CN103437342B - 后张预应力管桩管节预制工艺 - Google Patents

后张预应力管桩管节预制工艺 Download PDF

Info

Publication number
CN103437342B
CN103437342B CN201310072953.4A CN201310072953A CN103437342B CN 103437342 B CN103437342 B CN 103437342B CN 201310072953 A CN201310072953 A CN 201310072953A CN 103437342 B CN103437342 B CN 103437342B
Authority
CN
China
Prior art keywords
post
tensioned prestressing
aerated capsule
tube coupling
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310072953.4A
Other languages
English (en)
Other versions
CN103437342A (zh
Inventor
刘忠友
严小卫
耿永卫
陈春雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co filed Critical No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co
Priority to CN201310072953.4A priority Critical patent/CN103437342B/zh
Publication of CN103437342A publication Critical patent/CN103437342A/zh
Application granted granted Critical
Publication of CN103437342B publication Critical patent/CN103437342B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种后张预应力管桩管节预制工艺,包括以下步骤:1)浇筑旋制成型后张预应力管桩管节;2)将带有真空吸管的充气胶囊外套上真空滤布套;3)将未充气的充气胶囊放入后张预应力管桩管节内腔后充入低压压缩空气,同时启动真空泵,真空吸管吸除预应力管桩混凝土中的多余水分,保压8~10分钟;4)关闭真空泵,放出充气胶囊内的低压压缩空气后拉出充气胶囊,将后张预应力管桩管节送去养护后脱模。本发明吸除了混凝土中的游离水分,有效地降低了预应力管桩中混凝土的水灰比,提高了混凝土强度;充气胶囊进一步挤密混凝土,提高了混凝土的密实度及其整体性能;施工过程简单,适应性强。

Description

后张预应力管桩管节预制工艺
技术领域
本发明涉及一种水工工程的后张预应力管桩,特别涉及一种后张预应力管桩管节的制造工艺,属于建筑施工技术领域。
背景技术
现代沿海码头正向着长桩、大跨度方向发展,其中大直径后张预应力管桩管节的应用越来越普遍,后张预应力管桩管节采用离心振压成型机通过离心—振动—辊压复合工艺进行机械化生产,后张预应力管桩管节采用干硬性混凝土立式制作而成,表征干硬性混凝土流动性指标的维勃稠度一般控制在20~35s之内,采用这种工艺生产的后张预应力管桩管节,其设备靠进口,生产工艺较为复杂,生产成本较高。也有部分工程采用普通离心设备制作后张预应力管桩管节,但这种后张预应力管桩管节无法达到混凝土密实度要求。
发明内容
本发明的目的是提供一种制造工艺简单、混凝土强度较高、密实度较好的后张预应力管桩管节预制工艺。
本发明通过以下技术方案予以实现:
一种后张预应力管桩管节预制工艺,包括以下步骤:
1)采用普通管柱离心设备将两个半圆形对拼模板内的后张预应力管桩管节浇筑旋制成型;
2)根据后张预应力管桩管节的内径大小,制作一带有真空吸管的充气胶囊;
3)将套状真空滤布套在充气胶囊的外壁上;
4)未充气的充气胶囊连同真空滤布放入完成离心旋制的后张预应力管桩管节内腔中,充气胶囊放置到位后通过充气管充入低压压缩空气,使充气胶囊内气压达到0.35~0.40MPa;与此同时,启动真空泵,吸除后张预应力管桩管节混凝土中的游离水分;
5)真空泵真空度达到80KPa后保压10分钟以上,关闭真空泵,放出充气胶囊内的压缩空气后拉出充气胶囊,将后张预应力管桩管节连同对拼模板送去养护后脱模。
本发明的目的还可以通过以下技术措施来进一步实现。
前述的后张预应力管桩管节,其中所述真空吸管穿越充气胶囊的入口部完全密封。
本发明工艺简单、成本较低,利用充气胶囊内的真空吸管真空吸除混凝土中的游离水分,有效地降低了预应力管桩中混凝土的水灰比,提高了混凝土强度和密实度。本发明在真空吸水的同时,采用在充气胶囊内充入低压压缩空气的方法,进一步挤密混凝土,提高了混凝土密实度及其整体性能,其综合作用明显,施工过程简单,适应性强。
本发明的优点和特点,将通过下面优选实施例的非限制性说明进行图示和解释,这些实施例,是参照附图仅作为例子给出的。
附图说明
图1是本发明的流程图。
图2是本发明使用的充气胶囊装入真空吸管后的结构示意图;
图3是装入后张预应力管桩管节内的充气胶囊充入低压压缩空气后放大横剖面图。
具体实施方式
下面结合附图和实施例对本发明作进一步说明。
如图1~图3所示,本实施例包括以下步骤:
1)采用普通管柱离心设备将两个半圆形对拼模板1内的后张预应力管桩管节2浇筑旋制成型。
2)根据后张预应力管桩管节2的内径大小,制作一带有真空吸管3的充气胶囊4,真空吸管3穿越充气胶囊5的入口部完全密封。
3)将做成套状真空滤布4套在充气胶囊5的外壁上。
4)未充气的充气胶囊5连同真空滤布4放入完成离心旋制的后张预应力管桩管节2内腔中,真空吸管3外露端与真空泵相连。充气胶囊5放置到位后通过充气管充入低压压缩空气,使充气胶囊5内气压达到0.40MPa,直至充气胶囊5外壁的真空滤布4紧贴在后张预应力管桩管节2内壁上;与此同时,启动真空泵,吸除后张预应力管桩管节2混凝土中的游离水分。
5)真空泵真空度达到80KPa后保持10分钟以上,然后关闭真空泵,放出充气胶囊5内的压缩空气后拉出充气胶囊5,将后张预应力管桩管节2连同对拼模板1送去养护后脱模。
在本实施例中,按照C40配制的高性能混凝土,在80KPa的副压真空下,其强度可达到60MPa以上,经过充气胶囊5内0.4MPa气压的挤压,混凝土的密实度可达到25.5KN/m3以上,提高了混凝土的密实度及其整体性能,满足沿海码头等工程施工的预应力管桩混凝土的密实度及其整体性能要求。
除上述实施例外,本发明还可以有其他实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围内。

Claims (2)

1. 一种后张预应力管桩管节预制工艺,其特征在于,包括以下步骤:
1)采用普通管柱离心设备将两个半圆形对拼模板内的后张预应力管桩管节浇筑旋制成型;
2)根据后张预应力管桩管节的内径大小,制作一带有真空吸管的充气胶囊;
3)将套状真空滤布套在充气胶囊的外壁上;
4)未充气的充气胶囊连同真空滤布放入完成离心旋制的后张预应力管桩管节内腔中,真空吸管外露端与真空泵相连;充气胶囊放置到位后通过充气管充入低压压缩空气,使充气胶囊内气压达到0.35~0.40MPa;与此同时,启动真空泵,通过真空吸管吸除后张预应力管桩管节混凝土中的游离水分;
5)真空泵真空度达到80KPa后保压10分钟以上,关闭真空泵,放出充气胶囊内的压缩空气后拉出充气胶囊,将后张预应力管桩管节连同对拼模板送去养护后脱模。
2.如权利要求1所述的后张预应力管桩管节预制工艺,其特征在于,所述真空吸管穿越充气胶囊的入口部完全密封。
CN201310072953.4A 2013-03-08 2013-03-08 后张预应力管桩管节预制工艺 Active CN103437342B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310072953.4A CN103437342B (zh) 2013-03-08 2013-03-08 后张预应力管桩管节预制工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310072953.4A CN103437342B (zh) 2013-03-08 2013-03-08 后张预应力管桩管节预制工艺

Publications (2)

Publication Number Publication Date
CN103437342A CN103437342A (zh) 2013-12-11
CN103437342B true CN103437342B (zh) 2015-08-05

Family

ID=49691051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310072953.4A Active CN103437342B (zh) 2013-03-08 2013-03-08 后张预应力管桩管节预制工艺

Country Status (1)

Country Link
CN (1) CN103437342B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108098985A (zh) * 2017-12-01 2018-06-01 福州市鸿生建材有限公司 一种先张法预应力混凝土管桩工艺
CN111693226A (zh) * 2020-05-29 2020-09-22 重庆建工第四建设有限责任公司 桥梁后张预应力管道高效检漏防堵施工方法
CN116201160B (zh) * 2023-01-06 2023-08-15 华锦建设集团股份有限公司 房屋建筑桩基结构及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101054800A (zh) * 2007-05-11 2007-10-17 上海中技桩业发展有限公司 预应力高强混凝土方桩及其制造方法和成型模具
CN201224604Y (zh) * 2008-04-21 2009-04-22 浙江环宇建设集团有限公司 一种带充气胶囊的大口径管道
CN101736744A (zh) * 2009-12-25 2010-06-16 张子良 自平衡下沉大直径管桩及其施工方法
CN101914914A (zh) * 2010-08-19 2010-12-15 上海中技桩业股份有限公司 一种混凝土预应力空心方桩及其成型方法
JP4989409B2 (ja) * 2007-10-18 2012-08-01 住友金属工業株式会社 基礎杭構造、既製コンクリート杭、および既製コンクリート杭と鋼管杭の継手金物

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101054800A (zh) * 2007-05-11 2007-10-17 上海中技桩业发展有限公司 预应力高强混凝土方桩及其制造方法和成型模具
JP4989409B2 (ja) * 2007-10-18 2012-08-01 住友金属工業株式会社 基礎杭構造、既製コンクリート杭、および既製コンクリート杭と鋼管杭の継手金物
CN201224604Y (zh) * 2008-04-21 2009-04-22 浙江环宇建设集团有限公司 一种带充气胶囊的大口径管道
CN101736744A (zh) * 2009-12-25 2010-06-16 张子良 自平衡下沉大直径管桩及其施工方法
CN101914914A (zh) * 2010-08-19 2010-12-15 上海中技桩业股份有限公司 一种混凝土预应力空心方桩及其成型方法

Also Published As

Publication number Publication date
CN103437342A (zh) 2013-12-11

Similar Documents

Publication Publication Date Title
CN103437342B (zh) 后张预应力管桩管节预制工艺
CN202450537U (zh) 一种真空管井复合降水装置
CN203430473U (zh) 煤矿井下水力压裂钻孔封孔装置
CN103806437B (zh) 双层复式真空预压吹填软土地基处理方法
CN101235634A (zh) 双向真空预压吹填软土地基处理方法
CN207829872U (zh) 封孔、水力压裂及瓦斯抽采一体化施工装置
CN106930268A (zh) 一种结合真空预压制备重塑土的双向排水固结装置及固结工艺
CN201560589U (zh) 一种改进的裂缝补强注浆机
CN109763479A (zh) 一种增压式真空柔性管井降排水系统及其施工方法
CN204551455U (zh) 一种后注浆预应力混凝土空心桩
CN101503875B (zh) 一种真空排水袋装砂井软地基处理方法
CN206593911U (zh) 一种土壤溶液采集器
CN204185844U (zh) 排水注浆结构
CN103615014B (zh) 一种软土基坑的降水装置及其使用方法
CN104727315A (zh) 一种后注浆预应力混凝土空心桩及其制作方法
CN203755325U (zh) 一种upvc复合降水管
CN205012316U (zh) 一种软土地基真空加热处理装置
CN203430466U (zh) 煤矿瓦斯抽采钻孔封孔装置
CN109798095A (zh) 一种煤层气增产用压力扰动装置及煤层气增产方法
CN106865948A (zh) 一种基于淤泥运输管道的间歇出水电脱水装置
CN207295748U (zh) 一种水利工程施工用的井点降水装置
CN206667276U (zh) 一种降水井钢套管装置
CN205399471U (zh) 一种无基础压缩机组
CN110984918A (zh) 一种非常规气藏水平井气举排水采气装置与方法
CN204773757U (zh) 水压机水压气压系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210902

Address after: 238 Nanxu Avenue, Runzhou District, Zhenjiang City, Jiangsu Province, 212004

Patentee after: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU 3RD ENGINEERING Co.,Ltd.

Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 212003 No. 90 Canal Road, Jiangsu, Zhenjiang

Patentee before: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU 3RD ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240304

Address after: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province

Patentee after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Country or region after: China

Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 238 Nanxu Avenue, Runzhou District, Zhenjiang City, Jiangsu Province, 212004

Patentee before: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU 3RD ENGINEERING Co.,Ltd.

Country or region before: China

Patentee before: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.