CN201246100Y - Integrated arm type down-hole drill - Google Patents

Integrated arm type down-hole drill Download PDF

Info

Publication number
CN201246100Y
CN201246100Y CNU2008200542556U CN200820054255U CN201246100Y CN 201246100 Y CN201246100 Y CN 201246100Y CN U2008200542556 U CNU2008200542556 U CN U2008200542556U CN 200820054255 U CN200820054255 U CN 200820054255U CN 201246100 Y CN201246100 Y CN 201246100Y
Authority
CN
China
Prior art keywords
frame
drilling
drill boom
drill
drilling cramp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200542556U
Other languages
Chinese (zh)
Inventor
何清华
赵宏强
高淑蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Hunan Sunward Intelligent Machinery Co Ltd
Original Assignee
Central South University
Hunan Sunward Intelligent Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University, Hunan Sunward Intelligent Machinery Co Ltd filed Critical Central South University
Priority to CNU2008200542556U priority Critical patent/CN201246100Y/en
Application granted granted Critical
Publication of CN201246100Y publication Critical patent/CN201246100Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses an integral arm down-the-hole drill which comprises a running chassis, a frame (3), a drill boom (14), a drilling frame (9), a drilling system, a dynamic system (4), a hydraulic system (5), a control system (19) and a driver's cab (7); the running chassis arranged on the lower surface of the frame (3) is a caterpillar floating type running chassis; an air compressor (2) and a dust-removal system (1) are arranged on the upper surface of the frame (3); a drill boom lifting cylinder (17) and a drill boom deflecting cylinder (16) are mounted between the drill boom (14) and the frame (3); a drilling frame lifting cylinder (15) and a drilling frame deflecting cylinder (13) are arranged between drill boom (14) and the drilling frame (9); and a compensating cylinder (11) is arranged between a carriage (12) of the drilling system and the drilling frame (9). The drill has the advantages of compact structure, good maneuverability, wide working range, low energy consumption, high efficiency, light and flexible operation, simple and convenient maintenance, and low usage cost, and can satisfy the requirements of multi-direction drilling.

Description

A kind of integrated arm type in-hole perforator
Technical field
The utility model relates to a kind of rig, particularly relates to a kind of integrated arm type in-hole perforator.
Background technology
Down-the-hole drill is widely used in the engineering explosion hole drill cutter operations such as metallurgy, coal, building materials, railway, construction of hydropower facilities, national defense construction and the cubic metre of earth and stone.Traditional down-the-hole drill major part is split type, the transmission mechanism complexity, adopt the centralized air feed of air compression station, energy consumption height, efficient is low, mobility is poor, working service cost height; Traditional in addition down-the-hole drill is also most of to be adopted fixed drilling cramp or faces upward the formula drilling cramp of bowing, can not adjust bore angle or adjust angular range little, can not satisfy the needs of multi-faceted boring, once a hole can only be bored in the walking location, job area is little, and subsidiary operation time is long.
The utility model content
Technical problem to be solved in the utility model provide a kind of compact conformation, mobility good, can satisfy multi-faceted boring requirement, job area is wide, energy consumption is low, efficient is high, handle light and flexible, easy maintenance, integrated arm type in-hole perforator that use cost is low.
In order to solve the problems of the technologies described above, the integrated arm type in-hole perforator that the utility model provides, comprise walking chassis, frame, drill boom, drilling cramp, hole-drilling system, dynamical system, hydraulic system, control system, drivers' cab, the described walking chassis that described frame is provided with below is the floating type walking of crawler belt chassis, be provided with air compressor machine and dust pelletizing system above the described frame, drill boom elevating ram and drill boom deflection oil cylinder are housed between described drill boom and the described frame, are provided with drilling cramp elevating ram and drilling cramp deflection oil cylinder between described drill boom and the described drilling cramp.
Be provided with compensating cylinder between the balladeur train of described hole-drilling system and the described drilling cramp.
Adopt the integrated arm type in-hole perforator of technique scheme, partly be made up of the floating type walking of crawler belt chassis, frame, hydraulic pressure drill boom, propelling hole-drilling system, air compressor machine, dynamical system, hydraulic system, dust pelletizing system, control system, drivers' cab etc., the angle that the floating type walking of crawler belt chassis is adjusted two track frames respectively by hydraulic jack can adapt to rugged work-yard.The hydraulic pressure drill boom is equipped with drill boom elevating ram, drill boom deflection oil cylinder, drilling cramp elevating ram, four hydraulic jacks of drilling cramp deflection oil cylinder, action by hydraulic jack, can realize the lifting of drill boom, the deflection of drill boom, the lifting of drilling cramp, the actions such as deflection of drilling cramp respectively, make impactor arrive suitable operating point and suitable bore angle.Its job area is wide, and once a plurality of holes can be bored in the walking location, save subsidiary operation time, increase work efficiency.Action is accurate, rapid, and the drilling cramp adjustable angle can satisfy the requirement of multi-faceted boring.A compensating cylinder also is housed on the drilling cramp, locatees and withstand work plane when helping holing fast, prevent the drilling cramp vibration, help the boring location and improve borehole accuracy.
Arm type downhole drill makes bore position point distant apart from fuselage because drill boom stretches out, and has reduced the influence of impact shock to complete machine, and the dust that boring produces is also more much smaller than traditional rig to the influence of complete machine.
In sum, the utility model be a kind of compact conformation, mobility good, can satisfy multi-faceted boring requirement, job area is wide, energy consumption is low, efficient is high, handle light and flexible, easy maintenance, integrated arm type in-hole perforator that use cost is low.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is a vertical view of the present utility model.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1 and Fig. 2, be provided with the floating type walking of crawler belt chassis 6 below the frame 3, be provided with air compressor machine 2 above the frame 3, dust pelletizing system 1, dynamical system 4, hydraulic system 5, drivers' cab 7 and operating system 19, drill boom 14 is hinged on the frame 2, drilling cramp 9 is hinged on the drill boom 14, on drilling cramp 9, be provided with propulsion system 8, drill pipe storage 10, balladeur train 12 and rotary system 20, be provided with compensating cylinder 11 between balladeur train 12 and the drilling cramp 9, drill boom elevating ram 17 and drill boom deflection oil cylinder 16 are housed between drill boom 14 and the frame 9, are provided with drilling cramp elevating ram 15 and drilling cramp deflection oil cylinder 13 between drill boom 14 and the drilling cramp 9.
Referring to Fig. 1 and Fig. 2, the angle that the floating type walking of crawler belt chassis 6 is adjusted two track frames respectively by its walker beat oil cylinder 18 can adapt to rugged work-yard.Drill boom elevating ram 17 and drill boom deflection oil cylinder 16 are housed between drill boom 14 and the frame 9, be provided with drilling cramp elevating ram 15 and drilling cramp deflection oil cylinder 13 between drill boom 14 and the drilling cramp 9, action by hydraulic jack, can realize the lifting of drill boom 14, the deflection of drill boom 14, the lifting of drilling cramp 9, the actions such as deflection of drilling cramp 9 respectively, make impactor arrive suitable operating point and suitable bore angle.Its job area is wide, and once a plurality of holes can be bored in the walking location, save subsidiary operation time, increase work efficiency.Action is accurate, rapid, and drilling cramp 9 adjustable angle can satisfy the requirement of multi-faceted boring.A compensating cylinder 11 also is housed on the drilling cramp 9, locatees and withstand work plane when helping holing fast, prevent the drilling cramp vibration, help the boring location and improve borehole accuracy.
Arm type downhole drill makes bore position point distant apart from fuselage because drill boom stretches out, and has reduced the influence of impact shock to complete machine, and the dust that boring produces is also more much smaller than traditional rig to the influence of complete machine.

Claims (2)

1, a kind of integrated arm type in-hole perforator, comprise the walking chassis, frame (3), drill boom (14), drilling cramp (9), hole-drilling system, dynamical system (4), hydraulic system (5), control system (19), drivers' cab (7), it is characterized in that: the described walking chassis that described frame (3) is provided with below is the floating type walking of crawler belt chassis (6), be provided with air compressor machine (2) and dust pelletizing system (1) above the described frame (3), drill boom elevating ram (17) and drill boom deflection oil cylinder (16) are housed between described drill boom (14) and the described frame (3), are provided with drilling cramp elevating ram (15) and drilling cramp deflection oil cylinder (13) between described drill boom (14) and the described drilling cramp (9).
2, integrated arm type in-hole perforator according to claim 1 is characterized in that: be provided with compensating cylinder (11) between balladeur train of described hole-drilling system (12) and the described drilling cramp (9).
CNU2008200542556U 2008-08-28 2008-08-28 Integrated arm type down-hole drill Expired - Fee Related CN201246100Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200542556U CN201246100Y (en) 2008-08-28 2008-08-28 Integrated arm type down-hole drill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200542556U CN201246100Y (en) 2008-08-28 2008-08-28 Integrated arm type down-hole drill

Publications (1)

Publication Number Publication Date
CN201246100Y true CN201246100Y (en) 2009-05-27

Family

ID=40729920

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200542556U Expired - Fee Related CN201246100Y (en) 2008-08-28 2008-08-28 Integrated arm type down-hole drill

Country Status (1)

Country Link
CN (1) CN201246100Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094579A (en) * 2011-01-28 2011-06-15 武汉市天宝工程机械有限责任公司 Full-hydraulic tire rock drilling anchoring drill carriage
CN103603597A (en) * 2013-11-10 2014-02-26 刘贞永 Traveling-type down-the-hole drill

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094579A (en) * 2011-01-28 2011-06-15 武汉市天宝工程机械有限责任公司 Full-hydraulic tire rock drilling anchoring drill carriage
CN103603597A (en) * 2013-11-10 2014-02-26 刘贞永 Traveling-type down-the-hole drill

Similar Documents

Publication Publication Date Title
CN101343979A (en) Integrated arm type in-hole perforator
CN104612586B (en) Tunneling boring rapid drilling drill carriage for the big emptying aperture parallel cut blasting in tunnel
CN201526271U (en) Crawler-type all-hydraulic tunnel drilling machine
CN202090831U (en) Multi-functional excavator type movable-arm foldable hydraulic rotary cutting pneumatic hammer drill
CN102155162B (en) Floating chassis foldable boom type hydraulic drill carriage
CN2900757Y (en) Full hydraulic omnibearing down the hole drill
CN201810202U (en) Multi-functional excavator type arm support folding hydraulic drilling machine
CN101832102A (en) Movable two-platform partitioned four-arm hanging wall anchor rod and anchor cable construction drill carriage
CN202417306U (en) Novel water well drilling machine
CN202090830U (en) Multifunctional simple hydraulic drilling rig with double folded moving arms and universal hinge pair
CN102409974B (en) Vibration and extrusion type drilling machine
CN103899249A (en) Coal mine roadway bottom board anchoring drill carriage
CN201835744U (en) Multifunctional movable arm folding hydraulic drill
CN202417307U (en) Multifunctional longhole drilling machine
CN101737008A (en) Large-aperture split arm type downhole drill
CN101382041A (en) Dredger type drill
CN201794513U (en) Multifunctional double-fold hydraulic drilling rig with movable arms
CN201246100Y (en) Integrated arm type down-hole drill
CN102134966A (en) Cutting drilling machine
CN201598980U (en) Full hydraulic multifunctional machine for drilling and excavation
CN204851053U (en) Double dynamical first all -hydraulic core -drill(ing) machine of top formula of driving
CN201908565U (en) Base plate anchor rope drilling machine for coal mine tunnel
CN206987731U (en) A kind of wheeled down-the-hole drill of band-offset rotation mechanism
CN201598979U (en) Excavator type hydraulic translation drilling machine
CN201173088Y (en) Downhole trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090527

Termination date: 20140828

EXPY Termination of patent right or utility model