CN201250067Y - Hydraulic flashboard balance crane - Google Patents

Hydraulic flashboard balance crane Download PDF

Info

Publication number
CN201250067Y
CN201250067Y CNU2008200225221U CN200820022522U CN201250067Y CN 201250067 Y CN201250067 Y CN 201250067Y CN U2008200225221 U CNU2008200225221 U CN U2008200225221U CN 200820022522 U CN200820022522 U CN 200820022522U CN 201250067 Y CN201250067 Y CN 201250067Y
Authority
CN
China
Prior art keywords
buoyancy tank
connecting frame
rotating disk
binary
winch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200225221U
Other languages
Chinese (zh)
Inventor
何富荣
孙寿森
马学明
付永林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200225221U priority Critical patent/CN201250067Y/en
Application granted granted Critical
Publication of CN201250067Y publication Critical patent/CN201250067Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a hydraulic flashboard balance crane which comprises a connecting frame, a double-body floating box, a lifting spudleg, turntables, a winch, a hanger rod and a pulley wheel rope system. The hydraulic flashboard balance crane is characterized in that the connecting frame is arranged on the double-body floating box; the turntables are arranged at both ends of the upper part of the connecting frame; the winch, the hanger rod and a rope pulley wheel support frame are arranged on the turntables; the lifting spudleg and a bearing floating box are arranged at the two ends of the double-body floating box; the turntables, the winch and the hanger rod are symmetrically arranged to form a double-machine balance crane. The hydraulic flashboard balance crane has the characteristics of automatic balance, high hoist operation efficiency and the like, and is widely applied to hydraulic flashboard engineering or similar occasions in rivers, lakes and seas.

Description

Waterpower inserting plate balancing hoisting machine
One, technical field
The utility model relates to loop wheel machine, particularly a kind of waterpower inserting plate balancing hoisting machine.
Two, background technology
Finish the hydraulic sheeting construction task and must rely on lifting appliance, particularly will enter subaqueous work, land loop wheel machine advances not go, and crane barge waterborne because be subjected to stormy waves to influence unstable working condition, is influenced by draft also simultaneously again, and a lot of shallow waters along the coast can't enter.Moreover the One-Shift Costs height of crane barge has increased construction cost again.On the other hand, the existing single pole loop wheel machine safety and stability of going all out to be unfavorable for more greatly before when lifting operation, also suitable difficulty of the transfer of whole loop wheel machine and dismounting transportation after construction finishes.
Three, summary of the invention
The technical problems to be solved in the utility model is to overcome or the shortcoming avoiding existing in the above-mentioned prior art or not enough and a kind of waterpower inserting plate balancing hoisting machine is provided, finish plate construction operation waterborne and general lifting operation task, safety and stability problem when having solved lifting operation by two pairs of mutual balances of suspension rod, loop wheel machine and chassis rise in the air with latch by wire rope pulley group pressurization and are fixed on the influence of avoiding stormy waves when making the loop wheel machine lifting operation on four spud legs during work.In the work progress during shift position pressure-bearing buoyancy tank of four spud leg bottoms shrink and enter that whole waterpower inserting plate balancing hoisting machine becomes a binary pontoon in the chassis, before the construction, the bulk-breaking transportation, assembled on site, after the construction, the bulk-breaking dismounting, transportation, shift very convenient.
The utility model comprises connecting frame, binary buoyancy tank, lifting spud leg, rotating disk, winch, suspension rod and chain wheel rope cable system, it is characterized in that on the described binary buoyancy tank connecting frame being installed, this connecting frame both upper ends thereof is equipped with rotating disk, winch and suspension rod and rope pulley bracing frame are installed on the rotating disk, described binary buoyancy tank two ends are equipped with lifting spud leg and pressure-bearing buoyancy tank, described rotating disk winch and suspension rod are symmetric design, form the two-shipper balance crane.
The lower end of wherein said binary buoyancy tank is provided with circular depressed, and described pressure-bearing buoyancy tank can be hidden in wherein.Described suspension rod lower end is a compasses formula structure, flexibly connects with rotating disk and installs.Described connecting frame is vertical installation with the binary buoyancy tank.
According to above-mentioned principle, described rotating disk is installed on link span central authorities, and two suspension rods are installed on it, forms two bar balance cranes.
The utility model has following advantage or beneficial effect compared with prior art:
1, the loop wheel machine lift-off is fixed on four spud legs during construction operation, is equivalent to marine oil drilling platform, has solved crane barge waterborne and influenced by stormy waves to play pendulum the problem that influences construction.
2, two pairs of suspension rod balances are installed in when having solved lifting operation on the chassis folk prescription to stressed too big crank-sided problem.
3, two suspension rod cross-operation have improved work efficiency.
4, adopt wire rope pulley group pressurization lifting loop wheel machine to compare with the mode of traditional hydraulic lifting or rack-and-gear lifting to have processing and fabricating convenient, infusion of financial resources is few, and rising or falling speed is fast, the distinguishing feature that safety of operation is stable.
5, adopt the binary buoyancy tank as hull, it is little to have a wind-engaging wave resistance, and the property of floating on the water walking safety and stability is good.
6, bulk-breaking is prefabricated, bulk-breaking transports, field-installed version helps satisfying the need of work under the different situations.
Four, description of drawings
Fig. 1 is a kind of structural representation of the present utility model
Fig. 2 is for pressing structure schematic top plan view shown in Figure 1
The another kind of structural representation of Fig. 3
Fig. 4 is for pressing structure schematic top plan view shown in Figure 3
Fig. 5 enters in the air for loop wheel machine adopts the pressurization of wire rope pulley group to rise to before the mode of operation by latch and fixedly makes pressure-bearing buoyancy tank water-bed ground-surface structural representation extremely on the spud leg
Fig. 6 shrinks and to enter the loop wheel machine chassis and form a twin-hull pontoon and swim in constitution diagram on the water surface for the finish pressure-bearing buoyancy tank of four spud leg bottoms of work
Five, the specific embodiment:
Referring to Fig. 1~Fig. 6, a kind of waterpower inserting plate balancing hoisting machine, comprise connecting frame 3, binary buoyancy tank 1, lifting spud leg 2, rotating disk 4, winch 5, suspension rod 6 and chain wheel rope cable system, connecting frame 3 is installed on the binary buoyancy tank 1, this connecting frame both upper ends thereof is equipped with rotating disk 4, and winch 5 and suspension rod 6 and rope pulley bracing frame are installed on the rotating disk, and binary buoyancy tank 1 two ends are equipped with lifting spud leg 2 and pressure-bearing buoyancy tank 10, rotating disk 4 winches 5 and suspension rod 6 are symmetric design, form the two-shipper balance crane.
Wherein the lower end of binary buoyancy tank 1 is provided with circular depressed, and pressure-bearing buoyancy tank 10 can be hidden in wherein.Suspension rod 6 lower ends are compasses formula structure, flexibly connect with rotating disk 4 and install.Connecting frame 3 is vertical installation with binary buoyancy tank 1.
Rotating disk 4 is installed on connecting frame 3 central authorities, and two suspension rods 6 are installed on it, forms two bar balance cranes.
Before waterpower inserting plate balancing hoisting machine arrival construction location enters mode of operation, at first the pulley 9 at 8 pairs of two suspension hooks, 7 hoisting cables pressurization spud leg, 2 tops with self pressurizes, make spud leg 2 overcome the buoyancy that bottom pressure-bearing buoyancy tank 10 produces, pressure-bearing buoyancy tank 10 is pressed onto on the water-bed ground, making whole loop wheel machine leave the water surface by continuing to pressurize rises in the air, insert in the pin hole 11 that is provided with on the lifting spud leg 2 with latch then, the loop wheel machine chassis is fixed on four lifting spud legs 2, and whole loop wheel machine enters the mode of operation of normal lifts.
Pressurize by 8 pairs of pulleys 9 of two suspension hooks, 7 hoisting cables in the same way after hours, when compression strength and loop wheel machine weight balancing, from spud leg 2, extract latch the pin hole 11, four spud legs rely on the buoyancy of bottom pressure-bearing buoyancy tank 10 generations that spud leg 2 automatic come-up pressure-bearing buoyancy tanks 10 are entered in the cavity of reserving on the binary buoyancy tank 1, whole waterpower inserting plate balancing hoisting machine becomes a twin-hull pontoon and swims on the water surface, enters next control position and begins new construction operation.

Claims (5)

1, a kind of waterpower inserting plate balancing hoisting machine, comprise connecting frame, binary buoyancy tank, lifting spud leg, rotating disk, winch, suspension rod and chain wheel rope cable system, it is characterized in that on the described binary buoyancy tank connecting frame being installed, this connecting frame both upper ends thereof is equipped with rotating disk, winch and suspension rod and rope pulley bracing frame are installed on the rotating disk, described binary buoyancy tank two ends are equipped with lifting spud leg and pressure-bearing buoyancy tank, and described rotating disk, winch and suspension rod are symmetric design, form the two-shipper balance crane.
2, according to the described waterpower inserting plate balancing hoisting machine of claim 1, it is characterized in that the lower end of described binary buoyancy tank is provided with circular depressed, described pressure-bearing buoyancy tank can be hidden in wherein.
3, according to the described waterpower inserting plate balancing hoisting machine of claim 1, it is characterized in that described suspension rod lower end is a compasses formula structure, flexibly connect with rotating disk and install.
4,, it is characterized in that described connecting frame is vertical installation with the binary buoyancy tank according to the described waterpower inserting plate balancing hoisting machine of claim 1.
5, according to the described waterpower inserting plate balancing hoisting machine of claim 1, it is characterized in that described rotating disk is installed on connecting frame central authorities, two suspension rods are installed on it, form two bar balance cranes.
CNU2008200225221U 2008-05-14 2008-05-14 Hydraulic flashboard balance crane Expired - Lifetime CN201250067Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200225221U CN201250067Y (en) 2008-05-14 2008-05-14 Hydraulic flashboard balance crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200225221U CN201250067Y (en) 2008-05-14 2008-05-14 Hydraulic flashboard balance crane

Publications (1)

Publication Number Publication Date
CN201250067Y true CN201250067Y (en) 2009-06-03

Family

ID=40745738

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200225221U Expired - Lifetime CN201250067Y (en) 2008-05-14 2008-05-14 Hydraulic flashboard balance crane

Country Status (1)

Country Link
CN (1) CN201250067Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101332962B (en) * 2008-05-14 2010-04-14 何富荣 Waterpower inserting plate balancing hoisting machine
CN103434947A (en) * 2013-09-12 2013-12-11 浙江海洋学院 Offshore transfer gantry crane
CN103950845A (en) * 2014-04-28 2014-07-30 浙江省围海建设集团宁波宏阳建设有限公司 Crane with floatable hydraulic slab

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101332962B (en) * 2008-05-14 2010-04-14 何富荣 Waterpower inserting plate balancing hoisting machine
CN103434947A (en) * 2013-09-12 2013-12-11 浙江海洋学院 Offshore transfer gantry crane
CN103434947B (en) * 2013-09-12 2016-06-15 浙江海洋学院 offshore transfer gantry crane
CN103950845A (en) * 2014-04-28 2014-07-30 浙江省围海建设集团宁波宏阳建设有限公司 Crane with floatable hydraulic slab
CN103950845B (en) * 2014-04-28 2016-01-20 浙江宏力阳生态建设股份有限公司 A kind of hydraulic sheeting floatable hoisting crane

Similar Documents

Publication Publication Date Title
CN100999247B (en) Truss semi-submersible offshore floating structure
CN111469993B (en) Self-installation floating type fan foundation anchored by bucket foundation and self-installation method
US20110214596A1 (en) Vertically installed spar and construction methods
CN101332962B (en) Waterpower inserting plate balancing hoisting machine
CN111661273B (en) Installation and construction method of deep and open sea semi-submersible fan
CN101538844A (en) Construction method for building large-scale offshore wind farm with depth more than 2m
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
KR102632315B1 (en) Buoys and installation methods for them
CN107804437A (en) Sit bottom jack up wind-powered electricity generation pile driving barge
CN105339651A (en) Platform for tidal turbines
CN201250067Y (en) Hydraulic flashboard balance crane
CN114179983A (en) Floating type fan platform installation method
CN216636762U (en) Mooring system of offshore floating type wind power generation platform
CN115788782A (en) Floating type fan offshore installation process
CN109518590B (en) Suspension cable type river-crossing floating bridge
CN204452866U (en) Platform is floated with the tension leg type high stability of biological floating bed combination
CN103195080B (en) Towing method for gravity foundation
CN102206938A (en) Novel method for installing upper part block of offshore platform
CN207861722U (en) A kind of Simple water floating type gantry crane
GB2327449A (en) Method of transporting and installing a substructure
CN202987472U (en) Truss type offshore wind turbine mounting barge capable of sitting on bottom
CN108674597A (en) A kind of jack up wind-powered electricity generation mounting platform
CN108791738A (en) A kind of Large marine wind turbine entirety floating support mounting method
CN202164066U (en) Hoisting device for large-scale articles
CN106386626A (en) Net cage anchoring foundation with steel piles distributed on two sides of cement pier and construction method of net cage anchoring foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20090603

Effective date of abandoning: 20080514