CN201224604Y - 一种带充气胶囊的大口径管道 - Google Patents
一种带充气胶囊的大口径管道 Download PDFInfo
- Publication number
- CN201224604Y CN201224604Y CNU2008200861706U CN200820086170U CN201224604Y CN 201224604 Y CN201224604 Y CN 201224604Y CN U2008200861706 U CNU2008200861706 U CN U2008200861706U CN 200820086170 U CN200820086170 U CN 200820086170U CN 201224604 Y CN201224604 Y CN 201224604Y
- Authority
- CN
- China
- Prior art keywords
- capsule
- pipeline
- charging
- aerated capsule
- aerated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
本实用新型涉及一种带充气胶囊的大口径管道,主要包括管道,管道内设有与管道内壁配合的充气胶囊。所述的充气胶囊直径略小于管道的内径,充气胶囊长度所产生的浮力大于管道的重量。所述的充气胶囊上开有胶囊充气口,胶囊充气口与充气胶囊的内腔相连通,胶囊充气口上还可以设有单向充气阀。本实用新型有益的效果是:采用本实用专利的结构,在管道运输的时候,大大减少了临时便道的铺设和占用,大大减少了对沿途青苗的损坏和赔偿;而且施工方便、节省土地、降低费用。
Description
技术领域
本实用新型涉及一种建筑管道,特别是涉及一种带充气胶囊的大口径管道。
背景技术
社会的快速发展,城市和工业区的建设规模越来越大,大型基建项目的实施屡见不鲜。涉及大口径管道(直径1500毫米以上)运输和布管的常规做法是,沿布管线路两旁或一边铺设临时便道,便道的建造要求是:能通行大型运输工具的道路宽度和承载能力,需要占用大片的土地和使用大型的运输工具。农田泥泞不堪,铺筑路基也费时费工、操作困难,特别是穿越农田和居民密集区时,赔偿金费用高得惊人。既花费浩大又耽误工期。
实用新型内容
本实用新型要解决上述现有技术的缺陷,提供一种带充气胶囊的大口径管道。
本实用新型解决其问题采用的技术方案是:这种带充气胶囊的大口径管道,主要包括管道,管道内设有与管道内壁配合的充气胶囊。
所述的充气胶囊直径略小于管道的内径,充气胶囊长度所产生的浮力大于管道的重量。所述的充气胶囊上开有胶囊充气口,胶囊充气口与充气胶囊的内腔相连通,胶囊充气口上还可以设有单向充气阀。
本实用新型有益的效果是:采用本实用专利的结构,在管道运输的时候,大大减少了临时便道的铺设和占用,大大减少了对沿途青苗的损坏和赔偿;而且施工方便、节省土地、降低费用。
附图说明
图1为本实用新型的立体结构示意图1;
图2为本实用新型的立体结构示意图2;
标记说明:管道1,充气胶囊2,胶囊充气口3。
具体实施方式
下面结合实施例和附图对本实用新型作进一步介绍:
如图所示,这种带充气胶囊的大口径管道,主要包括管道1,管道1的截面形状可以是圆形或者其他截面形状。管道1内设有与管道1内壁配合的充气胶囊2。充气胶囊2上开有胶囊充气口3,胶囊充气口3与充气胶囊2的内腔相连通,其中胶囊充气口3上还可以设有单向充气阀。
为需要运输的钢管或混凝土管道制造充气胶囊,材料一般采用橡胶,充气胶囊2的壁厚一般为4—6毫米,根据管道重量,计算需要的浮力来制作充气胶囊,充气胶囊2直径略小于管道内径,充气胶囊2长度根据需要的浮力来确定,必须确保浮力大于管道重量。
工艺步骤:1、在计划铺设管道的路段上开挖沟槽,深约2米,遇到淤泥地带或边坡、容易塌方处,采用钢板桩、木桩及砂袋围护;2、沟槽挖好后,将两端进行封堵,用潜水泵抽水灌满到1.5米深左右;3、把充气胶囊放入管道,用充气泵对胶囊充气,充气压力在0.005-0.04MPa之间;4、充气后,把管道连同充气胶囊放入沟槽内,利用水的浮力用人拉、竹杆撑,甚至把管道当做独木舟来撑,把管道运到目的地后,释放胶囊内的空气,取出胶囊,进行布管。这样运输,大大减少了临时便道的铺设和占用,大大减少了对沿途青苗的损坏和赔偿。
施工工艺流程:测量放样→开沟挖槽→槽内放水→将充气胶囊放入管道内→胶囊充气→带胶囊的管道吊入沟槽内→人工拉运管道→到达目的地。
除上述实施例外,本实用新型还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本实用新型要求的保护范围内。
Claims (4)
1、一种带充气胶囊的大口径管道,主要包括管道(1),其特征在于:所述的管道(1)内设有与管道(1)内壁配合的充气胶囊(2)。
2、根据权利要求1所述的带充气胶囊的大口径管道,其特征在于:所述的充气胶囊(2)直径略小于管道(1)的内径,充气胶囊(2)长度所产生的浮力大于管道(1)的重量。
3、根据权利要求1或2所述的带充气胶囊的大口径管道,其特征在于:所述的充气胶囊(2)上开有胶囊充气口(3),胶囊充气口(3)与充气胶囊(2)的内腔相连通。
4、根据权利要求3所述的带充气胶囊的大口径管道,其特征在于:所述的胶囊充气口(3)上设有单向充气阀。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200861706U CN201224604Y (zh) | 2008-04-21 | 2008-04-21 | 一种带充气胶囊的大口径管道 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200861706U CN201224604Y (zh) | 2008-04-21 | 2008-04-21 | 一种带充气胶囊的大口径管道 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201224604Y true CN201224604Y (zh) | 2009-04-22 |
Family
ID=40597486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200861706U Expired - Fee Related CN201224604Y (zh) | 2008-04-21 | 2008-04-21 | 一种带充气胶囊的大口径管道 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201224604Y (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322547A (zh) * | 2011-09-01 | 2012-01-18 | 煌盛集团有限公司 | 一种钢骨架塑料复合管在非开挖施工中的处理工艺及其施工系统 |
CN103437342A (zh) * | 2013-03-08 | 2013-12-11 | 中交二航局第三工程有限公司 | 后张预应力管桩管节预制工艺 |
-
2008
- 2008-04-21 CN CNU2008200861706U patent/CN201224604Y/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102322547A (zh) * | 2011-09-01 | 2012-01-18 | 煌盛集团有限公司 | 一种钢骨架塑料复合管在非开挖施工中的处理工艺及其施工系统 |
CN103437342A (zh) * | 2013-03-08 | 2013-12-11 | 中交二航局第三工程有限公司 | 后张预应力管桩管节预制工艺 |
CN103437342B (zh) * | 2013-03-08 | 2015-08-05 | 中交二航局第三工程有限公司 | 后张预应力管桩管节预制工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107229812B (zh) | 一种高水压岩溶隧道衬砌水压力计算方法 | |
US10030792B2 (en) | Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof | |
CN102359659A (zh) | 钢筋混凝土顶管施工中优化管道设计的方法 | |
CN201224604Y (zh) | 一种带充气胶囊的大口径管道 | |
CN201772155U (zh) | 带底座四圆拱涵 | |
CN102426084A (zh) | 非金属管道水压渗漏检验装置 | |
CN2769654Y (zh) | 河流穿越管道的稳管装置 | |
CN203904857U (zh) | 一种预制混凝土三圆拱涵管 | |
CN204112318U (zh) | 一种提高cfg压灌桩承载力的技术装置 | |
CN101967827B (zh) | 一种桥梁深水基础钢护筒施工方法 | |
CN111287177A (zh) | 密实卵石层地区大直径超长冲孔灌注桩施工方法 | |
CN207093920U (zh) | 一种钢筋混凝土管道安装定位稳定结构 | |
CN204570718U (zh) | 一种带有液体管道通路的筏板基础 | |
CN100491792C (zh) | 充气胶囊运管、布管施工工法 | |
CN208219692U (zh) | 一种改良型输送管道保护基础结构 | |
CN203094938U (zh) | 一种利用竖井投放水泥混凝土材料的装置 | |
CN208203304U (zh) | 一种隧道仰拱修复二次衬砌加固结构 | |
CN201982103U (zh) | 通道结构的施工结构 | |
CN101265992B (zh) | 软粘物料输送管道水上铺设方法与装置 | |
CN101922148A (zh) | 桥涵式板桩结构 | |
CN104746526B (zh) | 一种带有液体管道通路的筏板基础 | |
CN202788888U (zh) | 一种适用于地下工程加固的注浆锚索 | |
CN216616174U (zh) | 适用于山区崩塌落石灾害多发地段的倒虹吸结构 | |
CN110528539A (zh) | 一种采用耐候性编织袋快速处理泥石流、山体滑坡坍塌的土木工程施工方法 | |
CN219571049U (zh) | 气体直埋管结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090422 Termination date: 20160421 |