CN201228445Y CNU2008200680522U CN200820068052U CN201228445Y CN 201228445 Y CN201228445 Y CN 201228445Y CN U2008200680522 U CNU2008200680522 U CN U2008200680522U CN 200820068052 U CN200820068052 U CN 200820068052U CN 201228445 Y CN201228445 Y CN 201228445Y
Authority
CN
China
Prior art keywords
cushion block
shaped cushion
box
support column
thick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200680522U
Other languages
Chinese (zh)
Inventor
宋占江
杨汉斌
石教澜
方磊
郑伟国
尹志远
徐圣佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yiye Steel Structure Co Ltd
Original Assignee
Wuhan Yiye Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yiye Steel Structure Co Ltd filed Critical Wuhan Yiye Steel Structure Co Ltd
Priority to CNU2008200680522U priority Critical patent/CN201228445Y/en
Application granted granted Critical
Publication of CN201228445Y publication Critical patent/CN201228445Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a high level sliding installation device for a large-structure body, which is characterized by comprising a first support column, a first lifting jack, a second support column and a second lifting jack. The first support column comprises a first thin box-shaped cushion block, a second thin box-shaped cushion block and at least one first thick box-shaped cushion block arranged between the first thin box-shaped cushion block and the second thin box-shaped cushion block. The second support column comprises at least two superimposed second thick box-shaped cushion blocks. The structure of the second thick box-shaped cushion block is same as that of the first thick box-shaped cushion block, and the number of the second thick box-shaped cushion block in the second support column is one more than that of the first thick box-shaped cushion block in the first support column. In use, the first lifting jack is arranged between the base plate of the large-structure body and the second thick box-shaped cushion block on the uppermost side of the second support column. The high level sliding installation device has the advantages of simple structure and convenient installation.

Description

The empty slippage of macrostructure height installs a device
Technical field
The utility model relates to the empty slippage of macrostructure height and installs a device.
Background technology
In the empty slippage installation process of macrostructure height, the position that falls is one of critical process wherein to the basis, and this need of work uses a device to finish.
Summary of the invention
The purpose of this utility model is to provide the empty slippage of a kind of macrostructure height simple in structure, easy for installation to install a device.
To achieve these goals, the technical solution of the utility model is: the empty slippage of macrostructure height installs a device, and it is characterized in that: it comprises first support column, first jack, second support column, second jack; First support column comprises the first thin box-shaped cushion block, the second thin box-shaped cushion block, the first thick box-shaped cushion block, at least be provided with one first thick box-shaped cushion block between the first thin box-shaped cushion block and the second thin box-shaped cushion block, the thickness of the first thin box-shaped cushion block, the second thin box-shaped cushion block be respectively the first thick box-shaped cushion block thickness 1/2, the first thin box-shaped cushion block is shelved on the basis, the first thick box-shaped cushion block of below of first support column is shelved on the first thin box-shaped cushion block, and the second thin box-shaped cushion block is shelved on the first thick box-shaped cushion block of the top of first support column; Second support column comprises at least two second folded mutually thick box-shaped cushion blocks, and the second thick box-shaped cushion block of below is shelved on the basis; The structure of the second thick box-shaped cushion block is identical with the structure of the first thick box-shaped cushion block, and the number of the second thick box-shaped cushion block of second support column is Duoed one than the number of the first thick box-shaped cushion block of first support column; During use, first jack is arranged between the second thin box-shaped cushion block of the base plate of macrostructure body and first support column, and second jack is arranged between the second thick box-shaped cushion block of the top of the base plate of macrostructure body and second support column.
The beneficial effects of the utility model are:
1, simple being suitable for, but extensive use can be installed at structure, equipment installs and other structure installing area extensive uses, and is unrestricted, are particularly useful for using on the narrow and small basic space in high-altitude;
2, simple in structure, in light weight, easy for installation, this device is by a height size that falls, and the amount doesn't matterly carries out supportingly, in light weight, and convenient in carrying can realize single operation alone;
3, safe and reliable, efficient, structure is steadily fallen, do not produce shake, guarantee construction operation safety;
4, economy and durability, this device only need utilize steel to make, and need not special material, need not machine, and be with low cost.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is that the B of Fig. 1 is to view;
Among the figure: 1-basis (concrete post), the 2-first thin box-shaped cushion block, 3-first support column, the 4-first thick box-shaped cushion block, the 5-second thin box-shaped cushion block, 6-first jack, the base plate of 7-macrostructure body, 8-second support column, 9-block, 10-second jack, 11-macrostructure body (as roof truss), the 12-junction plate, 13-bolt, the 14-second thick box-shaped cushion block.
The specific embodiment
As shown in Figure 1 and Figure 2, the empty slippage of macrostructure height installs a device, and it comprises first support column 3, first jack 6, second support column 8, second jack 10; First support column 3 comprises the first thin box-shaped cushion block 2, the second thin box-shaped cushion block 5, the first thick box-shaped cushion block 4 (the first thick box-shaped cushion block 4 is 5 among Fig. 1), at least be provided with one first thick box-shaped cushion block 4 between the first thin box-shaped cushion block 2 and the second thin box-shaped cushion block 5, the first thin box-shaped cushion block 2, the thickness of the second thin box-shaped cushion block 5 be respectively the first thick box-shaped cushion block 4 thickness 1/2, the first thin box-shaped cushion block 2 is shelved on the basis 1, the first thick box-shaped cushion block of below of first support column 3 is shelved on the first thin box-shaped cushion block 2, and the second thin box-shaped cushion block 5 is shelved on the first thick box-shaped cushion block of the top of first support column 3; Second support column 8 comprises at least two folded mutually second thick box-shaped cushion blocks 14 (the second thick box-shaped cushion block 14 is 6 among Fig. 1), and the second thick box-shaped cushion block 14 of below is shelved on the basis 1; The structure of the second thick box-shaped cushion block 14 is identical with the structure of the first thick box-shaped cushion block 4, and the number of the second thick box-shaped cushion block 14 of second support column 8 is Duoed one than the number of the first thick box-shaped cushion block 4 of first support column 3; During use, first jack 6 is arranged between the second thin box-shaped cushion block 5 of the base plate 7 of macrostructure body and first support column 3, and second jack 10 is arranged between the second thick box-shaped cushion block 14 of the top of the base plate 7 of macrostructure body and second support column 8.
The described first thin box-shaped cushion block 2, the second thin box-shaped cushion block 5, the first thick box-shaped cushion block 4, the upper and lower side of the second thick box-shaped cushion block 14 is respectively equipped with junction plate 12, junction plate is provided with bolt hole, pass through junction plate between the first thin box-shaped cushion block 2 and the first thick box-shaped cushion block 4, bolt connects, pass through junction plate between the second thin box-shaped cushion block 5 and the first thick box-shaped cushion block 4, bolt connects, pass through junction plate between the first thick box-shaped cushion block 4 and the first thick box-shaped cushion block 4, bolt connects, and passes through junction plate between the second thick box-shaped cushion block 14 and the second thick box-shaped cushion block 14, bolt connects.
The combined altitudes of first support column 3 and first jack 6 equals height of drop, and the combined altitudes of second support column 8 and second jack 10 equals height of drop; The maximum ga(u)ge of first thick box-shaped cushion block 4, the second thick box-shaped cushion block 14 is not more than the range of jack, and the maximum height of contour of jack is not more than the distance of macrostructure body 11 installation site soffits to the basis.
Its operating principle is: earlier first support column 3, second support column 8 are placed on the basis, the most beneath one of first support column 3 is that first the most beneath of approaching box-shaped cushion block 2, the second support columns 8 is the second thick box-shaped cushion block 14; Arrived one deck topmost, one of the top of first support column 3 is that one of the top of second thin box-shaped cushion block 5, the second support columns 8 is the second thick box-shaped cushion block 14; The top of first support column 3, second support column 8 is on a horizontal plane, and each is listed as between the adjacent two box-shaped cushion blocks and links to each other with bolt.At last jack is placed on respectively on first support column 3, second support column, 8 tops, together as the load-bearing support column of top macrostructure body (as roof truss) 11, the impulse stroke of jack is about 150mm.
During operation, earlier with the equal jacking about 100mm that gets up of the jack (first jack 6, second jack 10) at the top of first support column 3, second support column 8, lift macrostructure body 11, stablize motionless, the dismantle former load-bearing bracing frame of macrostructure body 11 all drops on first support column 3, second support column 8 weight of macrostructure body 11; Again second jack 10 is continued jacking, regain its actuating rod after laying down the active force of first jack 6, first jack, 6 belows (with second jack, 10 next-door neighbours'), the first thin box-shaped cushion block is dismantled, first jack, 6 overheads are on following second cushion block (i.e. the first thick box-shaped cushion block 4), rise the operation bar to the range place, at this moment the 10 slow releases of second jack are made macrostructure body 11 fall, stressed until first jack, 6 tops, after treating that macrostructure body 11 loads all are added on first jack 6, regain second jack, 10 operation bars, dismantle the second thick box-shaped cushion block 14 below second jack 10, second jack 10 is moved down on second cushion block (the second thick box-shaped cushion block 14), rise actuating rod, repeat the action of first jack 6 again ... so repeatedly, up to structure is dropped on the installation site.

Claims (2)

1. the empty slippage of macrostructure height installs a device, and it is characterized in that: it comprises first support column (3), first jack (6), second support column (8), second jack (10); First support column (3) comprises the first thin box-shaped cushion block (2), the second thin box-shaped cushion block (5), the first thick box-shaped cushion block (4), at least be provided with one first thick box-shaped cushion block (4) between the first thin box-shaped cushion block (2) and the second thin box-shaped cushion block (5), the first thin box-shaped cushion block (2), the thickness of the second thin box-shaped cushion block (5) be respectively the first thick box-shaped cushion block (4) thickness 1/2, the first thin box-shaped cushion block (2) is shelved on the basis (1), the first thick box-shaped cushion block of below of first support column (3) is shelved on the first thin box-shaped cushion block (2), and the second thin box-shaped cushion block (5) is shelved on the first thick box-shaped cushion block of the top of first support column (3); Second support column (8) comprises at least two second folded mutually thick box-shaped cushion blocks (14), and the second thick box-shaped cushion block (14) of below is shelved on the basis (1); The structure of the second thick box-shaped cushion block (14) is identical with the structure of the first thick box-shaped cushion block (4), and the number of the second thick box-shaped cushion block (14) of second support column (8) is Duoed one than the number of the first thick box-shaped cushion block (4) of first support column (3); During use, first jack (6) is arranged between the second thin box-shaped cushion block (5) of the base plate (7) of macrostructure body and first support column (3), and second jack (10) is arranged between the second thick box-shaped cushion block (14) of the top of the base plate (7) of macrostructure body and second support column (8).
2. the empty slippage of macrostructure height according to claim 1 installs a device, it is characterized in that: the described first thin box-shaped cushion block (2), the second thin box-shaped cushion block (5), the first thick box-shaped cushion block (4), the upper and lower side of the second thick box-shaped cushion block (14) is respectively equipped with junction plate (12), junction plate is provided with bolt hole, pass through junction plate between the first thin box-shaped cushion block (2) and the first thick box-shaped cushion block (4), bolt connects, pass through junction plate between the second thin box-shaped cushion block (5) and the first thick box-shaped cushion block (4), bolt connects, pass through junction plate between the first thick box-shaped cushion block (4) and the first thick box-shaped cushion block (4), bolt connects, and passes through junction plate between the second thick box-shaped cushion block (14) and the second thick box-shaped cushion block (14), bolt connects.
CNU2008200680522U 2008-06-25 2008-06-25 Post apparatus for large structure body high altitude slipping installation apparatus Expired - Fee Related CN201228445Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200680522U CN201228445Y (en) 2008-06-25 2008-06-25 Post apparatus for large structure body high altitude slipping installation apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200680522U CN201228445Y (en) 2008-06-25 2008-06-25 Post apparatus for large structure body high altitude slipping installation apparatus

Publications (1)

Publication Number Publication Date
CN201228445Y true CN201228445Y (en) 2009-04-29

Family

ID=40633396

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200680522U Expired - Fee Related CN201228445Y (en) 2008-06-25 2008-06-25 Post apparatus for large structure body high altitude slipping installation apparatus

Country Status (1)

Country Link
CN (1) CN201228445Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113366A (en) * 2018-09-14 2019-01-01 武大巨成结构股份有限公司 It is a kind of to connect card slot type concrete column core cushion block and its application method for building jacking increasing layer
CN113536618A (en) * 2021-05-21 2021-10-22 沪东中华造船(集团)有限公司 Positioning method of large steel structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113366A (en) * 2018-09-14 2019-01-01 武大巨成结构股份有限公司 It is a kind of to connect card slot type concrete column core cushion block and its application method for building jacking increasing layer
CN109113366B (en) * 2018-09-14 2022-09-13 武大巨成结构股份有限公司 Use method of connecting clamping groove type concrete column core cushion block for building jacking storey-adding
CN113536618A (en) * 2021-05-21 2021-10-22 沪东中华造船(集团)有限公司 Positioning method of large steel structure

Similar Documents

Publication Publication Date Title
CN102146732B (en) Extra-large-area hyperboloid welding ball network frame sliding construction method
CN201501762U (en) Wedge-shape guide rail device for lifting platform
CN201228445Y (en) Post apparatus for large structure body high altitude slipping installation apparatus
CN201665992U (en) Whole lifting platform of large steel net frame
CN204455842U (en) Bridge precast beam plate plays roof beam structure
CN201538944U (en) Bridge maintaining device
CN217924945U (en) Large-span steel construction roofing truss hoists and uses displacement device
CN203715115U (en) Supporting point structure for self-hoisting system of portal crane
CN202450548U (en) Adjustable support for fundament of construction elevator on basement top plate
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN203295982U (en) Hanging basket lifting system
CN201296614Y (en) Eight-point hydraulic synchronous jacking device
CN202388183U (en) Lifting equipment for H-shaped steel numerical control cutting machine
CN101289849B (en) Large-scale combined dynamic compaction machinery
JP4792284B2 (en) Crane seismic isolation device
CN209923787U (en) Improved 0# block bracket prestress pre-pressing device
CN202830787U (en) Duplex beam for bridge construction
CN203373661U (en) Movable operation platform device below cantilever arm of steel-structure bridge
CN203361019U (en) T-beam lifting device for highway and railway bridge construction
CN112875550A (en) Hydraulic integral lifting device with hole large-span grid structure
CN201485236U (en) Construction lift working platform
CN215561946U (en) Door opening type support for installing and adjusting pre-buried steel plate of arch support
CN109458011A (en) A kind of steel-structure factory building of height lifting
CN211283561U (en) Can reduce formula hydraulic jacking device that stretches into of operation face
CN215165563U (en) Fixing device for constructional engineering piling

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090429

Termination date: 20140625

EXPY Termination of patent right or utility model