CN201214769Y - Anchor bolt hole positioning device for support - Google Patents

Anchor bolt hole positioning device for support Download PDF

Info

Publication number
CN201214769Y
CN201214769Y CNU2008200673957U CN200820067395U CN201214769Y CN 201214769 Y CN201214769 Y CN 201214769Y CN U2008200673957 U CNU2008200673957 U CN U2008200673957U CN 200820067395 U CN200820067395 U CN 200820067395U CN 201214769 Y CN201214769 Y CN 201214769Y
Authority
CN
China
Prior art keywords
steel cylinder
bolt hole
anchor bolt
anchor hole
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200673957U
Other languages
Chinese (zh)
Inventor
陈则章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority to CNU2008200673957U priority Critical patent/CN201214769Y/en
Application granted granted Critical
Publication of CN201214769Y publication Critical patent/CN201214769Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a locating device of a saddle anchor bolt hole the technical scheme of which includes a graduation bar piece. The utility model is characterized in that a steel cylinder is arranged on the graduation bar piece; the steel cylinder is a cylinder with a larger closed upper port and a smaller closed lower port; the surface of the steel cylinder is coated with a release agent. The steel cylinder is fastened by a fastener, thus being capable of ensuring a preformed anchor bolt hole on a supporting padstone to achieve demands; besides, the steel cylinder is easily drawn out after construction, thus improving the operating factor; the device has a simple structure, is conveniently manufactured and assembled and has a high practicability.

Description

Bearing anchor hole positioner
Technical field
The utility model relates to a kind of bearing anchor hole positioner.
Background technology
The bearing anchor hole that bearing anchor hole of reserving on the present railroad bridge pier bearing pad stone and industrial equipment are installed, rod shape things such as great majority employing round logs are embedded in the concrete, treat the method for extracting round log again out after the concrete setting.Because rod shape things such as round log are single pre-buried, be difficult to accurately location, in the concrete vibrating process, move easily again, cause the big multiposition of bearing anchor hole inaccurate, set a roof beam in place or erection equipment before the expansion of punchinging again again, and the arrangement of reinforcement on the bearing pad stone is very close, and not only time-consuming taking a lot of work when taking out round log also influenced the quality of bearing pad stone.
Summary of the invention
The purpose of this utility model provide a kind of easy to use, guarantee to reserve bearing anchor hole position accurate in locating device.
The technical solution of the utility model is for this reason: bearing anchor hole positioner, comprise the scale rod member, and it is characterized in that: on the scale rod member, be provided with steel cylinder.
Improvement to such scheme is that described steel cylinder is that upper port is big, the lower end is young, the cylindrical shell that upper and lower port is airtight.
Improvement again to such scheme is to scribble release agent on described steel cylinder surface.
Beneficial effect:
Steel cylinder is fixed on the scale rod member with cruciform fastening for falsework and single fastener, can make position, the degree of depth and the aperture of reserving anchor hole accurate; Steel cylinder is that upper port is big, and the lower end is young, and the surface has release agent can not only guarantee that the reservation anchor hole on the bearing pad stone reaches requirement, and is easy to extract pre-buried steel cylinder behind the worker, improves utilization rate.
The utility model is simple in structure, making is easy to assembly, and the practical railroad bridge bearing anchor hole that can not only be applicable to is located, and can be widely used in the installation of various industrial equipments.
Description of drawings
Fig. 1 is a bearing anchor hole positioner plane structure schematic diagram.
Fig. 2 is Fig. 1 structure Facad structure schematic diagram.
The specific embodiment
As Fig. 1, Fig. 2, shown in: 1 is scale rod member, the 2nd among the figure, cruciform fastening for falsework, the 3rd, steel cylinder, the 4th, single fastener, the 5th, vertical fixed beam, before the concreting of railroad bridge bearing pad stone, with scale in the middle of on the rod member 1 of band scale is to align with the bridge center line of measurement in 0 position, be fixed on the Bridge Pier steel form with cruciform fastening for falsework 2 and vertical fixed beam 5, according to the figure paper size pre-buried steel cylinder 3 accurately is distributed on the bearing pad stone position then, tighten fixing single fastener 4, with steel cylinder surface coating release agent, after the concrete setting, the positioner dismounting is got final product.

Claims (3)

1, bearing anchor hole positioner comprises the scale rod member, it is characterized in that: be provided with steel cylinder on the scale rod member.
2, bearing anchor hole positioner according to claim 1 is characterized in that: described steel cylinder is the cylindrical shell that upper port is big, the lower end is young, upper and lower port is airtight.
3, bearing anchor hole positioner according to claim 2 is characterized in that: described steel cylinder surface scribbles release agent.
CNU2008200673957U 2008-05-20 2008-05-20 Anchor bolt hole positioning device for support Expired - Fee Related CN201214769Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200673957U CN201214769Y (en) 2008-05-20 2008-05-20 Anchor bolt hole positioning device for support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200673957U CN201214769Y (en) 2008-05-20 2008-05-20 Anchor bolt hole positioning device for support

Publications (1)

Publication Number Publication Date
CN201214769Y true CN201214769Y (en) 2009-04-01

Family

ID=40519976

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200673957U Expired - Fee Related CN201214769Y (en) 2008-05-20 2008-05-20 Anchor bolt hole positioning device for support

Country Status (1)

Country Link
CN (1) CN201214769Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813837A (en) * 2021-01-04 2021-05-18 江苏港通路桥集团有限公司 Synchronous construction and maintenance device for support base cushion and lower structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813837A (en) * 2021-01-04 2021-05-18 江苏港通路桥集团有限公司 Synchronous construction and maintenance device for support base cushion and lower structure

Similar Documents

Publication Publication Date Title
CN201722929U (en) Embedded part anchoring device of building template
CN202913420U (en) Reusable positioning device for installing foundation bolts
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN203256760U (en) Formwork for quickly installing and positioning foundation bolt
CN200985564Y (en) TT-type built-in autospasy type anchorage
CN203320979U (en) Reinforcing device of high-strength bolt hoop bracket
CN204715763U (en) A kind of aluminum alloy mould plate diagonal brace supporting member pre-embedded bolt structure
CN202731936U (en) Tunnel inverted arch end mold
CN201214769Y (en) Anchor bolt hole positioning device for support
CN204728694U (en) A kind of concrete component template fixation kit
CN103410345B (en) A kind of reinforced concrete column reinforcing device and method
CN203209591U (en) Standard processing device for big-diameter extra-long pile foundation full pre-assembly reinforcement cage
CN202416339U (en) Fixed base for tower crane
CN201671339U (en) Fixing device for wall bodies and beam column templates of buildings
CN204715750U (en) Utilize the Combined formwork of square rod member
CN103225395A (en) Floor post-cast strip template structure and use method
CN203924718U (en) A kind of formwork reinforcement combination tool
CN203066493U (en) Positioning die for precise construction of main reinforcement of pillar
CN202755674U (en) Positioning installation component for embedded bolts
CN203082365U (en) Matched pipe mounting bracket of civil architecture
CN202644563U (en) Installation device for embedded foundation bolt of small facility
CN202047528U (en) Concrete protection layer thickness controller
CN202000681U (en) Three-dimensional die bracket for concrete embedded parts
CN204630837U (en) To the device of the two-way Shi Hanzhang of CFRP plate in static trial
CN205077615U (en) A floor outer wall lightweight steel construction for villa

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILROAD 11 BUREAU GROUP CO. LTD.

Effective date: 20130125

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130125

Address after: 442013 Shiyan city of Hubei province whitecaps Road No. 99

Patentee after: NO.2 ENGINEERING CO., LTD. OF CHINA RAILWAY CONSTRUCTION 11 BUREAU GROUP

Patentee after: China Railroad 11 Bureau Group Co., Ltd.

Address before: 442013 Shiyan city of Hubei province whitecaps Road No. 99

Patentee before: NO.2 ENGINEERING CO., LTD. OF CHINA RAILWAY CONSTRUCTION 11 BUREAU GROUP

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090401

Termination date: 20130520