CN201245140Y - Secondary gas filling station self-complementing voltage-stabilizing charging apparatus - Google Patents
Secondary gas filling station self-complementing voltage-stabilizing charging apparatus Download PDFInfo
- Publication number
- CN201245140Y CN201245140Y CNU2008201169996U CN200820116999U CN201245140Y CN 201245140 Y CN201245140 Y CN 201245140Y CN U2008201169996 U CNU2008201169996 U CN U2008201169996U CN 200820116999 U CN200820116999 U CN 200820116999U CN 201245140 Y CN201245140 Y CN 201245140Y
- Authority
- CN
- China
- Prior art keywords
- gas
- pressure
- substation
- low
- gas storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model relates to a self-supplementing constant-pressure gas charging system of a gas substation. When an off-station gas source does not exist, the gas charging system can orderly supplement the low-pressure and medium-pressure stored gas in the substation into a high-pressure gas storage depot, so that the pressure of the charged gas can be kept in a rated range. The gas charging system mainly comprises a substation compressor, the high-pressure gas storage depot, a medium-pressure gas storage depot, a low-pressure gas storage depot, a self-supplementing loop system and a gas charger which are connected together. Compared with the prior art, the utility model can increase the utilization rate of the equipment in the substation, prolong the working time of the gas substation maintaining the rated pressure and extend the arrangement distance between a station and the substation. The utility model, which increases the gas-discharging efficiency of a gas tanker, saves electricity consumption and reduces the operation cost, has the advantages of simple structure, simple and convenient mounting, automated operation, convenience and reliability.
Description
Technical field:
The utility model relates to automobile with compressed natural gas air entraining substation technical field, and especially a kind of air entraining substation is from mending the voltage stabilizing gas filled device.
Background technology:
By standard GB 50156--2002 (version in 2006) " automobile fuel filler gas station design and construction standard " regulation, the compression natural gas air entraining substation can use gas cylinder group or gas well that the high, medium and low three group gas storages of volume ratio as 1:2:3 are set.The volume minimum of high pressure air reservoir only is 1/6 of a substation air reservoir capacity, but can its pressure have determined the external gas filed top pressure of air entraining substation reach the rated pressure scope.So when the fortune tank car was supplied gas to air entraining substation, the substation compressor all was that the sequence control according to high, medium and low voltage puts on the air to the substation gas storage, at first make the high-pressure gas storehouse reach behind the authorized pressure it, and then centering, low gas storage inflation.
But after the fortune tank car leaves, do not have under the state of external air source, though the substation compressor is housed, account for substation gas storage total volume 5/6 in, low pressure gas storage can't add to the high-pressure gas storehouse.When air entraining substation continued additional gas, high-pressure gas storehouse pressure still constantly descended, and externally can't keep the rated pressure scope, influences the air entraining substation normal operation.
Summary of the invention:
The purpose of this utility model is to overcome the deficiency of existing secondary gas refueling station, provides a kind of air entraining substation from mending the voltage stabilizing gas filled device.The purpose of this utility model is achieved in that air entraining substation is exactly not have under the state of source of the gas outside the station from mending the voltage stabilizing gas filled device, utilize low, middle pressure gas storage own in the station to be followed successively by the high-pressure gas storehouse and do additionally, make pressure remain on rated range additional gas.Its device is mainly by the substation compressor, and the high, medium and low voltage gas storage refills road system and filling machine certainly and is formed by connecting.
The substation compressor is equipped with sequence control dish and overvoltage stoppage protection device, and exhaust gas pressure is 20-25MP
aFreeing pipe is the high, medium and low voltage gas supply electromagnetic valve by the sequence control dish respectively, the high, medium and low voltage gas supply line that connects high, medium and low voltage gas storage and filling machine, air inlet pipe connects check valve, pressure transformer and external interface successively, pressure transformer sends signal during outer source of the gas at station not, makes oneself refill road system self-opening; The high, medium and low voltage gas storage is equipped with pressure transformer respectively, low, middle pressure gas storage connects the substation compressor inleting pipe by low, the middle hydraulic circuit electromagnetic valve that refills the road system certainly respectively, outside having the station, under the state of source of the gas, do not mend the air reservoir of voltage stabilizing aerating certainly as air entraining substation successively; From refilling the road system by the pressure transformer that is contained in respectively on the high, medium and low voltage gas storage, in in being connected on respectively, between low pressure gas storage and the substation compressor inleting pipe, the low tension loop electromagnetic valve, connect to form with the electric control panel of benefit certainly with the interlock of sequence control dish, the interlock circuit of the signal of circuit electromagnetic valve and pressure transformer and sequence control dish all inserts from mending electric control panel, link successively during operation with the gas supply electromagnetic valve of low, middle pressure gas storage close, the circuit electromagnetic opening of valves, switch pressure can be adjusted; Whole device can adopt the module assembling; The substation gas storage can be provided with many group skid gas cylinder groups, corresponding pressure boost transmitter and circuit electromagnetic valve in refilling the road system certainly simultaneously.
Air entraining substation is before mending the voltage stabilizing gas filled device and bringing into use, and the high, medium and low voltage gas storage of substation should be inflated in advance, and the air pressure in high-pressure gas storehouse should reach rated pressure 20-25MP
a, filling machine is externally inflated to be reached rated range.
When air entraining substation from mending voltage stabilizing gas filled device external interface not during the outer source of the gas connection in station, pressure transformer sends signal from mending the electric control panel self-opening, the low tension loop electromagnetic valve that connects the compressor inleting pipe line is open-minded, the interlock of the dish of sequence control simultaneously, close the inflation electromagnetic valve of low pressure gas storage, start the substation compressor.Do source of the gas with low pressure gas storage own in standing this moment, for the high-pressure gas storehouse replenishes gas, makes high-pressure gas storehouse pressure continue to remain on the rated pressure scope through the substation compressor, continues additional gas for filling machine.
When low pressure gas storage hypotony can't be utilized, the pressure voltage transformer sent signal, mended the interlock of electric control panel and sequence control dish certainly, closed the inflation electromagnetic valve of low tension loop electromagnetic valve and middle pressure gas storage, hydraulic circuit electromagnetic valve in opening.Do source of the gas with middle pressure gas storage own in standing this moment, for the high-pressure gas storehouse replenishes gas, makes high-pressure gas storehouse pressure continue to remain on the rated pressure scope through the substation compressor, continues additional gas for filling machine.Until the external air source supply is arranged.
Air entraining substation replenishes external air source and keeps the specified device that adds atmospheric pressure and compare with existing only depending on from mending the voltage stabilizing gas filled device, only increase few parts and can improve the station equipment degree of utilization, prolong the work-hours that air entraining substation keeps rated pressure, extend the distance of offering between the mothers and sons station, that improves the fortune tank car unloads gas efficient, save power consumption, reduce operating cost.Simple in structure, simple installation, automatic operating, convenient and reliable.Can effectively improve gas taking rate when using skid gas cylinder group, improve fortune efficient.
Description of drawings:
Accompanying drawing is that air entraining substation is from mending voltage stabilizing gas filled device structural representation.
Among the figure:
1, substation compressor 2, the bypass electromagnetic valve of sequence control dish are housed
3, high-pressure air feed electromagnetic valve 4, medium pressure supply electromagnetic valve 5, low pressure gas supply electromagnetic valve
6, pressure transformer 7, pressure transformer 8, pressure transformer
9, low tension loop electromagnetic valve 10, middle hydraulic circuit electromagnetic valve 11, mend electric control panel certainly
12, check valve 13, pressure transformer 14, external tapping
15, filling machine 16, tank car
A, high-pressure gas storehouse B, middle pressure gas storage C, low pressure gas storage
The specific embodiment explanation:
In above accompanying drawing, substation compressor 1 is equipped with sequence control dish and overvoltage stoppage protection device, and exhaust gas pressure is 20-25MP
aThe freeing pipe of substation compressor 1 is the high, medium and low voltage gas supply electromagnetic valve 3,4,5 by the sequence control dish respectively, the high, medium and low voltage gas supply line that connects high, medium and low voltage gas storage A, B, C and filling machine 15, the air inlet pipe of substation compressor 1 connects check valve 12 successively, pressure transformer 13 and external interface 14, pressure transformer sends signal during outer source of the gas at station not, makes oneself refill road system self-opening; High, medium and low voltage gas storage A, B, C are equipped with pressure inverting gas device 6,7,8 respectively, low, middle pressure gas storage C, B connect the air inlet pipe of substation compressor 1 respectively by low, the middle hydraulic circuit electromagnetic valve 9,10 that refills the road system certainly, outside having the station, under the state of source of the gas, do not mend the air reservoir of voltage stabilizing aerating certainly as air entraining substation successively; From refilling the road system by being contained in height respectively, in, low pressure gas storage A, B, pressure transformer 6 on the C, 7,8, in being connected on respectively, low pressure gas storage B, middle hydraulic circuit electromagnetic valve 10 between the air inlet pipe of C and substation compressor 1, low tension loop electromagnetic valve 9, connect to form with the electric control panel of benefit certainly 11 with the interlock of sequence control dish, circuit electromagnetic valve 9,10 and pressure transformer 6,7, the interlock circuit of 8 signal and sequence control dish all inserts from mending electric control panel 11, link successively during operation low, the middle gas storage C that presses, the gas supply electromagnetic valve of B closes 5,4, circuit electromagnetic valve 9,10 open, and switch pressure can be adjusted; Whole device can adopt the module assembling; The substation gas storage can be provided with many group skid gas cylinder groups, corresponding pressure boost transmitter and circuit electromagnetic valve in refilling the road system certainly simultaneously.
Claims (4)
1, air entraining substation is from mending the voltage stabilizing gas filled device, mainly by the substation compressor, high, in, the low pressure gas storage, be formed by connecting from refilling road system and filling machine, outside not having the station under the state of source of the gas, utilize have by oneself in the station low, the gas storage of middle pressure is followed successively by the high-pressure gas storehouse and does additional, make pressure remain on rated range to additional gas, it is characterized in that: the substation compressor is equipped with sequence control dish and overvoltage stoppage protection device, exhaust gas pressure is 20-25MPa, the freeing pipe of substation compressor is the height by the sequence control dish respectively, in, the low pressure gas supply electromagnetic valve, connect high, in, the height of low pressure gas storage and filling machine, in, the low pressure gas supply line, the air inlet pipe of substation compressor connects check valve successively, pressure transformer and external interface, pressure transformer sends signal during outer source of the gas at station not, makes oneself refill road system self-opening; The high, medium and low voltage gas storage is equipped with pressure transformer respectively, low, middle pressure gas storage connects the substation compressor inleting pipe by low, the middle hydraulic circuit electromagnetic valve that refills the road system certainly respectively, outside having the station, under the state of source of the gas, do not mend the air reservoir of voltage stabilizing aerating certainly as air entraining substation successively.
2, air entraining substation according to claim 1 is from mending the voltage stabilizing gas filled device, it is characterized in that: refill the road system certainly by being contained in height respectively, in, pressure transformer on the low pressure gas storage, in being connected on respectively, in between low pressure gas storage and the substation compressor inleting pipe, the low tension loop electromagnetic valve, connect to form with the electric control panel of benefit certainly with the interlock of sequence control dish, the interlock circuit of the signal of circuit electromagnetic valve and pressure transformer and sequence control dish all inserts from mending electric control panel, link successively during operation low, the middle gas supply electromagnetic valve of gas storage of pressing is closed, the circuit electromagnetic opening of valves, switch pressure can be adjusted.
3, air entraining substation according to claim 1 is characterized in that from mending the voltage stabilizing gas filled device: whole device can adopt the module assembling.
4, air entraining substation according to claim 1 is characterized in that from mending the voltage stabilizing gas filled device: the substation gas storage can be provided with many group skid gas cylinder groups, corresponding pressure boost transmitter and circuit electromagnetic valve in refilling the road system certainly simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201169996U CN201245140Y (en) | 2008-05-25 | 2008-05-25 | Secondary gas filling station self-complementing voltage-stabilizing charging apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201169996U CN201245140Y (en) | 2008-05-25 | 2008-05-25 | Secondary gas filling station self-complementing voltage-stabilizing charging apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201245140Y true CN201245140Y (en) | 2009-05-27 |
Family
ID=40728956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201169996U Expired - Fee Related CN201245140Y (en) | 2008-05-25 | 2008-05-25 | Secondary gas filling station self-complementing voltage-stabilizing charging apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201245140Y (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102506300A (en) * | 2011-11-02 | 2012-06-20 | 沈军 | Low-temperature gas cylinder unit skid |
CN109732959A (en) * | 2019-01-07 | 2019-05-10 | 赛轮(沈阳)轮胎有限公司 | Drum Isobarically Control tire moulding method and system in a kind of molding machine |
-
2008
- 2008-05-25 CN CNU2008201169996U patent/CN201245140Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102506300A (en) * | 2011-11-02 | 2012-06-20 | 沈军 | Low-temperature gas cylinder unit skid |
CN109732959A (en) * | 2019-01-07 | 2019-05-10 | 赛轮(沈阳)轮胎有限公司 | Drum Isobarically Control tire moulding method and system in a kind of molding machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101418907B (en) | High-pressure hydrogen supply system for exterior hydrogen feeding hydrogenation stations | |
CN109140226B (en) | Hydrogenation method suitable for 35MPa or 70MPa filling pressure | |
CN203082530U (en) | L-CNG (liquefied-compressed natural gas) station | |
CN106015926A (en) | Compressed hydrogen storage and charging system of hydrogen refueling station | |
CN201206726Y (en) | LCNG mobile charging stations system | |
CN202546249U (en) | Unpowered skid-mounted LNG (liquefied natural gas) filling station | |
CN202927471U (en) | Automobile gas filling sub-station system | |
CN101092917A (en) | Automobile fuel supply system | |
CN103148348A (en) | Electronic type CNG (Compressed Natural Gas) gas charging station sequence control panel | |
CN106195618A (en) | Hydrogenation stations double-compressor operation control system | |
CN106195619A (en) | Mechanical type hydrogenation stations hydrogen compression gas storage system | |
CN108613012A (en) | A kind of hydrogenation stations pneumatic type hydrogen compression gas storage system | |
CN101526055A (en) | Liquefied natural gas automobile gas self-pressurization gas supply system and technical control | |
CN100451438C (en) | Automatic gasifying and gas adding device for energy saving type gasifying natural gas | |
CN100542860C (en) | Secondary gas filling station self-complementing voltage-stabilizing charging method and device | |
CN201245140Y (en) | Secondary gas filling station self-complementing voltage-stabilizing charging apparatus | |
CN104676244A (en) | Vehicle fuel gas recycling and supplying device | |
CN204164652U (en) | A kind of LCNG gas station auxiliary gas feeder and the gas station comprising it | |
CN204387673U (en) | LNG skid gas station | |
CN201461562U (en) | Sac type power accumulator oil pressure device for large-sized pump station | |
CN202868303U (en) | Storage and gasification engineering output system of liquefied natural gas (LNG) accepting station | |
CN202708584U (en) | Gas filling system of fuel gas vehicle | |
CN2863574Y (en) | Fast-assembling type aerating sub-station device without compressor | |
CN101780940A (en) | Son-mother gas filling station | |
CN201391743Y (en) | Movable piston-type natural gas feeding substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090527 Termination date: 20110525 |