CN201266689Y - 220kv and 66kv ground wire hanging insulated operating lever - Google Patents

220kv and 66kv ground wire hanging insulated operating lever Download PDF

Info

Publication number
CN201266689Y
CN201266689Y CNU2008202181209U CN200820218120U CN201266689Y CN 201266689 Y CN201266689 Y CN 201266689Y CN U2008202181209 U CNU2008202181209 U CN U2008202181209U CN 200820218120 U CN200820218120 U CN 200820218120U CN 201266689 Y CN201266689 Y CN 201266689Y
Authority
CN
China
Prior art keywords
hanging
earth wire
operating rod
earth
fixed pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202181209U
Other languages
Chinese (zh)
Inventor
白洋
卢广益
李维海
贾占春
李辰
刘昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YINGKOU POWER SUPPLY COMPANY LIAONING ELECTRIC POWER Co Ltd
Original Assignee
YINGKOU POWER SUPPLY COMPANY LIAONING ELECTRIC POWER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YINGKOU POWER SUPPLY COMPANY LIAONING ELECTRIC POWER Co Ltd filed Critical YINGKOU POWER SUPPLY COMPANY LIAONING ELECTRIC POWER Co Ltd
Priority to CNU2008202181209U priority Critical patent/CN201266689Y/en
Application granted granted Critical
Publication of CN201266689Y publication Critical patent/CN201266689Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

A 220KV and 66KV earth wire hanging insulated operating rod belongs to the design and manufacture technical field of insulated operating rods for hanging earth wires. The upper part of the operating rod body is provided with a connecting hose, the inner of which is provided with an earth terminal joint post. The joint post is provided with a joint plate. A fixed pin hole at the middle of the joint post is provided with a bayonet fixed pin. The upper part of the connecting hose has a pair of double helix bayonets, the right side of which is provided with a fixed pin positioning opening. The use method of the utility model comprises the following steps: a bolt for an earth wire clamp is fixed on the joint plate; operation personnel lift the operating rod by hand to extend the earth wire clamp to a conductor, and the earth wire clamp is clamped on the conductor, thus hanging the earth wire on the conductor. The insulated operating rod has simple structure and reasonable design and overcomes the problem that an insulating rope flexible material can not be operated under the situation of swinging about caused by wind blowing or a special situation, thus leading the hanging of the earth wire to be more convenient and quick and greatly lessening the labor intensity of operation personnel. The operating rod is ideal for hanging the earth wire.

Description

220 kilovolts and 66 kilovolts of hanging ground-wire insulating bars
Technical field
The utility model belongs to the design and the manufacturing technology field of the insulating bar that hanging ground-wire uses.
In the operation of power transmission sequence interruption maintenance, the hanging ground-wire mode of employing all is to use the insulation rope to throw hanging earthing conductor at present.The operating personnel stands in shaft tower cross-arm head, and hand is grabbed an end of insulation rope, has the earth connection wire clamp on the other end of insulation rope.The operating personnel is as fishing, and insulation rope relies on the gravity of earthing clamp, slowly near lead, treats to aim at fully, and wire clamp being transferred insulation and restricting during again very near lead, and wire clamp is stuck on the lead, finishes hanging ground-wire.But this method difficulty is very big, particularly meets the big weather of wind, and the insulation rope plays pendulum under wind, wants near lead then very difficult.Not only time-consuming but also require great effort.In addition, under special circumstances, as need at the strain tower hanging ground-wire, and strain tower is when having a very big angle, the wire jumper of strain tower will be oblique to the interior angle lateral deviation, and in this case, adopting the insulation rope to throw hanging ground-wire is to be difficult to earth connection is suspended on the strain tower wire jumper.Also there be not the product identical to use in practice at present with the utility model.
Summary of the invention
The purpose of this utility model provides a kind of hanging ground-wire operation very convenient insulating bar of hanging ground-wire efficiently that becomes that makes, with the labour intensity that alleviates the operating personnel with improve operating efficiency.
Structure of the present utility model is as shown in drawings: the operation body of rod is flexible rod-type.One tube connector is arranged at the top at the operation body of rod.A pair of spiral bayonet socket is arranged on the top of tube connector, have the steady pin positioning port on double helix bayonet socket right side.Have an earth connection point to connect post in tube connector, a joint cover is arranged at the top that connects post in earth connection point.Have bolt hole on the joint cover.It is the pipe shape that earth connection point connects post, and the middle part that connects post in earth connection point has fixed pin holes, and a bayonet socket steady pin is arranged in the fixed pin holes.Using method of the present utility model is, earth connection point is connect the post tube connector of packing into, and the earth connection wire clamp is fixed by bolts on the joint cover.The bayonet socket steady pin is rotated in the fixed pin holes.Operating personnel's hand is lifted action bars the earth connection wire clamp is extended lead, is stuck on the lead by the earth connection wire clamp, thereby ground wire is suspended on the lead.The pipe that is rotatably connected then withdraws from the bayonet socket steady pin in fixed pin holes.Finish the hanging ground-wire operation.The utility model is simple in structure, and is reasonable in design, because the operation body of rod is a hard material, overcome the problem that insulation rope soft material plays pendulum and can't operate under special circumstances under wind.Make the hanging ground-wire operation become very convenient quick, alleviate labor intensity of operating personnel greatly.It is a kind of desirable hanging ground-wire action bars that is used for.
Description of drawings
Fig. 1 is the utility model structural representation
2-the earth connection point of 1-joint cover connects post 3-bayonet socket steady pin 4-double helix bayonet socket 5-steady pin positioning port 6-tube connector 7-operation body of rod
Fig. 2 connects the rod structure schematic diagram for the utility model earth connection point
2-the earth connection point of 1-joint cover connects post 3-bayonet socket steady pin 8-bolt hole
Fig. 3 is the utility model tube connector structural representation
4-double helix bayonet socket, 5-steady pin positioning port, 6-tube connector
Embodiment
Structure of the present utility model is as shown in drawings: the operation body of rod 7 is flexible rod-type.One tube connector 6 is arranged at the top at the operation body of rod.A pair of spiral bayonet socket 4 is arranged on the top of tube connector, have steady pin positioning port 5 on double helix bayonet socket right side.Have an earth connection point to connect post 2 in tube connector, a joint cover 1 is arranged at the top that connects post in earth connection point.Have bolt hole 8 on the joint cover.It is the pipe shape that earth connection point connects post, and the middle part that connects post in earth connection point has fixed pin holes, and a bayonet socket steady pin 3 is arranged in the fixed pin holes.

Claims (1)

  1. 220 kilovolts and 66 kilovolts of hanging ground-wire insulating bars, it is characterized in that: the operation body of rod (7) is flexible rod-type, one tube connector (6) is arranged at the top at the operation body of rod, a pair of spiral bayonet socket (4) is arranged on the top of tube connector, have steady pin positioning port (5) on double helix bayonet socket right side, in tube connector, there is an earth connection point to connect post (2), one joint cover (1) is arranged at the top that connects post in earth connection point, have bolt hole (8) on the joint cover, in the fixed pin holes in the middle part of earth connection point connects post a bayonet socket steady pin (3) is arranged.
CNU2008202181209U 2008-09-19 2008-09-19 220kv and 66kv ground wire hanging insulated operating lever Expired - Fee Related CN201266689Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202181209U CN201266689Y (en) 2008-09-19 2008-09-19 220kv and 66kv ground wire hanging insulated operating lever

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202181209U CN201266689Y (en) 2008-09-19 2008-09-19 220kv and 66kv ground wire hanging insulated operating lever

Publications (1)

Publication Number Publication Date
CN201266689Y true CN201266689Y (en) 2009-07-01

Family

ID=40833064

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202181209U Expired - Fee Related CN201266689Y (en) 2008-09-19 2008-09-19 220kv and 66kv ground wire hanging insulated operating lever

Country Status (1)

Country Link
CN (1) CN201266689Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102315530A (en) * 2011-07-12 2012-01-11 镇江市科捷电器有限公司 Ground wire hitching apparatus
CN102593624A (en) * 2012-03-02 2012-07-18 山东电力集团公司滨州供电公司 Special grounding wire for power transmission line
CN103531927A (en) * 2013-08-01 2014-01-22 国家电网公司 Direct lead wire grounding wire mounting and dismounting device
CN104092032A (en) * 2014-07-26 2014-10-08 国家电网公司 10kV drop switch grounding connection rod
CN107785685A (en) * 2017-10-10 2018-03-09 广州供电局有限公司 High-voltage earthing rod and high-voltage earthing rod operating method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102315530A (en) * 2011-07-12 2012-01-11 镇江市科捷电器有限公司 Ground wire hitching apparatus
CN102593624A (en) * 2012-03-02 2012-07-18 山东电力集团公司滨州供电公司 Special grounding wire for power transmission line
CN103531927A (en) * 2013-08-01 2014-01-22 国家电网公司 Direct lead wire grounding wire mounting and dismounting device
CN104092032A (en) * 2014-07-26 2014-10-08 国家电网公司 10kV drop switch grounding connection rod
CN107785685A (en) * 2017-10-10 2018-03-09 广州供电局有限公司 High-voltage earthing rod and high-voltage earthing rod operating method

Similar Documents

Publication Publication Date Title
CN202050150U (en) Insulating operating lever for hanging ground wire
CN201266689Y (en) 220kv and 66kv ground wire hanging insulated operating lever
CN204230457U (en) Universal connector earth wire operation rod
CN202042855U (en) Wind power bird repelling device for overhead line
CN204424800U (en) The lifting device of replacing insulator string on transmission line
CN203300937U (en) High-hitching ground wire operating lever
CN201576773U (en) Device for preventing people from climbing rod to connect wires for temporary power utilization
CN101699677A (en) Multifunctional operating arm
CN201051551Y (en) Double tube ground line operation bar
CN101378153A (en) Diverter for grounding wire
CN203522016U (en) Device for lifting overhead ground wire
CN204732781U (en) A kind of electric power maintenance insulation saw
CN203491599U (en) Insulator dismounting pin-withdrawing device
CN206353611U (en) The high-low pressure clamp for ground wire of direction self adjusting
CN202513517U (en) Bracket arm hoop
CN203014272U (en) A 10kV power-on folding adjustable distribution bypass line insulating support
CN205400233U (en) Install cross arm on wire pole
CN108775315A (en) A kind of quick coupling
CN104022461B (en) Change the double string horizontal insulator instruments of 500KV straight lines simply connected
CN201639196U (en) Insulating tool set
CN204885991U (en) Electrified V -arrangement insulator chain write off ware of changing of transmission line
CN102683915A (en) Quick joint for high-tension cables
CN202333162U (en) Grounding wire hook of transformer equipment
CN208337026U (en) A kind of distribution cable deicing bar
CN209193380U (en) Pre- arch tube type bus hoisting mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090701

Termination date: 20091019