CN201293548Y - Highly effective energy-conserving tunnel kiln - Google Patents
Highly effective energy-conserving tunnel kiln Download PDFInfo
- Publication number
- CN201293548Y CN201293548Y CNU2008201860791U CN200820186079U CN201293548Y CN 201293548 Y CN201293548 Y CN 201293548Y CN U2008201860791 U CNU2008201860791 U CN U2008201860791U CN 200820186079 U CN200820186079 U CN 200820186079U CN 201293548 Y CN201293548 Y CN 201293548Y
- Authority
- CN
- China
- Prior art keywords
- kiln
- chamber
- brick
- sides
- ventilating duct
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Furnace Details (AREA)
Abstract
The utility model relates to a high-efficient energy-saving tunnel kiln, including a roasting kiln and a drying chamber, which is characterized in that the roasting kiln includes a reinforced concrete foundation, a kiln crown, a kiln body, a ventilation tunnel and kiln doors, wherein, the differential arc kiln crown is composed of a top board, a lining and a heat exchange cavity, the roasting belt lining is composed of a masonry layer, a thermal insulating layer and an arch guard layer, the preheating zone and the cooling zone lining is respectively composed of a masonry layer and an arch guard layer, brick ventilation tunnels are respectively provided on both sides of the kiln body, two kiln doors are mounted on the kiln body mouth, a preformed chamber is provided between the two kiln doors; the drying chamber includes a chamber roof, a chamber body, a ventilation tunnel and import and export doors, the chamber roof includes a flat top board, a top panel and a heat exchange cavity, two brick ventilation tunnels are respectively provided on both sides of the chamber body, and a heat-extraction blower fan which is communicated to the roasting kiln through a heat-extraction air tube is installed on the top of the chamber body. The roasting kiln of the utility model has a kiln section width of 2.5M-4.6M, good thermal properties, small temperature difference, long life, good product quality, high output, low heat consumption, simple kiln body structure, low cost, and integrated advantages of the semi-circular arch, basket handle arch top tunnel kiln and flat top tunnel kiln.
Description
Technical field
The utility model relates to a kind of energy-efficient tunnel cave.
Technical background
The heavy clay industry tunnel cave of China is used existing decades of history, develops into the flat-top tunnel cave of big or middle section from semicircle vault, three-core vault tunnel cave, and its thermal property is progressively improved, but its cost also constantly increases.Though semicircle vault and three-core vault tunnel cave are simple in structure, the life-span is long, exists kiln body upper and lower temperature difference big, and is big and utilization rate is low between the kiln head space, setting inconvenience, shortcoming such as heat-energy losses is big, and product quality variance is big.Though and the flat-top tunnel cave has a narrow range of temperature, the space availability ratio height is easy to mechanical setting, and product quality is better, and hear rate is also less, complex structure, and the life-span is shorter, the cost height.
The utility model content
The purpose of this utility model is at existing problem, provide a kind of differential of the arc type kiln top to people, promptly the kiln section width of calcining kiln is 2.5M~4.6M, and thermal property is better, have a narrow range of temperature, life-span is long, good product quality, output height, hear rate is low, kiln structure is simple, and cost is low, integrates the energy-efficient tunnel cave of the advantage of semicircular arch, basket handle arch vault tunnel cave and flat-top tunnel cave.
The utility model comprises calcining kiln and hothouse, it is characterized in that:
A, calcining kiln comprises reinforced concrete base, the kiln top, the kiln body, ventilating duct and wicket, differential of the arc type kiln top is by top board, heat-insulation chamber between masonry and top board and masonry is formed, the roasting band masonry of kiln body is by the brick layer of building of following refractory arch, middle thermal insulation layer and top employing standard brick or coal gangue sintering porous brick, the arch layer that protects that hollow brick is built by laying bricks or stones constitutes, the preheating zone of kiln body, the salband masonry is by brick layer and top employing standard brick or the coal gangue sintering porous brick built of following refractory arch, the arch layer that protects that hollow brick is built by laying bricks or stones constitutes, place the kiln body both sides on the reinforced concrete base to be respectively equipped with brick ventilating duct, kiln body entrance point is equipped with the twice wicket, is provided with one between the twice wicket and reserves the chamber;
B, top, the hothouse chamber of comprising, chamber body, ventilating duct and import and export door, the top, chamber comprises the heat exchanging chamber composition between ceiling, top panel and ceiling, top panel, place the body both sides, chamber on the reinforced concrete base to be respectively equipped with brick ventilating duct, body top, chamber is equipped with one and is taken out air-heater and be communicated with calcining kiln by taking out warm-air pipe.
The kiln section width of calcining kiln is 2.5M~4.6M, be provided with temperature tube in the calcining kiln, the front portion is the preheating zone in the calcining kiln, the middle part is the roasting band, the rear portion is a salband, have coal feeding hole on the kiln top of calcining kiln roasting band, kiln body entrance point, preheating zone, salband both sides are equipped with the sand tube that adds of logical inboard from top to bottom respectively.
The masonry both sides are cast with the reinforced concrete longeron and are cast with the equidistant reinforced concrete vertical beam of a row, and reinforced concrete vertical beam lower end is connected with the kiln reinforced concrete base, and the upper end adopts the banded column lacing wire to connect.
The ventilating duct top of calcining kiln is equipped with an airway plate, have the air port on the ventilating duct of both sides in the kiln body, the air port that feeds preheating zone, salband two side lower parts in the air port of preheating zone in the calcining kiln, the air port that feeds roasting band in the calcining kiln, the feeding calcining kiln is equipped with alternating temperature regulator, roasting regulator, temperature control regulator respectively, and strong air-cooler is equipped with in the calcining kiln outlet.。
The ventilating duct top of hothouse is equipped with airway plate, it is middle certainly to gradually little air port, both sides to have a row in the kiln body on the ventilating duct of both sides, moisture-eliminating blower is equipped with at hothouse entrance point top, and hothouse entrance point and both sides, kiln body stage casing are equipped with the sand tube that adds of logical inboard from top to bottom respectively.
During use, when kiln car to be baked bricks being housed entering the kiln body on differential of the arc type kiln top, the first road wicket rises automatically, kiln car enters by the import hauling machine and reserves the chamber, after the first road wicket fell automatically, the second road wicket rose automatically, preset to reserve indoor kiln car and automatically kiln car is ejected by kiln car pusher and reserve the chamber and enter differential of the arc top kiln body, kiln car pusher automatically resets, and the second road wicket falls automatically.Kiln car enters and enters the preheating zone behind the kiln body and enter the roasting band again, because strong air-cooler is equipped with in the calcining kiln outlet, cold wind is sent into by brick air channel, body both sides, chamber, and brick body waste heat is blown into the roasting band when before kiln car continues, being advanced into salband, both, replenished oxygen to the roasting band again with UTILIZATION OF VESIDUAL HEAT IN.The high-temperature flue gas of roasting band burning advances backward, reached to after the adobe of coming in carry out preheating, after-heat enters hothouse by taking out air-heater.Because of not being sucks from atmosphere by wind circulation nature separately, but machinery is supplied with by force, thereby make the interior firing temperature of kiln even, firing period shortens, and can avoid the black core brick that occurs because of kiln temperature is inhomogeneous, energy-conservation, efficient, the advantage of burning till fast of having guaranteed therefore that this tunnel cave has.Because of the ventilating duct top of hothouse both sides is equipped with airway plate, it is middle certainly to gradually little air port, both sides that ventilating duct has a row, thereby change air supply mode into the side air-supply by the top air-supply of generally adopting, moisture-eliminating blower is equipped with at hothouse entrance point top, because hot gas is sent under two inboards, chamber,, avoided because of moisture regain causes the collapse generation of phenomenon of base substrate by the blower fan humidity discharging from the top, firing chamber, the body drying effect obviously improves.
Effect of the present utility model
1, the utility model has adopted differential of the arc type kiln top, and promptly calcining kiln internal diameter width is 2.5M ~ 4.6M, and the twice wicket is equipped with in the import of kiln body, be provided with one between the twice wicket and reserve the chamber, calcining kiln, hothouse all have brick ventilating duct simultaneously, and strong air-cooler is equipped with at calcining kiln port of export top again, moisture-eliminating blower is equipped with at hothouse entrance point top, hothouse port of export top is equipped with and is taken out air-heater, thereby thermal property is better, has a narrow range of temperature, life-span is long, good product quality, the output height, hear rate is low.
2, the utility model kiln structure is simple, and cost is low, is beneficial to popularization.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the calcining kiln structural representation.
Fig. 3 is the calcining kiln cutaway view.
Fig. 4 is the drying chamber structure schematic diagram.
Fig. 5 is the hothouse cutaway view.
The specific embodiment
Embodiment 1:
Comprise calcining kiln 1 and hothouse 2 referring to figure (1~5), calcining kiln 1 comprises reinforced concrete base 3, kiln top 4, kiln body 5, ventilating duct 6-1 and wicket 7, differential of the arc type kiln top is by top board 8, heat exchanging chamber 10-1 between masonry 9 and top board and masonry forms, the roasting band masonry 9 of kiln body is by the brick layer 11 of building of following refractory arch, middle thermal insulation layer 12 and top employing standard brick or coal gangue sintering porous brick, the arch layer 13 that protects that hollow brick is built by laying bricks or stones constitutes, the preheating zone of kiln body, the salband masonry is by brick layer and top employing standard brick or the coal gangue sintering porous brick built of following refractory arch, the arch layer that protects that hollow brick is built by laying bricks or stones constitutes, place the kiln body both sides on the reinforced concrete base 3 to be respectively equipped with brick ventilating duct 6-1, kiln body mouth is equipped with twice wicket 7, is provided with one between the twice wicket and reserves the chamber; Top, the hothouse chambers of comprising 2 14, chamber body 15, ventilating duct 6-2 and import and export door 16, top, chamber 14 comprises that the heat exchanging chamber 10-2 between ceiling 17, top panel 18 and ceiling, top panel forms, place the body both sides, chamber on the reinforced concrete base 3 to be respectively equipped with brick ventilating duct 6-2, body top, chamber is equipped with one and is taken out air-heater 20 by what take out that warm-air pipe 19 is communicated with calcining kiln.Calcining kiln internal diameter width is 2.5M~4.6M, be provided with temperature tube 21 in the calcining kiln, the front portion is the preheating zone in the calcining kiln, the middle part is the roasting band, the rear portion is a salband, the kiln of calcining kiln roasting band has coal feeding hole 22 on the top, and entrance point, preheating zone, salband are equipped with the logical inboard sand tube 23 that adds from top to bottom.The masonry both sides are cast with reinforced concrete longeron 24 and are cast with the equidistant reinforced concrete vertical beam 25 of a row, and reinforced concrete vertical beam lower end is connected with kiln reinforced concrete base 3 plinth, and the upper end adopts banded column lacing wire 26 to connect.The ventilating duct 6-1 top of calcining kiln is equipped with an airway plate 27-1, have air port 28 on the ventilating duct, the air port that feeds preheating zone, salband two side lower parts in the air port of preheating zone in the calcining kiln, the air port that feeds roasting band in the calcining kiln, the feeding calcining kiln is equipped with alternating temperature regulator 29, roasting regulator 30 and temperature control regulator 31 respectively, and strong air-cooler 32 is equipped with in the calcining kiln outlet.The ventilating duct 6-2 top of hothouse is equipped with an airway plate 27-2, and the centre is to gradually little air port 28, both sides certainly to have a row on the ventilating duct, and moisture-eliminating blower 33 is equipped with at hothouse entrance point top.
Claims (5)
1, a kind of energy-efficient tunnel cave comprises calcining kiln and hothouse, it is characterized in that:
A, calcining kiln comprises reinforced concrete base, the kiln top, the kiln body, ventilating duct and wicket, differential of the arc type kiln top is by top board, heat-insulation chamber between masonry and top board and masonry is formed, the roasting band masonry of kiln body is by the brick layer of building of following refractory arch, middle thermal insulation layer and top employing standard brick or coal gangue sintering porous brick, the arch layer that protects that hollow brick is built by laying bricks or stones constitutes, the preheating zone of kiln body, the salband masonry is by brick layer and top employing standard brick or the coal gangue sintering porous brick built of following refractory arch, the arch layer that protects that hollow brick is built by laying bricks or stones constitutes, place the kiln body both sides on the reinforced concrete base to be respectively equipped with brick ventilating duct, kiln body entrance point is equipped with the twice wicket, is provided with one between the twice wicket and reserves the chamber;
B, top, the hothouse chamber of comprising, chamber body, ventilating duct and import and export door, the top, chamber comprises the heat exchanging chamber composition between ceiling, top panel and ceiling, top panel, place the body both sides, chamber on the reinforced concrete base to be respectively equipped with brick ventilating duct, body top, chamber is equipped with one and is taken out air-heater and be communicated with calcining kiln by taking out warm-air pipe.
2, tunnel cave according to claim 1, it is characterized in that: the kiln section width of calcining kiln is 2.5M~4.6M, be provided with temperature tube in the calcining kiln, the front portion is the preheating zone in the calcining kiln, the middle part is the roasting band, the rear portion is a salband, has coal feeding hole on the kiln top of calcining kiln roasting band, and kiln body entrance point, preheating zone, salband both sides are equipped with the sand tube that adds of logical inboard from top to bottom respectively.
3, tunnel cave according to claim 1 is characterized in that: the masonry both sides are cast with the reinforced concrete longeron and are cast with the equidistant reinforced concrete vertical beam of a row, and reinforced concrete vertical beam lower end is connected with the kiln reinforced concrete base, and the upper end adopts the banded column lacing wire to connect.
4, tunnel cave according to claim 1, it is characterized in that: the ventilating duct top of calcining kiln is equipped with an airway plate, have the air port on the ventilating duct of both sides in the kiln body, the air port that feeds preheating zone, salband two side lower parts in the air port of preheating zone in the calcining kiln, the air port that feeds roasting band in the calcining kiln, the feeding calcining kiln is equipped with alternating temperature regulator, roasting regulator, temperature control regulator respectively, and strong air-cooler is equipped with in the calcining kiln outlet.
5, tunnel cave according to claim 1, it is characterized in that: the ventilating duct top of hothouse is equipped with airway plate, it is middle certainly to gradually little air port, both sides to have a row in the kiln body on the ventilating duct of both sides, moisture-eliminating blower is equipped with at hothouse entrance point top, and hothouse entrance point and both sides, kiln body stage casing are equipped with the sand tube that adds of logical inboard from top to bottom respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201860791U CN201293548Y (en) | 2008-10-15 | 2008-10-15 | Highly effective energy-conserving tunnel kiln |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201860791U CN201293548Y (en) | 2008-10-15 | 2008-10-15 | Highly effective energy-conserving tunnel kiln |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201293548Y true CN201293548Y (en) | 2009-08-19 |
Family
ID=41007029
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201860791U Expired - Fee Related CN201293548Y (en) | 2008-10-15 | 2008-10-15 | Highly effective energy-conserving tunnel kiln |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201293548Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101963454A (en) * | 2010-10-09 | 2011-02-02 | 柳丹 | Drying passage for external tile roller kiln |
CN101963453A (en) * | 2010-10-09 | 2011-02-02 | 柳丹 | Drying channel for inner wall tile bisque firing roller kiln |
CN102032775A (en) * | 2010-11-26 | 2011-04-27 | 王宏伟 | High-yield efficient tunnel kiln |
CN103423992A (en) * | 2013-08-29 | 2013-12-04 | 郑州鹏泰高新建材制品有限公司 | Energy-saving tunnel kiln used for gangue sintered brick production |
CN103629925A (en) * | 2012-08-27 | 2014-03-12 | 巨野县大鹏窑炉有限公司 | Assembled type tunnel kiln |
CN104457228A (en) * | 2014-11-25 | 2015-03-25 | 安徽省鸿福新型建材科技有限公司 | Tenon type composite flat-top tunnel kiln |
-
2008
- 2008-10-15 CN CNU2008201860791U patent/CN201293548Y/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101963454A (en) * | 2010-10-09 | 2011-02-02 | 柳丹 | Drying passage for external tile roller kiln |
CN101963453A (en) * | 2010-10-09 | 2011-02-02 | 柳丹 | Drying channel for inner wall tile bisque firing roller kiln |
CN101963453B (en) * | 2010-10-09 | 2012-05-30 | 广东中窑窑业股份有限公司 | Drying channel for inner wall tile bisque firing roller kiln |
CN101963454B (en) * | 2010-10-09 | 2012-06-13 | 广东中窑窑业股份有限公司 | Drying passage for external tile roller kiln |
CN102032775A (en) * | 2010-11-26 | 2011-04-27 | 王宏伟 | High-yield efficient tunnel kiln |
CN103629925A (en) * | 2012-08-27 | 2014-03-12 | 巨野县大鹏窑炉有限公司 | Assembled type tunnel kiln |
CN103423992A (en) * | 2013-08-29 | 2013-12-04 | 郑州鹏泰高新建材制品有限公司 | Energy-saving tunnel kiln used for gangue sintered brick production |
CN104457228A (en) * | 2014-11-25 | 2015-03-25 | 安徽省鸿福新型建材科技有限公司 | Tenon type composite flat-top tunnel kiln |
CN104457228B (en) * | 2014-11-25 | 2017-01-25 | 安徽省鸿福新型建材科技有限公司 | Tenon type composite flat-top tunnel kiln |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201293548Y (en) | Highly effective energy-conserving tunnel kiln | |
CN202420154U (en) | Energy-saving tunnel kiln | |
CN201440025U (en) | Self-circulation drying equipment of high-moisture extrusion brick | |
CN202869211U (en) | Multi-channel direct-firing tunnel kiln and waste heat recycling utilizing system thereof | |
CN201514103U (en) | One time palletizing burning tunnel kiln of side wall ventilation system | |
CN203518564U (en) | Novel environment-friendly rotary energy-saving kiln | |
CN106082971A (en) | Gangue shale clinker bricks production system | |
CN201285219Y (en) | High-efficiency tunnel kiln | |
CN104457228B (en) | Tenon type composite flat-top tunnel kiln | |
CN102778126B (en) | One-time palletizing-burning tunnel kiln | |
CN201251349Y (en) | Drying apparatus used for wood floor production | |
CN201203349Y (en) | Multichannel energy-saving kiln | |
CN105973007B (en) | A kind of furnace equipment and the method using its making fired brick | |
CN202420155U (en) | High-efficiency micro-arch crowned tunnel kiln | |
CN203928710U (en) | A kind of large section firing bricks with industrial wastes tunnel cave | |
CN210180150U (en) | Environment-friendly tunnel cave | |
CN206656594U (en) | A kind of tunnel cave electric heater unit | |
CN201772737U (en) | Biscuit firing roller kiln for producing interior wall tile | |
CN107486931A (en) | A kind of duplex shale green bricks drying system | |
CN201697460U (en) | Self-firing high-efficiency energy-saving annular kiln | |
CN214747309U (en) | Smoke-water separation tunnel kiln | |
CN201081525Y (en) | Power-saving air down-flow dense oven chamber | |
CN107486934A (en) | A kind of shale green bricks drying system | |
CN201166517Y (en) | Calcination tile tunnel kiln | |
CN201021872Y (en) | A tile stove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090819 Termination date: 20131015 |