CN201270383Y - Auxiliary installation apparatus for outdoor switch cabinet electromagnetic operating mechanism - Google Patents

Auxiliary installation apparatus for outdoor switch cabinet electromagnetic operating mechanism Download PDF

Info

Publication number
CN201270383Y
CN201270383Y CNU2008201604193U CN200820160419U CN201270383Y CN 201270383 Y CN201270383 Y CN 201270383Y CN U2008201604193 U CNU2008201604193 U CN U2008201604193U CN 200820160419 U CN200820160419 U CN 200820160419U CN 201270383 Y CN201270383 Y CN 201270383Y
Authority
CN
China
Prior art keywords
fastening
operating mechanism
electromagnetic operating
base
upper platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008201604193U
Other languages
Chinese (zh)
Inventor
曹学刚
顾巍
周俊辉
范育明
赵井和
张婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANYUN POWER SUPPLY Co OF JIANGSU ELECTRIC POWER CO
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Lianyungang Power Supply Co of Jiangsu Electric Power Co
Original Assignee
GUANYUN POWER SUPPLY Co OF JIANGSU ELECTRIC POWER CO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANYUN POWER SUPPLY Co OF JIANGSU ELECTRIC POWER CO filed Critical GUANYUN POWER SUPPLY Co OF JIANGSU ELECTRIC POWER CO
Priority to CNU2008201604193U priority Critical patent/CN201270383Y/en
Application granted granted Critical
Publication of CN201270383Y publication Critical patent/CN201270383Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

An auxiliary installation device of an indoor switch cabinet electromagnetic operating mechanism is provided, which is provided with a base and an upper platform, wherein a lifting device is arranged between the base and the upper platform, a bottom board is arranged on the base, a level gauze is arranged on the upper surface of the bottom board, wheels are arranged on the lower surface of the bottom board, and at least three adjusting legs for adjusting the horizon are arranged on the lower surface of the bottom board, and an electromagnetic operating mechanism fastening component is arranged on the upper platform. The electromagnetic operating mechanism fastening component comprises two fastening bodies, wherein sliding rails are arranged on the upper platform, the two fastening bodies are installed on the sliding rails in a sliding way, foam cushions are arranged on opposite bayonets of the two fastening bodies, and the two fastening bodies are connected through two parallel fastening bolts. The fine adjustment for a box body can be finished through the sliding of the fastening component on the upper platform along the sliding rails, thereby assuring the precision connections of components. The adjustment of each component for installation and maintenance is convenient under the assistant of the device, the connection is easy, time-saving and labor saving, and has high efficiency, and the motion flexibility and the service life of a breaker are beneficially assured.

Description

The auxiliary installation device of indoor switch cubicle electromagnetic operating mechanism
Technical field
The utility model relates to the aid that maintenance is installed in a kind of electric power system, particularly a kind of auxiliary installation device of indoor switch cubicle electromagnetism CD10 type operating mechanism.
Background technology
At present, in electric power system 35kV~110kV electric substation, 10kV GG1A switch cubicle is used very general, the installation of every switch cubicle, maintenance all relate to this mechanism, because its installation accuracy requires high, Heavy Weight, add that place, indoor switch gear room is comparatively narrow, therefore, in electric substation's construction, install, overhaul CD10 type electromagnetic operating mechanism and often make the staff feel headache.During installation, mechanism case that need 50kg is heavy, interior dress breaker operator drive disk assembly is moved away from ground by two staff's both hands, after being raised to the installation site, the level height, level that need adjust casing be direction all around, so that guaranteeing the interior circuit breaker drive link of electromagnetic operating mechanism main shaft and switch cubicle cooperates fully, casing could be fixed then, otherwise, can cause the dislocation of drive disk assemblies such as the bearing of drive link and connecting lever, switch jam, a series of bad phenomenon of refusing to grade occur, thereby influence the safe and stable operation of equipment, electrical network.Existing installation, repair method are: without any specific purpose tool, need artificial earlier casing is raised (about liftoff approximately 500mm), carry out levelness, the adjustment of distance all around then, with screw mechanism is fixed on the switch cubicle at last, this method inefficiency that not only wastes time and energy, and the accuracy of parts butt joint is difficult to be guaranteed, cause the time-consuming of installation, maintenance, the required precision of installing, overhauling can not be satisfied the higher acceptance criteria of electric installation, influences the flexibility and the useful life of mechanism especially; Also there are undesirable elements such as construction means is comparatively original, erecting tools is simple and crude in the course of the work, directly have influence on safety and production.
Summary of the invention
The technical problems to be solved in the utility model is at the deficiencies in the prior art, has proposed a kind of auxiliary installation device of indoor switch cubicle electromagnetic operating mechanism.Electromagnetic mechanism is installed, each parts of maintenance mechanism are easy to adjust down the auxiliary of this device, connect easy, time saving and energy saving, efficient is high.
The technical problems to be solved in the utility model is achieved through the following technical solutions, a kind of auxiliary installation device of indoor switch cubicle electromagnetic operating mechanism, be characterized in: be provided with base and upper mounting plate, between base and upper mounting plate, be provided with lowering or hoisting gear, described base is provided with base plate, is provided with level meter on base plate, and wheel is housed below base plate, and at least three adjusting supporting legs that are used for the adjusting level are housed below base plate, upper mounting plate is provided with the electromagnetic operating mechanism fastening assembly.
The technical problems to be solved in the utility model can also come further to realize by the following technical programs, the electromagnetic operating mechanism fastening assembly comprises two fastening bodies, on upper mounting plate, be provided with slide rail, being contained on the slide rail of two fastening body slips, be provided with airfoam cushion in the relative bayonet socket of two fastening bodies, connect by two parallel fastening bolts between two fastening bodies.
The utility model compared with prior art, with the oscilaltion of lowering or hoisting gear realization to switch electromagnetic operating mechanism casing, by level meter adjusting device level, finish fine setting by fastening assembly in the slip of upper mounting plate upper edge slide rail, thereby guarantee the accurate connection of each parts casing.It is easy to adjust to install, overhaul each parts down this device auxiliary, connect easy, time saving and energy saving, efficient is high, help guaranteeing the dexterity of action of circuit breaker and just use the life-span.Filled up the blank of the special-purpose mounting auxiliary that does not also have CD10 type switch electromagnetic operating mechanism so far.
Description of drawings
Fig. 1 is a structure diagram of the present utility model.
Fig. 2 is the attached TV structure figure of fastening assembly.
Embodiment
A kind of auxiliary installation device of indoor switch cubicle electromagnetic operating mechanism, be provided with base 7 and upper mounting plate 1, between base 7 and upper mounting plate 1, be provided with lowering or hoisting gear 4, described base 7 is provided with base plate, on base plate, be provided with level meter 8, wheel 5 is housed below base plate, and at least three adjusting supporting legs 6 that are used for the adjusting level are housed below base plate, upper mounting plate 1 is provided with electromagnetic operating mechanism fastening assembly 2.Wheel 5 is fixed on the base plate lower end, can make things convenient for whole device to move; Base plate has four tapped through holes for four jiaos, regulate supporting leg 6 and be made up of screw rod and spike, the screw rod lower end is that sphere cooperates with spike, can conveniently support when the out-of-flatness of ground, screw rod matches with through hole whorl, regulates the supporting leg height and the eye-level instrument makes whole device level by the screw rod that rotates four jiaos.
Electromagnetic operating mechanism fastening assembly 2 comprises two fastening bodies 10, on upper mounting plate 1, be provided with two parallel one slide rails 3, being contained on the slide rail 3 of two fastening body 10 slips, be provided with airfoam cushion 9 in the relative bayonet socket of two fastening bodies 10, airfoam cushion 9 is sticked on the bayonet socket place of fastening body by glue, at two of slide rail 3 the location non-magnetic shim is arranged, prevent that fastening assembly from skidding off; Airfoam cushion 9 make electromagnetic mechanism when fastened stressed evenly, protect electromagnetic mechanism to avoid when mounted contacting simultaneously and damage with ironware; Connect by two parallel fastening bolts 11 between two fastening bodies 10.Fastening bolt 11 is two screw rods, is provided with four bar covers that match at the two ends of two screw rods, realizes the fastening of electromagnetic mechanism and loosens by bar cover adjusting screw(rod) length.
Lowering or hoisting gear 4 is made up of a jack, and jack lower end and base are fixedly connected, and the jack upper end is fixedly connected with platform substrate lower plane middle part; Jack is provided with screw rod, and the threads engaged in screw rod and jack joint is by the lifting of rotating screw bolt adjusting screw(rod) length control jack.

Claims (2)

1. the auxiliary installation device of an indoor switch cubicle electromagnetic operating mechanism, it is characterized in that: be provided with base (7) and upper mounting plate (1), between base (7) and upper mounting plate (1), be provided with lowering or hoisting gear (4), described base (7) is provided with base plate, on base plate, be provided with level meter (8), wheel (5) is housed below base plate, and at least three adjusting supporting legs (6) that are used for the adjusting level are housed below base plate, upper mounting plate (1) is provided with electromagnetic operating mechanism fastening assembly (2).
2. the auxiliary installation device of indoor switch cubicle electromagnetic operating mechanism according to claim 1, it is characterized in that: electromagnetic operating mechanism fastening assembly (2) comprises two fastening bodies (10), (1) is provided with slide rail (3) on upper mounting plate, what two fastening bodies (10) slided is contained on the slide rail (3), be provided with airfoam cushion (9) in the relative bayonet socket of two fastening bodies (10), connect by two parallel fastening bolts (11) between two fastening bodies (10).
CNU2008201604193U 2008-09-19 2008-09-19 Auxiliary installation apparatus for outdoor switch cabinet electromagnetic operating mechanism Expired - Lifetime CN201270383Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201604193U CN201270383Y (en) 2008-09-19 2008-09-19 Auxiliary installation apparatus for outdoor switch cabinet electromagnetic operating mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201604193U CN201270383Y (en) 2008-09-19 2008-09-19 Auxiliary installation apparatus for outdoor switch cabinet electromagnetic operating mechanism

Publications (1)

Publication Number Publication Date
CN201270383Y true CN201270383Y (en) 2009-07-08

Family

ID=40842993

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201604193U Expired - Lifetime CN201270383Y (en) 2008-09-19 2008-09-19 Auxiliary installation apparatus for outdoor switch cabinet electromagnetic operating mechanism

Country Status (1)

Country Link
CN (1) CN201270383Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102975030A (en) * 2011-09-07 2013-03-20 陈玉争 Magnetic workbench
CN111348586A (en) * 2020-03-26 2020-06-30 湖南斯德克智能科技有限公司 Low-voltage circuit breaker maintenance handcart

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102975030A (en) * 2011-09-07 2013-03-20 陈玉争 Magnetic workbench
CN102975030B (en) * 2011-09-07 2015-07-29 陈玉争 Magnetic working table
CN111348586A (en) * 2020-03-26 2020-06-30 湖南斯德克智能科技有限公司 Low-voltage circuit breaker maintenance handcart

Similar Documents

Publication Publication Date Title
CN105281174B (en) Aerial high-voltage equipment ground bar aids in assembly and disassembly system
CN102996062B (en) Maintenance lifting platform and application method thereof
CN202004346U (en) Adjustable installation platform for motor driven operating mechanism case
CN200997341Y (en) Installation aid of large-power supply isolated switch operating mechanism
CN106941247A (en) A kind of electric power apparatus examination device
CN201270383Y (en) Auxiliary installation apparatus for outdoor switch cabinet electromagnetic operating mechanism
CN201629509U (en) Regulating device for installation of disconnector control boxes
CN205051219U (en) Supplementary device of installing and removing of high pressure substation equipment ground connection
CN105301459B (en) High pressure industrial frequency AC pressurized system measuring table
CN201302897Y (en) Replacement device of transformer oil pump
CN210709354U (en) Tool for quickly and efficiently replacing carrier roller of belt conveyor
CN201255693Y (en) Adjustable detachable rail table experiment bench
CN208182540U (en) A kind of fast-assembling hoistable platform of electric power network X-ray production apparatus
CN102518593B (en) Improved large-size centrifugal fan device and mounting and constructing method thereof
CN205263244U (en) Novel high pressure industry frequency alternate current pressurized system measuring platform
CN102231483A (en) Hydraulic maintenance tool car
CN202906257U (en) Mobile workbench for mounting transformer station isolation switch
CN204248869U (en) A kind of head repairing auxiliary device of flat machine
CN103293452A (en) Withstand voltage testing apparatus for insulated ladders
CN203312094U (en) Screw-driving and guide-sleeve-steering accurate installation platform of switch operating mechanism
CN109353374B (en) Reloading mobile platform and method
CN202633787U (en) Current transformer installation maintenance platform
CN208374662U (en) A kind of workbench
CN207010040U (en) High-tension switch cabinet implement
CN215801863U (en) Quick leveling device of basic channel-section steel subassembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LIANYUNGANG POWER SUPPLY COMPANY OF JIANGSU ELECTR

Effective date: 20130208

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130208

Address after: 222200, No. 1, Tongyu Road, Yi Zhou Town, Guanyun County, Lianyungang, Jiangsu

Patentee after: Guanyun Power Supply Company of Jiangsu Electric Power Co.

Patentee after: Lianyungang Power Supply Company of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 222200 No. 1, Tongyu Road, Yi Zhou Town, Guanyun County, Jiangsu

Patentee before: Guanyun Power Supply Company of Jiangsu Electric Power Co.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20090708