CN201226422Y - On-lever operating platform - Google Patents

On-lever operating platform Download PDF

Info

Publication number
CN201226422Y
CN201226422Y CNU2008200253518U CN200820025351U CN201226422Y CN 201226422 Y CN201226422 Y CN 201226422Y CN U2008200253518 U CNU2008200253518 U CN U2008200253518U CN 200820025351 U CN200820025351 U CN 200820025351U CN 201226422 Y CN201226422 Y CN 201226422Y
Authority
CN
China
Prior art keywords
pull rod
base
pedestal
platform
electric pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200253518U
Other languages
Chinese (zh)
Inventor
辛志强
崔文杰
吕咸文
王涛
赵军
彭涛
李明
孙黎新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200253518U priority Critical patent/CN201226422Y/en
Application granted granted Critical
Publication of CN201226422Y publication Critical patent/CN201226422Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a pole mounted operation platform of a power system. In the technical proposal, the pole mounted operation platform mainly comprises an integrative platform and a fast fixing device which are combined with each other; the integrative platform mainly comprises a base and security guard rails; the fast fixing device mainly comprises a balancing bracket, a strengthening pull rod, a fixing linkage plate and a fixing bolt; one end of the balancing bracket is movably connected with the central position of the two sides of the base, and the other end is fixed on an electric pole through a rubber protection pad; the strengthening pull rod is arranged in the middle of the balancing bracket and connected with the two sides of the base; the base is supported on the electric pole through the fixing linkage plate and the fixing bolt; and the strengthening pull rod and the rubber protection pad are arranged at the upper end of the fixing linkage plate to fix the base. The utility model has the beneficial effects of reducing the labor intensity of operating workers in the pole operation, improving the labor productivity, expanding the scope of operation, solving the problem of too difficult operation in the novel pipe tower construction, and increasing the safety factor.

Description

Operating platform on the bar
One, technical field:
Operating platform on the bar that the utility model relates on the concrete electric pole of a kind of high pressure electric line, low-voltage distributing line, communication line and the long-term operation of novel pipe tower is used.
Two, background technology:
At present, operation generally is to adopt climbers or pedal climbing electric pole on the existing bar, arrives operation behind the service position.The problem of its existence is: the one, and when needing the problem of the above cooperation installation of two people or two people, adopt climbers or pedal just can't realize operation; The 2nd, need on bar, operate chronic or installation process too during complicated problems, adopt climbers or pedal just to reduce operating efficiency; The 3rd, can't the erect-position operation on the novel pipe tower etc. problem.
Three, summary of the invention:
The purpose of this utility model is exactly the above-mentioned defective that exists at prior art, providing a kind of can operate, need not auxiliary equipment separately by a people and assist, simplify installation procedure, improve operating platform on the bar of installation rate and convenient disassembly, be convenient to change work angle and operating level, extended operation length and scope, both can operation on the concrete electric pole, again can operation on novel pipe tower.
Its technical scheme is: mainly combined by integral type platform and quick formula fixture and form, described integral type platform mainly is made up of pedestal and safety barrier, described quick formula fixture is mainly by balance bracket, reinforced pull rod, fixedly yoke plate and set bolt are formed, one end of balance bracket is movably connected in the center of the both sides of pedestal, the other end is fixed on the electric pole by rubber fender, and the centre of balance bracket is provided with reinforced pull rod and is connected with the both sides of pedestal; Described pedestal supports by fixedly yoke plate and set bolt and leans against on the electric pole, and described reinforced pull rod and rubber fender are located at the upper end of fixing yoke plate with fixed pedestal.
Wherein, described pedestal supports and leans against on the electric pole by support embracing iron, and is connected with fixing yoke plate by set bolt.
The beneficial effects of the utility model are: alleviated operator's labour intensity in the operation on bar, improved labor productivity, expanded opereating specification, solved operation easier problems of too in the novel pipe tower construction operation, increased coefficient of safety.In the accident of company is speedily carried out rescue work process, shortened the line outage time greatly, reduced energy loss.
Four, description of drawings:
Accompanying drawing 1 is a structural representation of the present utility model;
Among the last figure: 1-pedestal, 2-safety barrier, 3-balance bracket, 4-support and embrace iron, 5-rubber fender, 6-reinforced pull rod, 7-fixedly yoke plate, 8-set bolt, 9-electric pole.
Five, embodiment:
In conjunction with the accompanying drawings, the utility model will be further described:
Its technical scheme is: mainly combined by integral type platform and quick formula fixture and form, described integral type platform mainly is made up of pedestal 1 and safety barrier 2, described quick formula fixture is mainly by balance bracket 3, reinforced pull rod 6, fixedly yoke plate 7 and set bolt 8 are formed, one end of balance bracket 3 is movably connected in the center of the both sides of pedestal 1, the other end is fixed on the electric pole 9 by rubber fender 5, and the centre of balance bracket 3 is provided with reinforced pull rod 6 and is connected with the both sides of pedestal 1; Described pedestal 1 supports by fixing yoke plate 7 and set bolt 8 and leans against on the electric pole 9, and described reinforced pull rod 6 and rubber fender 5 are located at the upper end of fixing yoke plate 7 with fixed pedestal.
Described pedestal 1 supports and leans against on the electric pole by support embracing iron 4, and is connected with fixing yoke plate 7 by set bolt 8.
Organize line construction, maintenance and emergency repair work and on electric pole during long-time operation, platform is installed simple and direct, shortened the activity duration, simultaneously can change operating angle and working surfaces arbitrarily, increased personnel's opereating specification on the bar, reduce labour intensity, improved operating efficiency, and improved safety factor of workers.
The soluble problem of the utility model is as follows: 1, can solve the work on hand platform must have two people and above cooperation just can finish the problem of installation; 2, can solve single mounting platform need use auxiliary equipment to assist the problem of installing; 3, can solve the mounting platform overlong time, installation process is complicated problems too; 4, can solve platform and install after, because of the operation transposition with change the problem of the platform dismounting inconvenience that operation planar causes; 5, it is too small to solve bar upper mounting plate opereating specification, influences the problem of operating effect and operating efficiency; 6, can solve on the novel pipe tower can't the erect-position operation problem; 7, can solve that end of operation rear platform dismounting is taken a lot of work, the problem of time-consuming, effort.

Claims (2)

1, operating platform on a kind of bar, it is characterized in that: mainly combine and form by integral type platform and quick formula fixture, described integral type platform mainly is made up of pedestal (1) and safety barrier (2), described quick formula fixture is mainly by balance bracket (3), reinforced pull rod (6), fixedly yoke plate (7) and set bolt (8) are formed, one end of balance bracket (3) is movably connected in the center of the both sides of pedestal (1), the other end is fixed on the electric pole (9) by rubber fender (5), and the centre of balance bracket (3) is provided with reinforced pull rod (6) and is connected with the both sides of pedestal (1); Described pedestal (1) supports by fixedly yoke plate (7) and set bolt (8) and leans against on the electric pole (9), and described reinforced pull rod (6) and rubber fender (5) are located at the upper end of fixing yoke plate (7) with fixed pedestal.
2, operating platform on the bar according to claim 1 is characterized in that: described pedestal (1) supports and leans against on the electric pole by support embracing iron (4), and is connected with fixing yoke plate (7) by set bolt (8).
CNU2008200253518U 2008-06-19 2008-06-19 On-lever operating platform Expired - Fee Related CN201226422Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200253518U CN201226422Y (en) 2008-06-19 2008-06-19 On-lever operating platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200253518U CN201226422Y (en) 2008-06-19 2008-06-19 On-lever operating platform

Publications (1)

Publication Number Publication Date
CN201226422Y true CN201226422Y (en) 2009-04-22

Family

ID=40599323

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200253518U Expired - Fee Related CN201226422Y (en) 2008-06-19 2008-06-19 On-lever operating platform

Country Status (1)

Country Link
CN (1) CN201226422Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110877325A (en) * 2019-12-10 2020-03-13 国网青海省电力公司海北供电公司 Portable electric pole aerial work single platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110877325A (en) * 2019-12-10 2020-03-13 国网青海省电力公司海北供电公司 Portable electric pole aerial work single platform

Similar Documents

Publication Publication Date Title
CN201458590U (en) Special hoisting tool of power transforming equipment
CN201226422Y (en) On-lever operating platform
CN201274392Y (en) Operating platform on portable adjustable bar
CN203398707U (en) Wire-bracing clamp
CN202423906U (en) Overhaul platform for isolating switch
CN108336703A (en) A kind of distribution low-voltage circuit junction box's support device
CN201178253Y (en) Operation platform of knife brake examination
CN204038917U (en) Dismountable external hanging service platform
CN104377578B (en) Low-voltage pole type power distribution cabinet operating platform
CN203813313U (en) Mobile workbench for check and repair of strain insulator string
CN203288386U (en) Transformer rack overall installation support
CN202678836U (en) Lifting device for strain insulator of power transmission line
CN202333524U (en) Hoisting support for overhaul of isolating switch
CN202957526U (en) Working platform of concrete pole
CN202144673U (en) Integrated base station fixing structure
CN202910837U (en) Work table
CN201686405U (en) Rail supporting device of building
CN206279749U (en) A kind of operating platform for overhauling power transmission tower rod fork beam
CN205610536U (en) Various steel tile photovoltaic supporting structure
CN201975710U (en) Special tool for fixing isolating switch porcelain bottle
CN205087881U (en) Portable detachable high tower examines and repair instrument
CN203589536U (en) GW6-type disconnecting switch fast-assembling maintenance support
CN219773556U (en) High-speed railway station house aerial work platform
CN202712717U (en) Reinforcement bracket of open-type substation framework lightning rod
CN202416838U (en) Cross beam of operating platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090422

Termination date: 20100619