CN201236530Y - Fast enclosure for urban construction site - Google Patents
Fast enclosure for urban construction site Download PDFInfo
- Publication number
- CN201236530Y CN201236530Y CNU2008201274598U CN200820127459U CN201236530Y CN 201236530 Y CN201236530 Y CN 201236530Y CN U2008201274598 U CNU2008201274598 U CN U2008201274598U CN 200820127459 U CN200820127459 U CN 200820127459U CN 201236530 Y CN201236530 Y CN 201236530Y
- Authority
- CN
- China
- Prior art keywords
- barrier
- quick
- job site
- fixed mount
- construction site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model relates to the construction field, particularly to a quick barrier used on a construction site. The improvements of the quick barrier lie in that a color steel plate is closely mounted on a square frame by rivets to form barrier plates; the barrier plates are hung on a clamping slot of a prefabricated fixing frame fixed on the ground by using a chuck or a reinforcing steel bar head; and the barrier plates are connected with each other through U-shaped inserts. The barrier has the characteristics as follows: (1) the prefabricated fixing frame is adopted to support the barrier plates, the barrier saves materials, time and labor, and has the advantages of simple operation, convenient assembly and disassembly, high setting speed, no restraint of field condition, and good closure effect of the construction site; (2) the barrier has high industrializing prefabrication and a small field workload; (3) the barrier is used in a returnable manner, has a low breakage rate, reduces cost, and has great social benefit and great economic benefit.
Description
Technical field
The utility model relates to the realm of building construction, especially relates to the quick enclosing of a kind of construction site.
Background technology
Current, the job site enclosing mainly is to utilize scaffold as support system, and the fixing lumps of wood on supporting is fixed on color steel on the lumps of wood with screw or iron wire.This mounting method is original, speed is slow, a large amount of wastes material and manpower, cause construction cost height, weak effect.
The utility model content
The purpose of this utility model just provides the quick enclosing in a kind of novel job site, has simple to operately, easy to loading and unloading, installs fireballing characteristics.
For achieving the above object, the utility model adopts following technical scheme: the quick enclosing in this job site, and its improvements are: color steel tightly fits to rivet forms surrounding baffle on the quadra; Surrounding baffle is suspended on the draw-in groove of prefabricated fixed mount, and prefabricated fixed mount fixes on the ground with timber wedge, steel bar end or expansion bolt; Connect with the U-shaped plug-in unit between the surrounding baffle.
Further improvement in the technical proposal one is: described quadra adopts 30 * 30 square steel to be processed into " day word " shape square frame, at four jiaos of places of framework, is close to the circular slot that an internal diameter 12mm is respectively welded at the inboard place of the right and left.The position of each slot will be on the same horizon, its upper-lower position symmetry.
Further improvement in the technical proposal two is: the width of described fixed mount draw-in groove will be complementary with the square steel width of insertion quadra.
Further improvement in the technical proposal three is: described U-shaped plug-in unit diameter will be complementary with the slot diameter.
The quick enclosing in the utility model job site has following characteristics: 1. adopt prefabricated fixed mount to support surrounding baffle, it is simple to operate, easy to loading and unloading, the speed that installs is fast, and economical with materials, constraint, job site closure time saving and energy saving, that be not subjected to field condition are good; 2. the prefabricated property of batch production is strong, the site work amount is little; 3. turnover is used, breakage rate is low, reduced cost.Social benefit and good in economic efficiency.
Description of drawings
Fig. 1 is the elevation of the utility model surrounding baffle;
Fig. 2 is the sectional view of the utility model surrounding baffle;
Fig. 3 is the phantom drawing of the prefabricated fixed mount of the utility model;
Fig. 4 is the utility model U-shaped plug-in unit sectional view;
Each label list is shown among the figure:
1. " day " font square tube framework; 2. cylindrical pocket; 3. color steel; 4. draw-in groove; 5. prefabricated fixed mount.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further detail.
See also Fig. 1 to shown in Figure 4, it is simple to operate, easy to loading and unloading that quick enclosing is installed at the construction field (site), and the speed that installs is fast, of the present utility model being constructed as follows among the figure:
1, color steel 3 usefulness rivets is tightly fitted on the quadra 1.At 1 four jiaos of places of framework, be close to the circular slot 2 that an internal diameter 12mm is respectively welded at the inboard place of the right and left.The position of each slot 2 will be on the same horizon, its upper-lower position symmetry.The section of color steel 3 the right and lefts will be in the trough place.
2, prefabricated fixed mount 5 is put the precalculated position along the line.In order to prevent that external force collision from toppling over, laterally inboard with timber wedge, steel bar end or the vertical stickfast of expansion bolt on the ground at square steel at fixed mount 5 bases carries out further fixing to support 5.
3, surrounding baffle is put on the fixed mount 5, two draw-in grooves 4 (note that a draw-in groove 4 is respectively arranged up and down, the width of draw-in groove 4 will be complementary with the square steel width that is inserted) that framework 1 centre and two crossbeams in bottom will be put into fixed mount make it fixing intact.
4, U type plug-in unit (as Fig. 4) is inserted from the top down in two adjacent color steel slots 2 (U type plug-in unit diameter will be complementary with slot 2 diameters), make between the surrounding baffle closely to connect.
Claims (4)
1, the quick enclosing in job site is characterized in that: color steel tightly fits to rivet forms surrounding baffle on the quadra; Surrounding baffle is suspended on the draw-in groove of prefabricated fixed mount, and prefabricated fixed mount fixes on the ground with timber wedge, steel bar end or expansion bolt; Connect with the U-shaped plug-in unit between the surrounding baffle.
2, the quick enclosing in job site as claimed in claim 1 is characterized in that: described quadra adopts 30 * 30 square steel to be processed into " day word " shape square frame, at four jiaos of places of framework, is close to the circular slot that an internal diameter 12mm is respectively welded at the inboard place of the right and left.The position of each slot will be on the same horizon, its upper-lower position symmetry.
3, the quick enclosing in job site as claimed in claim 1 is characterized in that: the width of described fixed mount draw-in groove will be complementary with the square steel width of the quadra that is inserted.
4, the quick enclosing in job site as claimed in claim 1 is characterized in that: described U-shaped plug-in unit diameter will be complementary with the slot diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201274598U CN201236530Y (en) | 2008-07-23 | 2008-07-23 | Fast enclosure for urban construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201274598U CN201236530Y (en) | 2008-07-23 | 2008-07-23 | Fast enclosure for urban construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201236530Y true CN201236530Y (en) | 2009-05-13 |
Family
ID=40649270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201274598U Expired - Fee Related CN201236530Y (en) | 2008-07-23 | 2008-07-23 | Fast enclosure for urban construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201236530Y (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101787819A (en) * | 2010-03-03 | 2010-07-28 | 徐州九鼎建设集团有限公司 | Self-supporting movable fence |
CN103334633A (en) * | 2013-07-15 | 2013-10-02 | 林锋 | Hidden column type polypropylene hollow enclosing and blocking partition plate |
CN106088808A (en) * | 2016-06-22 | 2016-11-09 | 上海建工七建集团有限公司 | Tool-type temporary construction fence and installation method thereof |
CN111705580A (en) * | 2020-06-10 | 2020-09-25 | 四川轻化工大学 | Green dust-settling environment-friendly construction structure for road and construction method thereof |
-
2008
- 2008-07-23 CN CNU2008201274598U patent/CN201236530Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101787819A (en) * | 2010-03-03 | 2010-07-28 | 徐州九鼎建设集团有限公司 | Self-supporting movable fence |
CN103334633A (en) * | 2013-07-15 | 2013-10-02 | 林锋 | Hidden column type polypropylene hollow enclosing and blocking partition plate |
CN103334633B (en) * | 2013-07-15 | 2015-06-24 | 林锋 | Hidden column type polypropylene hollow enclosing and blocking partition plate |
CN106088808A (en) * | 2016-06-22 | 2016-11-09 | 上海建工七建集团有限公司 | Tool-type temporary construction fence and installation method thereof |
CN111705580A (en) * | 2020-06-10 | 2020-09-25 | 四川轻化工大学 | Green dust-settling environment-friendly construction structure for road and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201236530Y (en) | Fast enclosure for urban construction site | |
CN209817088U (en) | Prefabricated balcony of assembled | |
CN204703500U (en) | Assembled architecture construction novel support system | |
CN203050097U (en) | Cast-in-place slab beam frame | |
CN205421939U (en) | Concrete placement chute structure | |
CN201762994U (en) | Combined formwork-supporting frame | |
CN101338619B (en) | Mould for manufacturing methane tank | |
CN210317357U (en) | Mineral engineering tunnel supporting construction | |
CN201699020U (en) | Photovoltaic module combination frame | |
CN204456936U (en) | A kind of combined type faces frontier defense retaining frame body | |
CN204456850U (en) | Just dismounting building floor mould bracing frame and mould disposed thereon | |
CN202055501U (en) | Construction platform for connecting central silo and conic silo of cement storage | |
CN211377934U (en) | Photovoltaic support | |
CN211772596U (en) | Paver hanging wire device | |
CN203160729U (en) | Steel pallet supporting power transmission system | |
CN211565842U (en) | Combined type steel bar stacking rack | |
CN202422650U (en) | Eight-board two-map conventionalized structure device for construction site | |
CN218276534U (en) | Prefabricated integral type photovoltaic array | |
CN207363256U (en) | A kind of type quick detaching beam bottom mother plate supporting rack | |
CN216587631U (en) | Fixing support of platform edge horizontal safety net | |
CN216583916U (en) | Installation gallows of wall skin purlin | |
CN215055585U (en) | Concrete frame structure face limit safety device | |
CN205070881U (en) | Solar bracket | |
CN213263284U (en) | Material frame is assembled fast to socket joint formula | |
CN218933616U (en) | Raft foundation guide wall hanging die supporting limiting bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090513 Termination date: 20160723 |