CN108674597A - A kind of jack up wind-powered electricity generation mounting platform - Google Patents

A kind of jack up wind-powered electricity generation mounting platform Download PDF

Info

Publication number
CN108674597A
CN108674597A CN201810563219.0A CN201810563219A CN108674597A CN 108674597 A CN108674597 A CN 108674597A CN 201810563219 A CN201810563219 A CN 201810563219A CN 108674597 A CN108674597 A CN 108674597A
Authority
CN
China
Prior art keywords
spud leg
deck
hull
crane
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810563219.0A
Other languages
Chinese (zh)
Inventor
张乐平
李宏龙
吴春寒
沈郑明
洪晓燕
吴建华
汪爱国
朱聪聪
陈建光
徐长林
张怀博
顾九明
杨学
苏铁焱
汤浩智
徐李
王斌财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Science And Technology Group Marine Engineering Co Ltd
Original Assignee
Zhongtian Science And Technology Group Marine Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Science And Technology Group Marine Engineering Co Ltd filed Critical Zhongtian Science And Technology Group Marine Engineering Co Ltd
Priority to CN201810563219.0A priority Critical patent/CN108674597A/en
Publication of CN108674597A publication Critical patent/CN108674597A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B2021/505Methods for installation or mooring of floating offshore platforms on site
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/4433Floating structures carrying electric power plants
    • B63B2035/446Floating structures carrying electric power plants for converting wind energy into electric energy

Abstract

The invention discloses a kind of jack up wind-powered electricity generation mounting platforms, bicyclic beam continuous hydraulic bolt-type lifting apparatus is provided on hull, hull is disposed with main deck from bottom to up, first deck, second deck, third deck, 4th deck, first spud leg, second spud leg, third spud leg and the 4th spud leg sequentially pass through the 4th deck under upper, third deck, second deck, first deck is flexible to be arranged in shoe, first spud leg, second spud leg, third spud leg, 4th spud leg is arranged with high-order ring beam and low level ring beam, the piston rod of high-order ring beam and main lifting cylinder is articulated and connected, the bottom of main lifting cylinder is hinged on the first deck, low level ring beam and the piston rod of auxiliary lifting cylinder are articulated and connected, the bottom of auxiliary lifting cylinder is hinged on the second deck;Main crane, the first crane, the second crane, four-point mooring positioning system, the first propeller and the second propeller are provided on hull.

Description

A kind of jack up wind-powered electricity generation mounting platform
Technical field
The present invention relates to field of ocean engineering, and in particular to a kind of jack up wind-powered electricity generation mounting platform.
Background technology
Currently, domestic generally add pile gripper form using jack up wind-powered electricity generation mounting platform(Pile gripper is the equipment on platform) Carry out the piling of blower foundation and the lifting of Fan Equipment.In engineering with barge and cargo ship, platform majority is by dragging Wheel tows, and most platforms are suitble to the engineering construction within the 30m depth of waters.The engineering centered on jack up wind-powered electricity generation mounting platform, Not only ship construction cost is big, complex procedures, but also cannot be satisfied far-reaching sea and large fan(6MW and with upper fan)'s Construction.
Existing platform leg is climbed form using climb form or single step of gear type into hydraulic bolt, deficient in stability and Convenience, is not configured propulsion device, and speed of application is slow.
Invention content
In order to solve the above technical problems, the present invention provides a kind of jack up wind-powered electricity generation mounting platforms.
The technical scheme is that:A kind of jack up wind-powered electricity generation mounting platform is provided with bicyclic beam continuous hydraulic on hull Bolt-type lifting apparatus, bicyclic beam continuous hydraulic bolt-type lifting apparatus include the first spud leg, the second spud leg, third spud leg, the Four spud legs, shoe, main lifting cylinder, auxiliary lifting cylinder, the first spud leg and the second spud leg are arranged in the side of hull, third spud leg It is arranged in the other side of hull with the 4th spud leg, the first spud leg is correspondingly arranged with third spud leg, the second spud leg and the 4th spud leg pair It should be arranged;Hull is disposed with main deck, the first deck, the second deck, third deck, the 4th deck from bottom to up, and first Spud leg, the second spud leg, third spud leg and the 4th spud leg sequentially pass through the 4th deck, third deck, the second deck, under upper Elevating movement is made on one deck, and the bottom of shoe is fixed at seabed, the first spud leg, the second spud leg, third spud leg, the 4th spud leg It is arranged with high-order ring beam and low level ring beam, the piston rod of high-order ring beam and main lifting cylinder is articulated and connected, main lifting cylinder Bottom is hinged on the first deck, and low level ring beam and the piston rod of auxiliary lifting cylinder are articulated and connected, the bottom hinge of auxiliary lifting cylinder It is connected on the second deck;Main crane is provided on hull, the center position in the first spud leg, main lifting is arranged in main crane Machine works around the first spud leg;Four-point mooring positioning system, the first propeller and the second propeller are provided on hull.
Further, the first crane and the second crane, the first crane and second gram of order are provided on the hull It hangs and is correspondingly arranged, the first crane is close to third spud leg position, and the second crane is close to the 4th spud leg position.
Further, the four-point mooring positioning system includes four anchor winches, four anchors and four anchor cables, the bow of hull Anchoring anchor point is each provided at left and right sides of portion and stern, there are one anchor winch, anchor winches for setting at each anchor point that anchors On anchor cable anchor is connected by chock.
Further, the bottom of the hull is provided with double walled floor, divides in the space between double walled floor and main deck It is furnished with the first propeller, the second propeller, the first ballast tank, the second ballast tank and third ballast tank, the setting of the first propeller exists The two side ends in hull stern are arranged in the center of hull fore body, the second propeller.
Further, first ballast tank is arranged the fore body in hull and is distributed in the both sides of the first propeller, the Two ballast tanks are arranged along the length direction of hull in the both sides of hull.
Beneficial effects of the present invention are:The present invention uses bicyclic beam continuous hydraulic bolt-type lifting apparatus, lifting to stablize fast Speed, spud leg are up to 85m, can carry out the deepwater work of the 50m depth of waters;Equipped with 600t loop wheel machines, the lifting of 8mw wind turbines can be carried out;Match Propeller is had, can voluntarily be migrated in wind power plant;Multideck is provided on main deck, partial deck machinery moves to main deck The area utilization of upper area, deck is high.Jack up wind-powered electricity generation mounting platform and crane barge ship collective effect are formed " a dozen two hang " Engineering cost is greatly saved in pattern.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram of the vertical view of the present invention.
Fig. 2 is the structural schematic diagram of the side view of the present invention.
Fig. 3 is the structural schematic diagram on the first deck.
Fig. 4 is the enlarged drawing at a of Fig. 3.
Fig. 5 is the structural schematic diagram on the second deck.
Fig. 6 is the enlarged drawing at a of Fig. 5.
Fig. 7 is the space structure schematic diagram between double walled floor and main deck.
Specific implementation mode
The specific implementation mode of the present invention is described further below in conjunction with the accompanying drawings, the present embodiment is not constituted to the present invention Limitation.
A kind of jack up wind-powered electricity generation mounting platform, including hull 1, bicyclic beam continuous hydraulic bolt-type lifting apparatus, main deck 6, the first deck 7, the second deck 8, third deck 9, the 4th deck 10, main crane 14, the first crane 15, the second crane 16, anchor winch 17, anchor cable 18, chock 19, double walled floor 20, the first propeller 21, the second propeller 22, the first ballast tank 23, the second ballast tank 24 and third ballast tank 25.
Refering to fig. 1 to Fig. 6, bicyclic beam continuous hydraulic bolt-type lifting apparatus, bicyclic beam continuous hydraulic are provided on hull 1 Bolt-type lifting apparatus includes the first spud leg 2, the second spud leg 3, third spud leg 4, the 4th spud leg 5, shoe 11, main lifting cylinder 12, auxiliary lifting cylinder 13.
First spud leg 2 and the second spud leg 3 are arranged in the side of hull, and third spud leg 4 and the 4th spud leg 5 are arranged in hull 1 The other side, the first spud leg 2 is correspondingly arranged with third spud leg 4, and the second spud leg 3 is correspondingly arranged with the 4th spud leg 5.Hull 1 is under It is supreme to be disposed with main deck 6, the first deck 7, the second deck 8, third deck 9, the 4th deck 10, the first spud leg 2, second Spud leg 3, third spud leg 4 and the 4th spud leg 5 sequentially pass through the 4th deck 10, third deck 9, the second deck 8, first under upper Elevating movement is made on deck 7, and bicyclic beam continuous hydraulic bolt-type lifting apparatus is located in fixed pile chamber, controls the lifting of spud leg under Drop.First spud leg 2, the second spud leg 3, third spud leg 4, the 4th spud leg 5 are arranged with high-order ring beam and low level ring beam, high-order ring beam It is articulated and connected with the piston rod of main lifting cylinder 12, the bottom of main lifting cylinder 12 is hinged on the first deck 7.Low level ring beam It is articulated and connected with the piston rod of auxiliary lifting cylinder 13, the bottom of auxiliary lifting cylinder 13 is hinged on the second deck 8.Using bicyclic beam Continuous hydraulic bolt-type lifting apparatus, lifting spud leg are stablized rapid.
First spud leg 2, the second spud leg 3, third spud leg 4, the 4th spud leg 5 height be 85m, can carry out within the 50m depth of waters Operation, using continuous hydraulic bolt-type lifting pattern, lift work is more convenient.
Main crane 14 is provided on hull 1, the center position in the first spud leg 2, main lifting is arranged in main crane 14 Machine 14 is around pile-type crane, and main crane 14 works around the first spud leg 2.14 600t weights capable of hoisting of main crane, can carry out 8mw The lifting of wind turbine.
The first crane 15 and the second crane 16 are provided on hull 1, the first crane 15 and the second crane 16 are right It should be arranged, the first crane 15 is close to 4 position of third spud leg, and the second crane 16 is close to 5 position of the 4th spud leg.
Be provided with four-point mooring positioning system on hull 1, four-point mooring positioning system include four anchor winches, four anchors with Four anchor cables are each provided with anchoring anchor point at left and right sides of the fore body and stern of hull 1, are provided at each anchor point that anchors One anchor winch 17, the anchor cable 18 on anchor winch 17 pass through chock 19 and connect anchor.
The bottom of hull 1 is provided with double walled floor 20, as shown in fig. 7, in the space between double walled floor 20 and main deck 6 The first propeller 21, the second propeller 22, the first ballast tank 23, the second ballast tank 24 and third ballast tank 25 is distributed with.First Propeller 21 is arranged in the center of 1 fore body of hull, and the two side ends in 1 stern of hull are arranged in the second propeller 22.First pushes away Into the setting of device 21 and the second propeller 22 so that hull 1 can voluntarily migrate in wind power plant.First ballast tank 23 is arranged in ship The fore body of body 1 and the both sides for being distributed in the first propeller 21, the second ballast tank 24 are arranged along the length direction of hull in hull 1 Both sides, sanitary sewage cabin, grey water tank, reference water tank, fuel oil tank, anchor chain are additionally provided between double walled floor 20 and main deck 6 Cabin etc..Third ballast tank 25 is arranged the stern in hull 1 and is distributed between the second propeller 22.
Jack up wind-powered electricity generation mounting platform and crane barge ship collective effect form " a dozen two hang " pattern, engineering are greatly saved Cost.
The above described is only a preferred embodiment of the present invention, being not used in the limitation present invention, those skilled in the art can It is this to change or equally replace within the spirit and scope of the present invention, various modifications or equivalent replacements are made to the present invention It changes and also should be regarded as falling in the protection domain of technical solution of the present invention.

Claims (5)

1. a kind of jack up wind-powered electricity generation mounting platform, it is characterised in that:Bicyclic beam continuous hydraulic bolt-type lifting is provided on hull Device, bicyclic beam continuous hydraulic bolt-type lifting apparatus include the first spud leg, the second spud leg, third spud leg, the 4th spud leg, stake Boots, main lifting cylinder, auxiliary lifting cylinder, the first spud leg and the second spud leg are arranged in the side of hull, third spud leg and the 4th Leg is arranged in the other side of hull, and the first spud leg is correspondingly arranged with third spud leg, and the second spud leg is correspondingly arranged with the 4th spud leg;Ship Body is disposed with main deck, the first deck, the second deck, third deck, the 4th deck, the first spud leg, second from bottom to up Spud leg, third spud leg and the 4th spud leg sequentially pass through the 4th deck under upper, third deck, the second deck, the first deck are made Elevating movement, the first spud leg, the second spud leg, third spud leg, the 4th spud leg are arranged with high-order ring beam and low level ring beam, high-order ring The piston rod of beam and main lifting cylinder is articulated and connected, and the bottom of main lifting cylinder is hinged on the first deck, low level ring beam with it is auxiliary The piston rod of lifting cylinder is articulated and connected, and the bottom of auxiliary lifting cylinder is hinged on the second deck;Main lifting is provided on hull The center position in the first spud leg is arranged in machine, main crane, and main crane works around the first spud leg;It is provided on hull at 4 points Anchoring system, the first propeller and the second propeller.
2. a kind of jack up wind-powered electricity generation mounting platform according to claim 1, it is characterised in that:Is provided on the hull One crane and the second crane, the first crane are correspondingly arranged with the second crane, and the first crane is close to third spud leg position It sets, the second crane is close to the 4th spud leg position.
3. a kind of jack up wind-powered electricity generation mounting platform according to claim 1, it is characterised in that:Four-point mooring positioning system System includes four anchor winches, four anchors and four anchor cables, and anchoring positioning is each provided at left and right sides of the fore body and stern of hull Point, there are one anchor winch, the anchor cable on anchor winch connects anchor by chock for setting at each anchor point that anchors.
4. a kind of jack up wind-powered electricity generation mounting platform according to claim 1, it is characterised in that:The bottom of the hull is arranged There is double walled floor, the first propeller, the second propeller, the first ballast are distributed in the space between double walled floor and main deck Cabin, the second ballast tank and third ballast tank, the first propeller are arranged in the center of hull fore body, and the setting of the second propeller exists The two side ends of hull stern.
5. a kind of jack up wind-powered electricity generation mounting platform according to claim 4, it is characterised in that:The first ballast tank setting Hull fore body and be distributed in the both sides of the first propeller, the second ballast tank is arranged along the length direction of hull in hull Both sides.
CN201810563219.0A 2018-06-04 2018-06-04 A kind of jack up wind-powered electricity generation mounting platform Pending CN108674597A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810563219.0A CN108674597A (en) 2018-06-04 2018-06-04 A kind of jack up wind-powered electricity generation mounting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810563219.0A CN108674597A (en) 2018-06-04 2018-06-04 A kind of jack up wind-powered electricity generation mounting platform

Publications (1)

Publication Number Publication Date
CN108674597A true CN108674597A (en) 2018-10-19

Family

ID=63809880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810563219.0A Pending CN108674597A (en) 2018-06-04 2018-06-04 A kind of jack up wind-powered electricity generation mounting platform

Country Status (1)

Country Link
CN (1) CN108674597A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805039A (en) * 2019-11-15 2020-02-18 中天科技集团海洋工程有限公司 Floating pile stabilizing platform
CN116101454A (en) * 2022-12-13 2023-05-12 青岛天时海洋石油装备有限公司 Be applied to around stake and hang novel fork landing leg structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202124848U (en) * 2011-05-17 2012-01-25 中国石油化工集团公司 Device for leveling ocean platform lifting pile
CN103938603A (en) * 2014-04-29 2014-07-23 南通迪施有限公司 Continuous lifting device and method of installation ship platform
CN204642060U (en) * 2014-12-19 2015-09-16 中远船务工程集团有限公司 A kind of large-scale coastal waters wind power equipment installs equipment
CN105804038A (en) * 2016-05-16 2016-07-27 西伯瀚(上海)海洋装备科技有限公司 Double-layer dynamic ring beam hydraulic plug pin type cylindrical pile leg continuous lifting device
CN106275301A (en) * 2016-10-11 2017-01-04 广东精铟海洋工程股份有限公司 A kind of large-tonnage offshore wind farm mounting platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202124848U (en) * 2011-05-17 2012-01-25 中国石油化工集团公司 Device for leveling ocean platform lifting pile
CN103938603A (en) * 2014-04-29 2014-07-23 南通迪施有限公司 Continuous lifting device and method of installation ship platform
CN204642060U (en) * 2014-12-19 2015-09-16 中远船务工程集团有限公司 A kind of large-scale coastal waters wind power equipment installs equipment
CN105804038A (en) * 2016-05-16 2016-07-27 西伯瀚(上海)海洋装备科技有限公司 Double-layer dynamic ring beam hydraulic plug pin type cylindrical pile leg continuous lifting device
CN106275301A (en) * 2016-10-11 2017-01-04 广东精铟海洋工程股份有限公司 A kind of large-tonnage offshore wind farm mounting platform

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805039A (en) * 2019-11-15 2020-02-18 中天科技集团海洋工程有限公司 Floating pile stabilizing platform
CN116101454A (en) * 2022-12-13 2023-05-12 青岛天时海洋石油装备有限公司 Be applied to around stake and hang novel fork landing leg structure
CN116101454B (en) * 2022-12-13 2023-09-08 青岛天时海洋石油装备有限公司 Inclined fork supporting leg structure applied to pile winding crane

Similar Documents

Publication Publication Date Title
KR102645773B1 (en) Floating wind turbine assembly and method for mooring the floating wind turbine assembly
EP2724021B1 (en) A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm
CN103228530B (en) Floating structure operating system, floating structure, operation ship and floating structure operational method
CN109914408A (en) A kind of pile driving barge and its pose adjustment, location control and pile-driving method
US20100067989A1 (en) Vessel for transporting wind turbines and methods thereof
CN101774422B (en) Novel offshore installation construction resource-combined type pontoon barge
CN111661273B (en) Installation and construction method of deep and open sea semi-submersible fan
CN112523969B (en) Truss inhaul cable type floating offshore wind turbine structure
CN205044921U (en) Multi -functional marine construction is from peaceful platform
WO2010059489A1 (en) Stationary positioned offshore windpower plant (owp) and methods and means for its assembly, transportation, installation and servicing
WO2010062188A1 (en) A marine transport system and method for using same
WO2010026555A2 (en) A vessel for transporting wind turbines and methods thereof
CN105752282A (en) Self-elevating wind power generation work boat
WO2014070024A2 (en) A transportation and installation system and method
CN113047253A (en) Multifunctional self-elevating offshore wind power construction platform
CN216636762U (en) Mooring system of offshore floating type wind power generation platform
CN108674597A (en) A kind of jack up wind-powered electricity generation mounting platform
CN101781887A (en) Overhang installation method for upper structure of offshore platform
CN110712721A (en) Offshore wind field fan installation work engineering ship and operation method thereof
CN104554639A (en) Installation equipment for large offshore wind power equipment
CN201914862U (en) Self-rising fan mounting platform
CN214092145U (en) Truss inhaul cable type floating offshore wind turbine structure
CN108689316A (en) A kind of crane barge ship
CN201626782U (en) Amphibious crawler crane
CN104802950A (en) Self-elevating type underwater floater tension leg platform and establishing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181019

RJ01 Rejection of invention patent application after publication