader body, has road wheel at described loader-unloader body, is provided with the driver train of the described road wheel walking of control in described loader-unloader body, it is characterized in that:
Be provided with main telescopic boom at described loader-unloader After-Body, described main telescopic boom extends to described loader-unloader front part of a body oblique upper, in described loader-unloader body, be provided with first operating control of the described main telescopic boom of control, between described loader-unloader front part of a body and described main telescopic boom, be provided with the hold-down arm that supports described main telescopic boom;
Described first operating control control object that described main telescopic boom makes described brick carry with loader-unloader rise liftoff after, the described road wheel walking of described drive mechanism.
2, brick loader-unloader according to claim 1 is characterized in that: be provided with telescopic hydraulic cylinder in described main telescopic boom.
3, brick loader-unloader according to claim 1 and 2 is characterized in that: described hold-down arm is telescopic supporting cylinder, is provided with second operating control of the described supporting cylinder of control in described loader-unloader body.
4, brick loader-unloader according to claim 3, it is characterized in that: the clamping device that is provided with the clamping object in the end that described main telescopic boom extends, described clamping device comprises two clamping limbs, between the upper end of described two clamping limbs, be provided with clamping hydraulic cylinder, be hinged with the pipe link that connects described two clamping limbs at the middle part of described two clamping limbs.
5, according to claim or 4 described brick loader-unloader, it is characterized in that: in described loader-unloader body, be provided with the 3rd operating control that the described clamping device of control clamps and unclamps.
6, brick loader-unloader according to claim 5, it is characterized in that: between the elongated end of described main telescopic boom and described clamping device, be provided with the sidesway hydraulic actuating cylinder that makes described clamping device sway, in described loader-unloader body, be provided with the 4th operating control of the described sidesway hydraulic actuating cylinder of control.
7, brick loader-unloader according to claim 6 is characterized in that: be provided with between described two clamping limbs and make described two synchronous devices that clamping limb clamps synchronously or unclamps.
8, brick loader-unloader according to claim 7, it is characterized in that: described synchronous device comprises two pitch wheels that are located on the described pipe link, described gear that the position is close and described clamping limb are corresponding mutually, are provided with two connecting rod mechanisms between the top of mutual cooresponding described each gear and described each clamping limb.
9, brick loader-unloader according to claim 8, it is characterized in that: be provided with two relative grip blocks rotationally in the inboard, bottom of described two clamping limbs, at the inboard of described two clamping limbs and be provided with two struts relatively on described two grip blocks, described two grip blocks are located on described two struts with gap by the perforation of its upper end.
10, brick loader-unloader according to claim 9 is characterized in that: have its clamped height regulating plate at described pipe link.
CNU2008201399574U 2008-10-21 2008-10-21 Handling machine for bricks Expired - Fee Related CN201305433Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201399574U CN201305433Y (en) 2008-10-21 2008-10-21 Handling machine for bricks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201399574U CN201305433Y (en) 2008-10-21 2008-10-21 Handling machine for bricks

Publications (1)

Publication Number Publication Date
CN201305433Y true CN201305433Y (en) 2009-09-09

Family

ID=41097898

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201399574U Expired - Fee Related CN201305433Y (en) 2008-10-21 2008-10-21 Handling machine for bricks

Country Status (1)

Country Link
CN (1) CN201305433Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104129740A (en) * 2014-08-01 2014-11-05 赵培龙 Brick holding device
CN106629139A (en) * 2016-11-24 2017-05-10 洪成珠 Holding clamp for brick-holding machine and automatic crane type brick-holding machine using holding clamp
CN106882537A (en) * 2017-04-24 2017-06-23 福建新源重工有限公司 A kind of brick fixture

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104129740A (en) * 2014-08-01 2014-11-05 赵培龙 Brick holding device
CN106629139A (en) * 2016-11-24 2017-05-10 洪成珠 Holding clamp for brick-holding machine and automatic crane type brick-holding machine using holding clamp
CN106629139B (en) * 2016-11-24 2019-12-03 洪成珠 Brick holding machine embraces folder and the automation running vehicle type brick holding machine using it
CN106882537A (en) * 2017-04-24 2017-06-23 福建新源重工有限公司 A kind of brick fixture

Similar Documents

Publication Publication Date Title
CN102134043B (en) Crawler hydraulic support assembling machine
CN107399691A (en) It is a kind of can wing drop blanking heavy construction materials in the tube clamping hoisting mechanism
CN201305433Y (en) Handling machine for bricks
CN206188320U (en) Crane
CN211594267U (en) PC coincide floor stacking machine
CN202518984U (en) Hydraulic double-linkage conveyer for baking-free brick
CN104773527A (en) Two-way chain bucket type layered fermentation pit discharging machine and working method thereof
CN210655866U (en) Locomotive turning device and locomotive gantry crane and container gantry crane thereof
CN205111859U (en) Laborsaving arm
CN203753838U (en) Brick arranging, stacking and loading all-in-one machine
CN216072862U (en) Heavy jack translation device for narrow space operation
CN201980887U (en) Crawler-type hydraulic-bracket crane trolley
CN115341420A (en) Combined sleeper replacement unit and operation method
CN108583404A (en) Cloud type rail carry vehicle
CN108726126A (en) Three dimensional unit pipeline system lifts beam transport vehicle
CN204643211U (en) Pond, a kind of Two-way Chain bucket type layering cellar for storing things discharging machine
CN212318014U (en) Open-close type inverted arch template and trestle with inverted arch template
CN2507903Y (en) Fore-and-aft self-extension nose girder bridging machine
CN208560672U (en) Three dimensional unit pipeline system lifts beam transport vehicle
CN2630262Y (en) Slag-removing mechanism with linear motion-path crab bucket
CN203319089U (en) Small rubbish loading and unloading transport vehicle
CN106270418A (en) A kind of running vehicle type three-dimensional flow coat closing machine tool hands
CN204875395U (en) Receive pillow device
CN206407840U (en) Suspension crane trailer
CN201770426U (en) Cab lifting device of crawler-type hydraulic steel grabbing machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GU'AN YONGFENG BEICHA JINGGONG ENGINEERING MACHINE

Free format text: FORMER OWNER: LI XINGUO

Effective date: 20120314

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120314

Address after: 065500 No. 1, Yongfeng street, Guan County, Hebei Province

Patentee after: GUAN YONGFENG NORTH FORK JINGGONG ENGINEERING MACHINERY CO., LTD.

Address before: 065500 No. 1, Yongfeng street, Guan County, Hebei Province

Patentee before: Li Xinguo

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090909

Termination date: 20151021

EXPY Termination of patent right or utility model