CN201232344Y - Overhanging external frame puller wire rope embedded system - Google Patents

Overhanging external frame puller wire rope embedded system Download PDF

Info

Publication number
CN201232344Y
CN201232344Y CNU2008201176805U CN200820117680U CN201232344Y CN 201232344 Y CN201232344 Y CN 201232344Y CN U2008201176805 U CNU2008201176805 U CN U2008201176805U CN 200820117680 U CN200820117680 U CN 200820117680U CN 201232344 Y CN201232344 Y CN 201232344Y
Authority
CN
China
Prior art keywords
wire rope
steel
embedded system
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201176805U
Other languages
Chinese (zh)
Inventor
梁雄
周军
魏艳朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CNU2008201176805U priority Critical patent/CN201232344Y/en
Application granted granted Critical
Publication of CN201232344Y publication Critical patent/CN201232344Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a cantilevered external frame lifting wire rope embedded system, which belongs to the technique field of building operations. The embedded system comprises a wire rope, a rim girder, a burning wire and a steel I-beam, the part of the wire rope extending out of the rim girder is square-crossed and fixed with a main bar at the upper part of the rim girder obliquely by adopting the burning wire, and the inclined drawing part of the wire rope and the wire rope at the part of the steel I-beam are on the same plane. The utility model provides the novel external frame lifting wire rope embedded system, solving the problems that the investment in steel pipes and jigs is high, the embedding part is abnormal in construction, and the hidden trouble of water seepage exists.

Description

The outrigger of encorbelmenting lifts the wire rope embedded system
Technical field
The utility model belongs to technical field of building construction, is specifically related to a kind of outrigger of encorbelmenting and lifts the wire rope embedded system.
Background technology
Often apply to encorbelment outrigger and integral lifting rack in the high-building construction, know by contrasting us, the integral lifting rack expense is higher to be applicable to that more than the building height 60m, the building that the single building area is less, elevation of building is the plane is more.At present general high-building construction is commonly used is the outrigger of encorbelmenting.
Encorbelment outrigger in construction, and the method that lifts conventional application of wire rope is before next floor concreting, pre-buried short steel pipes (about 50mm), and spacing is generally selected 1500mm.After steel pipe is buried underground, adopt wire rope one end to be buckled on the steel pipe, an end is buckled on the steel I-beam of encorbelmenting, and realizes the unloading to the outrigger of encorbelmenting.Construction has following shortcoming like this, and the steel pipe waste is big, and wire rope anchor clamps input is many; Its two, carrying out masonry when construction, pre-buried position can not normal construction, construction is to stay to establish the steel pipe position and build with pea gravel concreten at last usually, complex procedures is time-consuming; Its three, reserve the masonry construction of steel pipe position and finish the back and have the hidden danger that seeps water.
The utility model content
In order to overcome the deficiency of existing technology, the utility model has overcome above-mentioned three shortcomings, proposes new outrigger and lifts the pre-buried technology of wire rope, has eliminated that steel pipe and anchor clamps have high input, pre-buried position can not normal construction, have the problem of infiltration hidden danger.
The utility model comprises: wire rope, frame beam, burn silk and steel I-beam, described wire rope stretches out frame Liang Chu and frame beam top master's muscle to be adopted and burns a diagonal cross and be cross and fix.
The oblique pull portion of described wire rope and steel I-beam place wire rope are at grade.
Realize that concrete steps of the present utility model are:
1) the outrigger rope capacity of encorbelmenting is calculated, is undertaken by following formula:
Outrigger rope capacity=L1+L2+L3 encorbelments
--wire rope inclined segment length
L2=h+10d--pre-buried rope capacity in the frame beam
Figure Y200820117680D00032
-wire rope is walked around i iron to free end length
The H--story height
The L--i iron length of encorbelmenting
H-frame beam deck-molding
The d-wirerope diameter
2), pre-buried rope capacity h+10d in the frame beam, steel cord ends is removed oil in the pre-buried length range.
3), carry out blanking, according to calculated length L then wire rope is carried out pre-buried fixing.Wire rope stretches out frame Liang Chu and frame beam top master's muscle to be adopted 22# to burn a silk diagonal cross to be cross and to fix, make the assurance of oblique rollering steel silk rope and steel I-beam place wire rope at grade.
4), step into the pre-buried short steel pipes of row and be connected with external scaffolding by " building operations fastener type steel pipe scaffold technical specification of security " wall-connecting piece requirement two step three.
5), build the floor concrete, treat concreting after intensity reach 15MPa, the installation of promptly carrying out steel I-beam lifts.
6), the PVC sleeve pipe is passed wire rope, be fixed on wire rope and frame beam handing-over position, prevent steel rope abrasion.
7), after the steel I-beam installation, adopt the wire rope clamp specially and anchor clamps are fastening unloads.
The utlity model has following beneficial effect: the outrigger of encorbelmenting that the utility model provides lifts the wire rope embedded system, propose new outrigger and lift the pre-buried technology of wire rope, eliminated that steel pipe and anchor clamps have high input, pre-buried position can not normal construction, have the problem of infiltration hidden danger.
Description of drawings
Fig. 1-1 is the utility model overall schematic;
Fig. 1-2 lifts the i iron schematic diagram for the utility model;
Fig. 1-3 goes out fixedly schematic diagram of frame beam colligation for the utility model wire rope;
Fig. 1-4 is the pre-buried wire rope contact of a utility model schematic diagram.
The specific embodiment
The utility model will be further described below in conjunction with accompanying drawing.Fig. 1-1 is the utility model overall schematic; Fig. 1-2 lifts the i iron schematic diagram for the utility model; 6 are depicted as the wire rope jig among Fig. 1-2.The utility model comprises: wire rope 1, frame beam 2, burn silk 3 and steel I-beam 4, described wire rope 1 stretches out frame Liang2Chu and frame beam top master's muscle to be adopted and burns 3 diagonal cross and be cross and fix, as Figure 1-3.Fig. 1-4 is the pre-buried wire rope contact of a utility model schematic diagram, and 7 are depicted as the PVC sleeve pipe among the figure.
The oblique pull portion of described wire rope and steel I-beam place wire rope are at grade.
Its concrete steps of the present utility model are:
1), determines wire rope specification and wire rope spacing.
2), before pre-buried i iron floor concreting, according to the pre-buried snap ring of vertical pole ' s span, during concreting, prevent to collide snap ring and produce displacement.
3) compressive strength reached 15MPa, the installation steel I-beam after, concreting was finished.
4), when carrying out next floor reinforcing bar binding,, in the frame beam, install, according to the single rope capacity of calculating that lifts wire rope is extended walk around at the bottom of the frame beam at the bottom of the frame beam fixing behind master's muscle with pricking silk.
5), treat concreting after intensity reach 15MPa, pass wire rope with the PVC sleeve pipe, the PVC casing clamp at frame beam and wire rope handing-over position, is prevented that wire rope from contacting the wire rope that weares and teares with concrete.Walk around the steel I-beam of encorbelmenting with the free end wire rope again, adopt the wire rope clamp specially and anchor clamps are fastening unloads.

Claims (2)

1, a kind of outrigger of encorbelmenting lifts the wire rope embedded system, it is characterized in that: described system comprises wire rope (1), frame beam (2), burns silk (3) and a steel I-beam (4), and described wire rope (1) stretches out frame Liang Chu to be adopted baked wheaten cake (a 3) diagonal cross to be cross with frame beam (2) top master's muscle to fix.
2, the outrigger of encorbelmenting according to claim 1 lifts the wire rope embedded system, it is characterized in that: the oblique pull portion of described wire rope (1) and steel I-beam (4) are located wire rope (1) at grade.
CNU2008201176805U 2008-06-13 2008-06-13 Overhanging external frame puller wire rope embedded system Expired - Fee Related CN201232344Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201176805U CN201232344Y (en) 2008-06-13 2008-06-13 Overhanging external frame puller wire rope embedded system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201176805U CN201232344Y (en) 2008-06-13 2008-06-13 Overhanging external frame puller wire rope embedded system

Publications (1)

Publication Number Publication Date
CN201232344Y true CN201232344Y (en) 2009-05-06

Family

ID=40618720

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201176805U Expired - Fee Related CN201232344Y (en) 2008-06-13 2008-06-13 Overhanging external frame puller wire rope embedded system

Country Status (1)

Country Link
CN (1) CN201232344Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213707A (en) * 2014-09-18 2014-12-17 中建三局第二建设工程有限责任公司 Attaching and climbing device of full steel climbing frame in structure retraction part and installation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213707A (en) * 2014-09-18 2014-12-17 中建三局第二建设工程有限责任公司 Attaching and climbing device of full steel climbing frame in structure retraction part and installation method thereof
CN104213707B (en) * 2014-09-18 2016-03-30 中建三局第二建设工程有限责任公司 All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure

Similar Documents

Publication Publication Date Title
CN105926916A (en) Cable-stayed suspended combined supporting system and construction method based on intelligent monitoring
CN104480930B (en) A kind of filling pile cage of reinforcement hangs fixing construction method
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN110158937B (en) Cradle hanging structure without support and counterweight and construction method thereof
CN203451050U (en) Pile foundation reinforcing cage lifting rib
CN102733608B (en) Construction method for spray head layer of granulation tower
CN216072749U (en) Indoor track beam push type installation construction device
CN204982628U (en) Horizontal pull rope bridge
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN107161879B (en) Attached wall provision for disengagement and its method for dismounting on rear side of derrick crane
CN201232344Y (en) Overhanging external frame puller wire rope embedded system
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN201102883Y (en) Steel cable sliding and lifting device
CN210178366U (en) Scattered cable saddle portal system of narrow space tunnel anchor of super large inclination
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN206071063U (en) High-pressure pump pipe jacking and pouring system for post-repair construction of super high-rise building
CN105040592B (en) Horizontal pull rope bridge and erection method thereof
CN209779465U (en) main tower erects cable-stay bridge's string cable construction system that changes
CN202785255U (en) Turnover hoisting tool for reinforced concrete pipe joint
CN104746860A (en) Water tank air cast-in-place method for inclined-pulling formwork of inverted cone water tower
CN104989092A (en) Construction method of high-altitude overhang superposition type steel truss bearing platform
CN211735679U (en) Urban sewage pipeline treatment device
CN202012079U (en) Pile anchor for cable crane
CN108644471B (en) Pipeline sliding transportation structure system on large-area water area and construction method thereof
CN205933011U (en) Steel constructs aqueduct basis water brill construction mounting system in succession

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090506

Termination date: 20150613

EXPY Termination of patent right or utility model