CN201232344Y - Overhanging external frame puller wire rope embedded system - Google Patents
Overhanging external frame puller wire rope embedded system Download PDFInfo
- Publication number
- CN201232344Y CN201232344Y CNU2008201176805U CN200820117680U CN201232344Y CN 201232344 Y CN201232344 Y CN 201232344Y CN U2008201176805 U CNU2008201176805 U CN U2008201176805U CN 200820117680 U CN200820117680 U CN 200820117680U CN 201232344 Y CN201232344 Y CN 201232344Y
- Authority
- CN
- China
- Prior art keywords
- wire rope
- steel
- embedded system
- utility
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a cantilevered external frame lifting wire rope embedded system, which belongs to the technique field of building operations. The embedded system comprises a wire rope, a rim girder, a burning wire and a steel I-beam, the part of the wire rope extending out of the rim girder is square-crossed and fixed with a main bar at the upper part of the rim girder obliquely by adopting the burning wire, and the inclined drawing part of the wire rope and the wire rope at the part of the steel I-beam are on the same plane. The utility model provides the novel external frame lifting wire rope embedded system, solving the problems that the investment in steel pipes and jigs is high, the embedding part is abnormal in construction, and the hidden trouble of water seepage exists.
Description
Technical field
The utility model belongs to technical field of building construction, is specifically related to a kind of outrigger of encorbelmenting and lifts the wire rope embedded system.
Background technology
Often apply to encorbelment outrigger and integral lifting rack in the high-building construction, know by contrasting us, the integral lifting rack expense is higher to be applicable to that more than the building height 60m, the building that the single building area is less, elevation of building is the plane is more.At present general high-building construction is commonly used is the outrigger of encorbelmenting.
Encorbelment outrigger in construction, and the method that lifts conventional application of wire rope is before next floor concreting, pre-buried short steel pipes (about 50mm), and spacing is generally selected 1500mm.After steel pipe is buried underground, adopt wire rope one end to be buckled on the steel pipe, an end is buckled on the steel I-beam of encorbelmenting, and realizes the unloading to the outrigger of encorbelmenting.Construction has following shortcoming like this, and the steel pipe waste is big, and wire rope anchor clamps input is many; Its two, carrying out masonry when construction, pre-buried position can not normal construction, construction is to stay to establish the steel pipe position and build with pea gravel concreten at last usually, complex procedures is time-consuming; Its three, reserve the masonry construction of steel pipe position and finish the back and have the hidden danger that seeps water.
The utility model content
In order to overcome the deficiency of existing technology, the utility model has overcome above-mentioned three shortcomings, proposes new outrigger and lifts the pre-buried technology of wire rope, has eliminated that steel pipe and anchor clamps have high input, pre-buried position can not normal construction, have the problem of infiltration hidden danger.
The utility model comprises: wire rope, frame beam, burn silk and steel I-beam, described wire rope stretches out frame Liang Chu and frame beam top master's muscle to be adopted and burns a diagonal cross and be cross and fix.
The oblique pull portion of described wire rope and steel I-beam place wire rope are at grade.
Realize that concrete steps of the present utility model are:
1) the outrigger rope capacity of encorbelmenting is calculated, is undertaken by following formula:
Outrigger rope capacity=L1+L2+L3 encorbelments
--wire rope inclined segment length
L2=h+10d--pre-buried rope capacity in the frame beam
The H--story height
The L--i iron length of encorbelmenting
H-frame beam deck-molding
The d-wirerope diameter
2), pre-buried rope capacity h+10d in the frame beam, steel cord ends is removed oil in the pre-buried length range.
3), carry out blanking, according to calculated length L then wire rope is carried out pre-buried fixing.Wire rope stretches out frame Liang Chu and frame beam top master's muscle to be adopted 22# to burn a silk diagonal cross to be cross and to fix, make the assurance of oblique rollering steel silk rope and steel I-beam place wire rope at grade.
4), step into the pre-buried short steel pipes of row and be connected with external scaffolding by " building operations fastener type steel pipe scaffold technical specification of security " wall-connecting piece requirement two step three.
5), build the floor concrete, treat concreting after intensity reach 15MPa, the installation of promptly carrying out steel I-beam lifts.
6), the PVC sleeve pipe is passed wire rope, be fixed on wire rope and frame beam handing-over position, prevent steel rope abrasion.
7), after the steel I-beam installation, adopt the wire rope clamp specially and anchor clamps are fastening unloads.
The utlity model has following beneficial effect: the outrigger of encorbelmenting that the utility model provides lifts the wire rope embedded system, propose new outrigger and lift the pre-buried technology of wire rope, eliminated that steel pipe and anchor clamps have high input, pre-buried position can not normal construction, have the problem of infiltration hidden danger.
Description of drawings
Fig. 1-1 is the utility model overall schematic;
Fig. 1-2 lifts the i iron schematic diagram for the utility model;
Fig. 1-3 goes out fixedly schematic diagram of frame beam colligation for the utility model wire rope;
Fig. 1-4 is the pre-buried wire rope contact of a utility model schematic diagram.
The specific embodiment
The utility model will be further described below in conjunction with accompanying drawing.Fig. 1-1 is the utility model overall schematic; Fig. 1-2 lifts the i iron schematic diagram for the utility model; 6 are depicted as the wire rope jig among Fig. 1-2.The utility model comprises: wire rope 1, frame beam 2, burn silk 3 and steel I-beam 4, described wire rope 1 stretches out frame Liang2Chu and frame beam top master's muscle to be adopted and burns 3 diagonal cross and be cross and fix, as Figure 1-3.Fig. 1-4 is the pre-buried wire rope contact of a utility model schematic diagram, and 7 are depicted as the PVC sleeve pipe among the figure.
The oblique pull portion of described wire rope and steel I-beam place wire rope are at grade.
Its concrete steps of the present utility model are:
1), determines wire rope specification and wire rope spacing.
2), before pre-buried i iron floor concreting, according to the pre-buried snap ring of vertical pole ' s span, during concreting, prevent to collide snap ring and produce displacement.
3) compressive strength reached 15MPa, the installation steel I-beam after, concreting was finished.
4), when carrying out next floor reinforcing bar binding,, in the frame beam, install, according to the single rope capacity of calculating that lifts wire rope is extended walk around at the bottom of the frame beam at the bottom of the frame beam fixing behind master's muscle with pricking silk.
5), treat concreting after intensity reach 15MPa, pass wire rope with the PVC sleeve pipe, the PVC casing clamp at frame beam and wire rope handing-over position, is prevented that wire rope from contacting the wire rope that weares and teares with concrete.Walk around the steel I-beam of encorbelmenting with the free end wire rope again, adopt the wire rope clamp specially and anchor clamps are fastening unloads.
Claims (2)
1, a kind of outrigger of encorbelmenting lifts the wire rope embedded system, it is characterized in that: described system comprises wire rope (1), frame beam (2), burns silk (3) and a steel I-beam (4), and described wire rope (1) stretches out frame Liang Chu to be adopted baked wheaten cake (a 3) diagonal cross to be cross with frame beam (2) top master's muscle to fix.
2, the outrigger of encorbelmenting according to claim 1 lifts the wire rope embedded system, it is characterized in that: the oblique pull portion of described wire rope (1) and steel I-beam (4) are located wire rope (1) at grade.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201176805U CN201232344Y (en) | 2008-06-13 | 2008-06-13 | Overhanging external frame puller wire rope embedded system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008201176805U CN201232344Y (en) | 2008-06-13 | 2008-06-13 | Overhanging external frame puller wire rope embedded system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201232344Y true CN201232344Y (en) | 2009-05-06 |
Family
ID=40618720
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008201176805U Expired - Fee Related CN201232344Y (en) | 2008-06-13 | 2008-06-13 | Overhanging external frame puller wire rope embedded system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201232344Y (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213707A (en) * | 2014-09-18 | 2014-12-17 | 中建三局第二建设工程有限责任公司 | Attaching and climbing device of full steel climbing frame in structure retraction part and installation method thereof |
-
2008
- 2008-06-13 CN CNU2008201176805U patent/CN201232344Y/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104213707A (en) * | 2014-09-18 | 2014-12-17 | 中建三局第二建设工程有限责任公司 | Attaching and climbing device of full steel climbing frame in structure retraction part and installation method thereof |
CN104213707B (en) * | 2014-09-18 | 2016-03-30 | 中建三局第二建设工程有限责任公司 | All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926916A (en) | Cable-stayed suspended combined supporting system and construction method based on intelligent monitoring | |
CN104480930B (en) | A kind of filling pile cage of reinforcement hangs fixing construction method | |
CN102877637B (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
CN110158937B (en) | Cradle hanging structure without support and counterweight and construction method thereof | |
CN203451050U (en) | Pile foundation reinforcing cage lifting rib | |
CN102733608B (en) | Construction method for spray head layer of granulation tower | |
CN216072749U (en) | Indoor track beam push type installation construction device | |
CN204982628U (en) | Horizontal pull rope bridge | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN107161879B (en) | Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane | |
CN201232344Y (en) | Overhanging external frame puller wire rope embedded system | |
CN206769199U (en) | After wear formula post stretching vertical prestressing cast-in-place concrete rod structure | |
CN201102883Y (en) | Steel cable sliding and lifting device | |
CN210178366U (en) | Scattered cable saddle portal system of narrow space tunnel anchor of super large inclination | |
CN105370027B (en) | The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure | |
CN206071063U (en) | High-pressure pump pipe jacking and pouring system for post-repair construction of super high-rise building | |
CN105040592B (en) | Horizontal pull rope bridge and erection method thereof | |
CN209779465U (en) | main tower erects cable-stay bridge's string cable construction system that changes | |
CN202785255U (en) | Turnover hoisting tool for reinforced concrete pipe joint | |
CN104746860A (en) | Water tank air cast-in-place method for inclined-pulling formwork of inverted cone water tower | |
CN104989092A (en) | Construction method of high-altitude overhang superposition type steel truss bearing platform | |
CN211735679U (en) | Urban sewage pipeline treatment device | |
CN202012079U (en) | Pile anchor for cable crane | |
CN108644471B (en) | Pipeline sliding transportation structure system on large-area water area and construction method thereof | |
CN205933011U (en) | Steel constructs aqueduct basis water brill construction mounting system in succession |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090506 Termination date: 20150613 |
|
EXPY | Termination of patent right or utility model |