CN201239694Y - Equipment for manufacturing steel plastic composite pipe - Google Patents

Equipment for manufacturing steel plastic composite pipe Download PDF

Info

Publication number
CN201239694Y
CN201239694Y CNU2008201261456U CN200820126145U CN201239694Y CN 201239694 Y CN201239694 Y CN 201239694Y CN U2008201261456 U CNU2008201261456 U CN U2008201261456U CN 200820126145 U CN200820126145 U CN 200820126145U CN 201239694 Y CN201239694 Y CN 201239694Y
Authority
CN
China
Prior art keywords
preheating
steel
plastic composite
preheating furnace
composite pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201261456U
Other languages
Chinese (zh)
Inventor
李义财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008201261456U priority Critical patent/CN201239694Y/en
Application granted granted Critical
Publication of CN201239694Y publication Critical patent/CN201239694Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)

Abstract

The utility model relates to a pipe material manufacturing device for plastic-steel compound mineral, which comprises a plasticizing device, a solidifying device and a cooling device, wherein, the plasticizing device comprises a preheating device and a plastic dipping device. The utility model is characterized in that the plasticizing device can be divided into the preheating device and the plastic dipping device, the steel pipe is preheated at first, then the plastics dipping process is performed, by utilizing the heat degree of the steel pipe, the coating of macromolecule materials is even, compact and smooth, the combination degree of the macromolecule materials with the steel pipe is good, the adhesive force is strong, both the heating manner and the cooling manner adopt wind power, so as to avoid generating the chemical qualitative change caused by the steel pipe, and the product quality is good; in addition, the preheating device, the solidifying device and the cooling device adopt sealing structures, an insulating layer is arranged outside, the wind power is circularly utilized, and the energy is enormously saved. Therefore, the utility model provides a plastic-steel compound pipe material manufacturing device which has the advantages of energy conservation, simple operation, good quality of generative products, and good effect.

Description

The manufacturing equipment of steel-plastic composite pipe
Technical field
The utility model relates to a kind of plant equipment, specially refers to a kind of manufacturing equipment that is used to make steel-plastic composite pipe.
Background technology
Plastic coating technology for steel tube is present domestic state-of-the-art aseptic technic, plastic-coated steel and series of products thereof, according to working medium and condition of work, macromolecule anti-corrosive powder paint with different formulations, by special equipment it is coated on the metal surface equably, even at metal surface formation one deck after curing and plasticizing, densification, smooth plastic coating, become a kind of novel steel-plastics composite pipe, it integrates the resistance to chemical corrosion of the mechanical performance and the macromolecular material brilliance of steel excellence, has greatly prolonged the service life of steel pipe, has unique anti-corrosive properties, resistance to wear, no fouling helps superiority such as lubricated, anti-negative pressure, alternative plastics lined pipe, galvanized pipe, stainless steel tube, copper pipe etc.Yet the tubing that the manufacturing equipment of existing steel-plastic composite pipe is made is of poor quality, service time is short, existing plasticizing apparatus generally all is the macromolecular material pipe to be put into steel pipe heat with steel pipe, perhaps adopt the Steam Heating pressurization or adopt the injection machine injection moulding or spraying, make macromolecular material and steel pipe combine, the plastic coating of Sheng Chaning is inhomogeneous like this, effect is bad and also waste energy, complicated operating process.
The utility model content
The purpose of this utility model is the deficiency that exists in the existing Steel-plastic composite pipe manufacturing equipment, and a kind of energy savings, simple to operate, good product quality, effective Steel-plastic composite pipe manufacturing equipment are provided.
The technical solution of the utility model is: a kind of manufacturing equipment of steel-plastic composite pipe, comprise plasticizing apparatus, solidification equipment, cooling device, and described plasticizing apparatus comprises preheating device and soaks molding apparatus.
Preferably: described preheating device comprises preheating chamber and is arranged at the preheating furnace at preheating chamber top, the top of preheating chamber is provided with air inlet and air outlet, air outlet and air inlet with preheating furnace joins respectively, the air inlet place of preheating furnace is provided with intake stack, and the other end of intake stack extends to the bottom of preheating chamber; The both sides of preheating chamber are provided with into the steel pipe mouth and the tapping mouth of pipe; Be outside equipped with conveying device in the preheating chamber.
Preferably: described preheating device is a hermetically-sealed construction, and outer setting has heat-insulation layer; Be provided with two preheating furnaces in the preheating device.
Preferably: described conveying device comprises frame, is arranged at drive, drive motors and chain on the frame.
Preferably: described plastic soaking device comprises soaking to be moulded well and moulds the device of advertising that well is connected with soaking, describedly advertise the air compressor machine that device comprises peripheral hardware, be arranged at and soak the admission line of moulding well one side and soak the air inlet of moulding bottom, soak the air inlet of moulding bottom above be provided with one every grate, on grate, be placed with unidirectional isolation cloth.
Preferably: described solidification equipment comprises curing room and the preheating furnace that is arranged on the curing room, the top of curing room is provided with air inlet and air outlet, air outlet and air inlet with preheating furnace joins respectively, and the both sides of curing room are provided with inlet pipe material mouth and go out the tubing mouth.
Preferably: described curing room is a hermetically-sealed construction, and the outer setting of curing room and preheating furnace has heat-insulation layer; Preheating furnace is provided with 1.
Preferably: be provided with gas-operated thermal bath facility in the described preheating furnace, and be provided with lighting-up tuyere in a side of preheating furnace, a side of preheating furnace is provided with blower fan.
Preferably: described cooling device comprises frame, conveying equipment and blower fan.
Preferably: described cooling device is for what seal, and the top is provided with air outlet, is connected with solidification equipment by pipeline.
The beneficial effects of the utility model are: plasticizing equipment of the present utility model is divided into preheating device and soaks molding apparatus, earlier steel pipe is carried out preheating, soak then and mould, utilize the temperature of steel pipe, make the macromolecular material coating even, fine and close, smooth, good with the steel pipe combination degree, strong adhesion, and the heating and cooling mode is wind-force, can not cause that chemical qualitative change, good product quality take place steel pipe; Preheating device, solidification equipment, cooling device adopt the structure of sealing in addition, and the outside is provided with heat-insulation layer, and wind-force is recycling, has saved the energy greatly; Therefore the utility model provides a kind of energy savings, simple to operate, the good product quality of producing, effective Steel-plastic composite pipe manufacturing equipment.
Description of drawings
Fig. 1 is the structural representation of the utility model preheating device
Fig. 2 is the longitudinal section of the utility model preheating device
Fig. 3 soaks the structural representation of molding apparatus for the utility model
Fig. 4 soaks the longitudinal section of molding apparatus for the utility model
Fig. 5 is the structural representation of the utility model solidification equipment and cooling device
Fig. 6 is the longitudinal section of the utility model solidification equipment and cooling device
The specific embodiment
Below in conjunction with the description of drawings specific embodiment of the utility model:
A kind of manufacturing equipment of steel-plastic composite pipe comprises plasticizing apparatus, solidification equipment, cooling device, and described plasticizing apparatus comprises preheating device and soaks molding apparatus.Preheating device comprises preheating chamber 1 and is arranged at the preheating furnace 2 at preheating chamber 1 top, the top of preheating chamber 1 is provided with air inlet 4 and air outlet 4, air outlet 4 and air inlet 4 with preheating furnace 2 joins respectively, air inlet 4 places of preheating furnace 2 are provided with intake stack 7, and the other end of intake stack 7 extends to the bottom of preheating chamber 1; The both sides of preheating chamber 1 are provided with into the steel pipe mouth 5 and the tapping mouth of pipe 5, and preheating device is for what seal, and outer setting has heat-insulation layer 6; Be provided with two preheating furnaces 2 in the preheating device, be provided with gas-operated thermal bath facility 8 in the preheating furnace 2, and be provided with lighting-up tuyere 9 in a side of preheating furnace 2, a side of preheating furnace 2 is provided with blower fan 10; Be outside equipped with conveying device 3 in the preheating chamber 1, conveying device 3 comprises frame 18, is arranged at drive 11, drive motors 20 and chain 12 on the frame 18.Soaking molding apparatus comprises soaking and moulds well 14 and mould the device of advertising that well 14 is connected with soaking, describedly advertise the air compressor machine 15 that device comprises peripheral hardware, be arranged at and soak the admission line 16 of moulding well 14 1 sides and soak the air inlet 22 of moulding well 14 bottoms, soak the air inlet 22 of moulding well 14 bottoms above be provided with one every grate 15, on grate, be placed with unidirectional isolation cloth.The assimilation device comprises curing room 19 and the preheating furnace 2 that is arranged on the curing room 19, the top of curing room 19 is provided with air inlet 4 and air outlet 4, air outlet 4 and air inlet 4 with preheating furnace joins respectively, and the both sides of curing room 19 are provided with inlet pipe material mouth and go out the tubing mouth; Curing room 19 is for what seal, and the outer setting of curing room 19 and preheating furnace 2 has heat-insulation layer 6; Preheating furnace 2 is provided with 1; Be provided with gas-operated thermal bath facility 8 in the preheating furnace 2, and be provided with lighting-up tuyere 9 in a side of preheating furnace 2, a side of preheating furnace 2 is provided with blower fan 10.Described cooling device is a cooling chamber 21, and cooling chamber 21 comprises frame 18, conveying equipment and blower fan 10, and cooling chamber 21 is for what seal, and the top is provided with air outlet, is connected with solidification equipment by pipeline.
During work, before the steel pipe 13 usefulness pipe carrying trucks that surface derusting is handled well are transported to conveying device 3, and steel pipe 13 entered preheating chamber 1 with conveying device 3, light gas-operated thermal bath facility 8, start blower fan 10, hot blast is blown into preheating chamber 1,, thereby utilize hot blast to give steel pipe 13 heating heating in the cold wind suction preheating furnace 2 of preheating chamber 1; After heating finishes, with conveying device 3 steel pipe 13 is transported from preheating chamber 1, and steel pipe 13 is promoted in the driving 17 of soaking the molding apparatus top with elevator, driving drives steel pipe 13 and arrives and soak the top of moulding well 14 and steel pipe 13 let-downs are moulded well 14 to soaking, simultaneously, air compressor machine 15 work, air is moulded well 14 bottoms and upwards blown to be placed on and soak the macromolecule material powder of moulding in the well 14 from soaking, macromolecule material powder drops on the inside and outside wall of hot steel pipe 13 uniformly, under the effect of the temperature of steel pipe 13, make very tight that steel pipe 13 combines with macromolecular material; To soak then and mould the tubing of finishing and be transported in the curing room 19, it will be cured, and solidify the back that finishes and be delivered to cooling chamber 21 coolings by conveying device and get final product.Simultaneously, the hot-air of cooling chamber 21 tops being recovered to solidification equipment utilizes again.

Claims (10)

  1. The manufacturing equipment of 1 one kinds of steel-plastic composite pipes comprises plasticizing apparatus, solidification equipment, cooling device, it is characterized in that: described plasticizing apparatus comprises preheating device and soaks molding apparatus.
  2. The manufacturing equipment of 2 steel-plastic composite pipes as claimed in claim 1 is characterized in that: described preheating device comprises preheating chamber and is arranged at the preheating furnace at preheating chamber top; The top of preheating chamber is provided with air inlet and air outlet, and air outlet and the air inlet with preheating furnace joins respectively, and the air inlet place of preheating furnace is provided with intake stack, and the other end of intake stack extends to the bottom of preheating chamber, and a side of preheating furnace is provided with blower fan; The both sides of preheating chamber are provided with into the steel pipe mouth and the tapping mouth of pipe; Be outside equipped with conveying device in the preheating chamber.
  3. The manufacturing equipment of 3 steel-plastic composite pipes as claimed in claim 2 is characterized in that: described preheating device is a hermetically-sealed construction, and outer setting has heat-insulation layer; Be provided with two preheating furnaces in the preheating device.
  4. The manufacturing equipment of 4 steel-plastic composite pipes as claimed in claim 2 is characterized in that: described conveying device comprises frame, is arranged at drive, drive motors and chain on the frame.
  5. The manufacturing equipment of 5 steel-plastic composite pipes as claimed in claim 1, it is characterized in that: described plastic soaking device comprises soaking to be moulded well and moulds the device of advertising that well is connected with soaking, describedly advertise the air compressor machine that device comprises peripheral hardware, be arranged at and soak the admission line of moulding well one side and soak the air inlet of moulding bottom, soak the air inlet of moulding bottom above be provided with one every grate, on grate, be placed with unidirectional isolation cloth.
  6. The manufacturing equipment of 6 steel-plastic composite pipes as claimed in claim 1, it is characterized in that: described solidification equipment comprises curing room and the preheating furnace that is arranged on the curing room, the top of curing room is provided with air inlet and air outlet, air outlet and air inlet with preheating furnace joins respectively, one side of preheating furnace is provided with blower fan, and the both sides of curing room are provided with inlet pipe material mouth and go out the tubing mouth.
  7. The manufacturing equipment of 7 steel-plastic composite pipes as claimed in claim 6 is characterized in that: described curing room is a hermetically-sealed construction, and the outer setting of curing room and preheating furnace has heat-insulation layer; Preheating furnace is provided with 1.
  8. 8 manufacturing equipments as claim 3 or 7 described steel-plastic composite pipes is characterized in that: be provided with gas-operated thermal bath facility in the described preheating furnace, and be provided with lighting-up tuyere in a side of preheating furnace.
  9. The manufacturing equipment of 9 steel-plastic composite pipes as claimed in claim 1 is characterized in that: described cooling device comprises frame, conveying equipment and blower fan.
  10. The manufacturing equipment of 10 steel-plastic composite pipes as claimed in claim 9 is characterized in that: described cooling device is for what seal, and the top is provided with air outlet, is connected with solidification equipment by pipeline.
CNU2008201261456U 2008-06-20 2008-06-20 Equipment for manufacturing steel plastic composite pipe Expired - Fee Related CN201239694Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201261456U CN201239694Y (en) 2008-06-20 2008-06-20 Equipment for manufacturing steel plastic composite pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201261456U CN201239694Y (en) 2008-06-20 2008-06-20 Equipment for manufacturing steel plastic composite pipe

Publications (1)

Publication Number Publication Date
CN201239694Y true CN201239694Y (en) 2009-05-20

Family

ID=40712984

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201261456U Expired - Fee Related CN201239694Y (en) 2008-06-20 2008-06-20 Equipment for manufacturing steel plastic composite pipe

Country Status (1)

Country Link
CN (1) CN201239694Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513270A (en) * 2011-12-20 2012-06-27 青岛宏基业塑料挤出设备有限公司 Vertical type production line of steel-plastic composite pipe
CN106622850A (en) * 2016-11-25 2017-05-10 重庆澳菱工贸有限公司 Compensation chain plastic dipping process
CN107866359A (en) * 2017-12-20 2018-04-03 南通亿思特机器人科技有限公司 One kind leaching modeling compensated chain production equipment
CN112046013A (en) * 2020-09-14 2020-12-08 安源管道实业股份有限公司 Auxiliary equipment for welding process of steel-plastic composite pipe product in construction in severe cold climate

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513270A (en) * 2011-12-20 2012-06-27 青岛宏基业塑料挤出设备有限公司 Vertical type production line of steel-plastic composite pipe
CN102513270B (en) * 2011-12-20 2015-04-08 青岛宏基业塑料挤出设备有限公司 Vertical type production line of steel-plastic composite pipe
CN106622850A (en) * 2016-11-25 2017-05-10 重庆澳菱工贸有限公司 Compensation chain plastic dipping process
CN107866359A (en) * 2017-12-20 2018-04-03 南通亿思特机器人科技有限公司 One kind leaching modeling compensated chain production equipment
CN112046013A (en) * 2020-09-14 2020-12-08 安源管道实业股份有限公司 Auxiliary equipment for welding process of steel-plastic composite pipe product in construction in severe cold climate

Similar Documents

Publication Publication Date Title
CN102513270B (en) Vertical type production line of steel-plastic composite pipe
CN201239694Y (en) Equipment for manufacturing steel plastic composite pipe
CN101725774B (en) Mine wear-resistant composite metal plastic pipe, special preparation equipment thereof and preparation method thereof
CN101862725A (en) Steel-plastic composite pipe spraying device
CN203316338U (en) Novel intelligent full-automatic steel tube inside and outside plastic coating production line
CN106907530B (en) A kind of inner lining plastic tube metal tube and its manufacture method
CN201239702Y (en) Preheating apparatus for manufacturing steel plastic composite pipe
CN202962794U (en) Automatic production device of coating plastic steel pipe
CN101303096A (en) Equipment for manufacturing steel plastic composite pipe as well as method for manufacturing steel plastic composite pipe
CN102825808B (en) The processing technology of nanoscale polyurethane composite steel tube
CN202290476U (en) Inner and outer wall spray coating system of fusion bonded epoxy powder steel pipe
CN101695691B (en) Method for coating polyethylene isolation layer on inner walls of steel pipes for ship
CN1962735B (en) High-performance energy-saving waste rubber cracking apparatus
CN103985483A (en) Enameled wire coating device and method
CN209229163U (en) A kind of outer plastic-coated lining plastic metal composite pipe
CN202290504U (en) Curing, leveling and cooling device of vertical steel-plastic composite pipe
CN201239695Y (en) Plastic coating apparatus for manufacturing steel plastic composite pipe
CN202460942U (en) Preheating device for plastic-steel composite pipe
CN207811815U (en) A kind of high-efficiency heat treatment device for fastening parts of automobiles
CN102451816A (en) Power threading tube manufacturing method
CN210754959U (en) Lost foam casting cold glue bonding and microwave drying equipment
CN2663891Y (en) Stainless steel plate drying apparatus
CN101526164B (en) Multilayer heat insulation pipe and manufacturing method thereof
CN202176833U (en) Automatic repair production line of a plastic coated composite tube
CN207887474U (en) A kind of leaching modeling compensation chain production equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090520

Termination date: 20120620