CN205087881U - Portable detachable high tower examines and repair instrument - Google Patents
Portable detachable high tower examines and repair instrument Download PDFInfo
- Publication number
- CN205087881U CN205087881U CN201520874426.XU CN201520874426U CN205087881U CN 205087881 U CN205087881 U CN 205087881U CN 201520874426 U CN201520874426 U CN 201520874426U CN 205087881 U CN205087881 U CN 205087881U
- Authority
- CN
- China
- Prior art keywords
- link span
- connecting rod
- pulley
- high tower
- link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002965 rope Substances 0.000 claims abstract description 10
- 238000010168 coupling process Methods 0.000 claims description 13
- 238000005859 coupling reaction Methods 0.000 claims description 13
- 230000001808 coupling Effects 0.000 claims description 12
- 230000002787 reinforcement Effects 0.000 claims description 5
- 238000003466 welding Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 9
- 230000001684 chronic Effects 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 15
- 239000010959 steel Substances 0.000 description 15
- 239000000725 suspension Substances 0.000 description 3
- 238000004804 winding Methods 0.000 description 3
- CWFOCCVIPCEQCK-UHFFFAOYSA-N Chlorfenapyr Chemical compound BrC1=C(C(F)(F)F)N(COCC)C(C=2C=CC(Cl)=CC=2)=C1C#N CWFOCCVIPCEQCK-UHFFFAOYSA-N 0.000 description 2
- 208000007536 Thrombosis Diseases 0.000 description 2
- 230000003187 abdominal Effects 0.000 description 2
- 230000000875 corresponding Effects 0.000 description 2
- 238000000151 deposition Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 102000010637 Aquaporins Human genes 0.000 description 1
- 108010063290 Aquaporins Proteins 0.000 description 1
- 241000331528 Chlorophytum capense Species 0.000 description 1
- 241000282326 Felis catus Species 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000001502 supplementation Effects 0.000 description 1
Abstract
Portable detachable high tower examines and repair instrument relates to a maintenance instrument. The operation and the maintenance of high tower, difficulty, chronic is overhauld to efficiency low, can't ensure the operation of this circuit safe and reliable, can not compromise the cost of maintenance and the security of maintenance. The utility model discloses a rotating between the seat frame and the pedal frame that are used for connecting the mounted frame of safety rope, the link that links to each other with the mounted frame lower extreme, are connected with the link, link and pedal frame and being connected, the lower extreme of link is continuous with the seat frame lower extreme, and it is continuous with the lower extreme of link to ride the upper end of putting up, both sides are equipped with first pulley, second pulley respectively about the mounted frame, and first pulley department is equipped with and is used for restricting the gliding brake equipment of safety rope. This technical scheme dismantles, assembly process all can accomplish reliable and simple rapidly. This technical scheme examines and repair instrument simple structure, the reliable operation, and the operating cost is low, maintenance efficiency is high.
Description
Technical field
The utility model relates to a kind of service kit, particularly relates to Portable detachable high tower service kit.
Background technology
Because of the restriction of geographic factor, special on island, in order to improve the distance between steel tower, often need to select diameter slightly and highly large electric power pylon, as in Zhoushan, be positioned at the large cat mountain on spiral shell head water channel big across, the major diameter firm pipe tower on two 370 meters high, summer hat mountain is the highest electric power pylon in the current world, steel tower diameter of steel tube is maximum reaches 2 meters, steel pipe Fa Lan side, back side bolt maintenance cannot be carried out, in installation process, the equipment such as pole are had due to camp site, the scene be convenient to is put installing at method field and is hung hurdle temporarily, convenient installation, but after putting into operation, consider that the line service amount of in the future hanging hurdle is large, maintenance workload and the expense of high tower itself are even exceeded, just remove and hung hurdle, but the potential safety hazard brought sharply increases thereupon.In daily production work, because steel tower is high, diameter is thick, not easily climb, and poor stability, the operation and maintenance of this two bases steel tower occupies quite large time and human cost, efficiency low, and maintenance difficulty, time are long, this line security reliability service cannot be guaranteed, the cost of maintenance and the safety of maintenance can not be taken into account.
Utility model content
The technical assignment of the technical problems to be solved in the utility model and proposition carries out improving to prior art and improves, and provides Portable detachable high tower service kit, take into account the cost of maintenance and the object of safety to reach.For this reason, the utility model takes following technical scheme.
Portable detachable high tower service kit, it is characterized in that: comprise the hanger bracket for connecting safety rope, the link span be connected with hanger bracket lower end, the mounting be connected with link span and pedal frame, be rotationally connected between described link span and pedal frame, the lower end of described link span is connected with mounting lower end, and the upper end of pedal frame is connected with the lower end of link span; The right and left of described hanger bracket is respectively equipped with the first pulley, the second pulley, and the first pulley place is provided with the brake gear slided for limiting safety rope.The technical program dismounting, assembling process all can complete rapidly, simple.And in steel tower maintenance process, only need by wire winding pulley suspension on flange, simultaneously below steel tower by manpower traction, 360 degree comprehensive maintenance of Design of Large-diameter Steel Tube Tower can be realized, without any overhauling dead angle.Improve safety and the efficiency of maintenance, reduce the cost of overhaul simultaneously.If pedal frame, the both feet for operator are placed, and increase the traveling comfort of aloft work, improve safety simultaneously.
As improving further and supplementing technique scheme, the utility model also comprises following additional technical feature.
Described hanger bracket, link span, mounting, the pedal frame support body all for being made up of Metallic rod.Contribute to the weight reducing service kit, be easy to carry.
Described hanger bracket comprises the hand-held rod of the transverse direction being positioned at upper end, is positioned at the vertical pulley yoke at two ends, left and right, and the bottom of pulley yoke is connected with link span upper end, and the first described pulley, the second pulley, brake gear are located on pulley yoke.First pulley, the second pulley are used for wearing insurance rope.Hand-held rod can be used as the portable place when carrying.
Described link span comprises the first connecting rod of the transverse direction being positioned at upper end, upper end is connected with first connecting rod and perpendicular to two symmetrically arranged second connecting rods of first connecting rod, the third connecting rod of transverse direction that is connected with two second connecting rod lower ends; Through hole is offered in the bottom of described pulley yoke, and attaching parts is connected with the first connecting rod of link span through the through hole of pulley yoke; The lower end of the second described pipe link is connected with pedal frame and mounting.Attaching parts can be screw, bolt assembly etc., easy accessibility.
Described first connecting rod, second connecting rod, third connecting rod form the link span of integral type by welding, and the weld of first connecting rod, second connecting rod is provided with reinforcement.Reinforcement is conducive to the intensity improving junction, improves safety.
Described pedal frame is in " work " font, its lower end is pedal position, and its upper end is the Coupling Shaft be connected with link span, and described link span is provided with through hole, attaching parts is connected with the Coupling Shaft of pedal frame through through hole, is rotationally connected between described pedal frame and link span by Coupling Shaft.Rotatable between pedal frame and connecting rod rest, improve the alerting ability of operation, the replaceable posture of operator and being loosened, thus improve the traveling comfort of operator.Mounting and rotation that also can be corresponding between link span, to adapt to different operators, make link span and mounting and operator press close to, further increase safety simultaneously.Meanwhile, the rotation of mounting and link span is stacked, also can reduce space when depositing.
Described mounting comprises horizontal pipe link, one end many piece seatposts being connected vertical with pipe link, and the other end of seatpost is connected with the Coupling Shaft of pedal frame.Seatpost can be more than two or two, to improve load area, avoids occurring the phenomenons such as numb because of thrombosis.
Described link span and hanger bracket are rotationally connected.Rotatable between link span and hanger bracket, when storing, link span and hanger bracket can be stacked, reduce parking space.
Described link span is " < " shape, intersection arc transition in the middle part of it.Evagination in the middle part of link span, increases abdominal space, avoids long-time clamping and sad.
Described mounting is in " > " shape, and intersection arc transition in the middle part of it, the height of mounting is lower than the height of link span.Evagination in the middle part of mounting, to adapt to the bodily form, increases load area, reduces the constriction of local, to reduce sense of discomfort when wrapping up before and after human body.
Each parts only need be assembled, avoid inconvenience when large volume instrument carries by beneficial effect: 1, easy to carry: service kit can carry out disassembly and assembly in use.Save manpower, decrease instrument haulage time, improve work efficiency.
2, simple to operate: service kit dismounting, assembling process all can complete rapidly, and method is simple.And in steel tower maintenance process, only need by wire winding pulley suspension on flange, simultaneously below steel tower by manpower traction, 360 degree comprehensive maintenance of Design of Large-diameter Steel Tube Tower can be realized, without any overhauling dead angle.
3, safe and reliable: because service kit structure is simple, so the potential safety hazard existed is easy to search.Service personnel, when carrying out upkeep operation, can be put down and be sitting on the base of releasing pulley, reduces the task difficulty of operating personnel, alleviates the work fatigue of operating personnel, greatly improves job safety coefficient.
4, cheap: service kit manufacturing process is simple, make raw material less.Spend the millesimal being only and installing permanent bracketplant additional, greatly reduce operating cost.
Accompanying drawing explanation
Fig. 1 is the utility model blasting arrangement schematic diagram.
Fig. 2 is the utility model assembly structure figure.
In figure: 1-hanger bracket; 101-hand-held rod; 102-pulley yoke; 2-link span; 201-first connecting rod; 202-second connecting rod; 203-third connecting rod; 204-reinforcement; 3-mounting; 301-pipe link; 302-seatpost; 4-pedal frame; 401-Coupling Shaft; 5-first pulley; 6-second pulley; 7-brake gear.
Detailed description of the invention
Below in conjunction with Figure of description, the technical solution of the utility model is described in further detail.
As shown in Figure 1, 2, Portable detachable high tower service kit comprises the hanger bracket 1 for connecting safety rope, the link span 2 be connected with hanger bracket 1 lower end, the mounting 3 be connected with link span 2 and pedal frame 4, be rotationally connected between link span 2 and pedal frame 4, the lower end of link span 2 is connected with mounting 3 lower end, and the upper end of pedal frame 4 is connected with the lower end of link span 2; The right and left of hanger bracket 1 is respectively equipped with the first pulley 5, second pulley 6, first pulley 5 place and is provided with the brake gear 7 slided for limiting safety rope.The technical program dismounting, assembling process all can complete rapidly, simple.In steel tower maintenance process, only need by wire winding pulley suspension on flange, simultaneously below steel tower by manpower traction, 360 degree comprehensive maintenance of Design of Large-diameter Steel Tube Tower can be realized, without any overhauling dead angle.Improve safety and the efficiency of maintenance, reduce the cost of overhaul simultaneously.If pedal frame 4, the both feet for operator are placed, and increase the traveling comfort of aloft work, improve safety simultaneously.
For reducing the weight of service kit, be easy to carry, hanger bracket 1, link span 2, mounting 3, the support body of pedal frame 4 all for being made up of Metallic rod.
Conveniently carry and simplified structure, the reliability of raising work, hanger bracket 1 comprises the hand-held rod 101 of the transverse direction being positioned at upper end, is positioned at the vertical pulley yoke 102 at two ends, left and right, the bottom of pulley yoke 102 is connected with link span 2 upper end, and the first pulley 5, second pulley 6, brake gear 7 are located on pulley yoke 102.First pulley 5, second pulley 6 is for wearing insurance rope, and hand-held rod 101 can be used as the portable place when carrying.
For convenience of processing and dismounting, link span 2 comprises the first connecting rod 201 of the transverse direction being positioned at upper end, upper end and to be connected with first connecting rod 201 and perpendicular to two symmetrically arranged second connecting rods 202 of first connecting rod 201, the third connecting rod 203 of transverse direction that is connected with two second connecting rod 202 lower ends; Through hole is offered in the bottom of pulley yoke 102, and attaching parts is connected with the first connecting rod 201 of link span 2 through the through hole of pulley yoke 102; The lower end of the second pipe link 301 is connected with pedal frame 4 and mounting 3.Attaching parts can be screw, bolt assembly etc., easy accessibility.
For gaining in strength, first connecting rod 201, second connecting rod 202, third connecting rod 203 form the link span 2 of integral type by welding, the weld of first connecting rod 201, second connecting rod 202 is provided with reinforcement 204.Reinforcement 204 is conducive to the intensity improving junction, improves safety.
For taking into account alerting ability when traveling comfort and operation, pedal frame 4 is in " work " font, its lower end is pedal position, its upper end is the Coupling Shaft 401 be connected with link span 2, link span 2 is provided with through hole, attaching parts is connected with the Coupling Shaft 401 of pedal frame 4 through through hole, is rotationally connected between pedal frame 4 and link span 2 by Coupling Shaft 401.Rotatable between pedal frame 4 and connecting rod rest, improve the alerting ability of operation, the replaceable posture of operator and being loosened, thus improve the traveling comfort of operator.
For improving the reliability connected, improve safety and Portability, mounting comprises horizontal pipe link 301, one end many piece seatposts 302 of being connected vertical with pipe link 301, and the other end of seatpost 302 is connected with the Coupling Shaft 401 of pedal frame 4.Seatpost 302 can be more than two or two, to improve load area, avoids occurring the phenomenons such as numb because of thrombosis.Mounting and rotation that also can be corresponding between link span 2, to adapt to different operators, make link span 2 press close to operator with mounting 3, further increase safety simultaneously.Meanwhile, the rotation of mounting and link span 2 is stacked, also can reduce space when depositing, be convenient for carrying.
For reducing parking space, link span 2 and hanger bracket 1 are rotationally connected.Rotatable between link span 2 and hanger bracket 1, when storing, link span 2 and hanger bracket 1 can be stacked, reduce parking space.
For improving traveling comfort, link span 2 is " < " shape, intersection arc transition in the middle part of it.Evagination in the middle part of link span 2, increases abdominal space, avoids long-time clamping and sad.Mounting 3 is in " > " shape, and intersection arc transition in the middle part of it, the height of mounting 3 is lower than the height of link span 2.Evagination in the middle part of mounting 3, to adapt to the bodily form, increases load area, reduces the constriction of local, to reduce sense of discomfort when wrapping up before and after human body.
Portable detachable high tower service kit shown in above Fig. 1,2 is specific embodiment of the utility model; the utility model substantive distinguishing features and progress are embodied; can according to the use needs of reality; under enlightenment of the present utility model; it is carried out to the equivalent modifications of the aspect such as shape, structure, all at the row of the protection domain of this programme.
Claims (10)
1. Portable detachable high tower service kit, it is characterized in that: the link span (2), the mounting (3) be connected with link span (2) and the pedal frame (4) that comprise the hanger bracket (1) for connecting safety rope, are connected with hanger bracket (1) lower end, be rotationally connected between described link span (2) and pedal frame (4), the lower end of described link span (2) is connected with mounting (3) lower end, and the upper end of pedal frame (4) is connected with the lower end of link span (2); The right and left of described hanger bracket (1) is respectively equipped with the first pulley (5), the second pulley (6), and the first pulley (5) place is provided with the brake gear (7) slided for limiting safety rope.
2. Portable detachable high tower service kit according to claim 1, is characterized in that: described hanger bracket (1), link span (2), mounting (3), pedal frame (4) support body all for being made up of Metallic rod.
3. Portable detachable high tower service kit according to claim 2, it is characterized in that: described hanger bracket (1) comprises the hand-held rod (101) of the transverse direction being positioned at upper end, is positioned at the vertical pulley yoke (102) at two ends, left and right, the bottom of pulley yoke (102) is connected with link span (2) upper end, and described the first pulley (5), the second pulley (6), brake gear (7) are located on pulley yoke (102).
4. Portable detachable high tower service kit according to claim 3, is characterized in that: described link span (2) comprises the first connecting rod (201) of the transverse direction being positioned at upper end, upper end and first connecting rod (201) are connected and perpendicular to two symmetrically arranged second connecting rods (202) of first connecting rod (201), the third connecting rod (203) of transverse direction that is connected with two second connecting rods (202) lower end; Through hole is offered in the bottom of described pulley yoke (102), and attaching parts is connected with the first connecting rod (201) of link span (2) through the through hole of pulley yoke (102); The lower end of described the second pipe link (301) is connected with pedal frame (4) and mounting (3).
5. Portable detachable high tower service kit according to claim 4, it is characterized in that: described first connecting rod (201), second connecting rod (202), third connecting rod (203) form the link span (2) of integral type by welding, and the weld of first connecting rod (201), second connecting rod (202) is provided with reinforcement (204).
6. Portable detachable high tower service kit according to claim 4, it is characterized in that: described pedal frame (4) is in " work " font, its lower end is pedal position, its upper end is the Coupling Shaft (401) be connected with link span (2), described link span (2) is provided with through hole, attaching parts is connected with the Coupling Shaft (401) of pedal frame (4) through through hole, is rotationally connected between described pedal frame (4) and link span (2) by Coupling Shaft (401).
7. Portable detachable high tower service kit according to claim 6, it is characterized in that: described mounting comprises horizontal pipe link (301), one end many piece seatposts (302) of being connected vertical with pipe link (301), and the other end of seatpost (302) is connected with the Coupling Shaft (401) of pedal frame (4).
8. the Portable detachable high tower service kit according to the arbitrary claim of claim 1-7, is characterized in that: described link span (2) and hanger bracket (1) are rotationally connected.
9. Portable detachable high tower service kit according to claim 8, is characterized in that: described link span (2) is " < " shape, intersection arc transition in the middle part of it.
10. Portable detachable high tower service kit according to claim 9, is characterized in that: described mounting (3) is in " > " shape, and intersection arc transition in the middle part of it, the height of mounting (3) is lower than the height of link span (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520874426.XU CN205087881U (en) | 2015-11-04 | 2015-11-04 | Portable detachable high tower examines and repair instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520874426.XU CN205087881U (en) | 2015-11-04 | 2015-11-04 | Portable detachable high tower examines and repair instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205087881U true CN205087881U (en) | 2016-03-16 |
Family
ID=55478588
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520874426.XU Active CN205087881U (en) | 2015-11-04 | 2015-11-04 | Portable detachable high tower examines and repair instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205087881U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105293385A (en) * | 2015-11-04 | 2016-02-03 | 国网浙江省电力公司舟山供电公司 | Portable detachable high-tower overhauling tool |
-
2015
- 2015-11-04 CN CN201520874426.XU patent/CN205087881U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105293385A (en) * | 2015-11-04 | 2016-02-03 | 国网浙江省电力公司舟山供电公司 | Portable detachable high-tower overhauling tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202217968U (en) | Lifting type paying-off tackle for wires in power distribution lines | |
CN202031469U (en) | Horizontal hanging ladder used for maintenance of overhead transmission line | |
CN205087881U (en) | Portable detachable high tower examines and repair instrument | |
CN206313359U (en) | Straight line pole fall block | |
CN201918688U (en) | Cable terminal frame | |
CN203865934U (en) | Temporary suspension device of pulley lifting mechanism for electric pole | |
CN105293385A (en) | Portable detachable high-tower overhauling tool | |
CN201874439U (en) | Centipede ladder used for eliminating foreign bodies of leads electrically | |
CN204407787U (en) | A kind of power line construction center line take-up coaster | |
CN205985971U (en) | Special link plate structure of unwrapping wire coaster | |
CN106654985B (en) | A kind of straight line pole fall block | |
CN208835589U (en) | A kind of super, extra-high voltage earth potential working platform | |
CN203699783U (en) | Hanging bracket fixed with wire pole | |
CN203787859U (en) | Portable derrick applied to transmission line overhauling | |
CN203347676U (en) | Multifunctional insulating ladder end hanger | |
CN203487848U (en) | Anti-climbing workshop of power transmission tower | |
CN202749753U (en) | Bracket type motor-driven winch | |
CN206195237U (en) | A eccentric chair that is used for V type cluster insulator to change operation | |
CN205901172U (en) | Nearly pole of transmission line overhauls corridor hanger device | |
CN203114144U (en) | Overhung maintenance hook ladder | |
CN202602173U (en) | Overhead line supporting tower line-releasing/tightening operation platform | |
CN206172810U (en) | Portable lifting device | |
CN204633221U (en) | A kind of rotating lifting gear of power transmission line overhead ground wire | |
CN204840907U (en) | Improvement type of recreation ground swing of travelling | |
CN203367919U (en) | Wire clamp body of ground-potential-working non-bearing connecting wire clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |