CN201206172Y - Structure for preventing shifting of aluminum busbar fixed frame - Google Patents

Structure for preventing shifting of aluminum busbar fixed frame Download PDF

Info

Publication number
CN201206172Y
CN201206172Y CNU2008200124076U CN200820012407U CN201206172Y CN 201206172 Y CN201206172 Y CN 201206172Y CN U2008200124076 U CNU2008200124076 U CN U2008200124076U CN 200820012407 U CN200820012407 U CN 200820012407U CN 201206172 Y CN201206172 Y CN 201206172Y
Authority
CN
China
Prior art keywords
bus
bus bars
insulation
shaped
aluminium busbar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200124076U
Other languages
Chinese (zh)
Inventor
毛宇
吕定雄
戚喜全
刘敬雄
王德全
毛继红
董慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast University Design and Research Institute Co Ltd
Original Assignee
Northeast University Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast University Design and Research Institute Co Ltd filed Critical Northeast University Design and Research Institute Co Ltd
Priority to CNU2008200124076U priority Critical patent/CN201206172Y/en
Application granted granted Critical
Publication of CN201206172Y publication Critical patent/CN201206172Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Installation Of Bus-Bars (AREA)

Abstract

A structure of a fixed bracket of an aluminum bus bar for preventing displacement comprises aluminum bus bars, an upper beam of the bus bar bracket, an under beam of the bus bar bracket, insulation washers, an insulation tube, a stud and a nut, and is characterized in that: (1) the slab-shaped insulation washers arranged above and below the bus bars are changed to at least two pairs of insulation columns; (2), U-shaped brackets connected with the insulation columns are further arranged at the upper ends and the lower ends of the bus bars; and (3) a reserved space necessary for use during heat expansion of the bus bars is arranged between the bus bars. The U-shaped brackets arranged at the upper ends and the lower ends of the bus bars can adopt a double-layered plate type structure; the outer layer of the structure is a supporting armor plate; and the inner layer of the structure is an insulation washer plate. The column-shaped insulation columns can be divided into an upper layer and a lower layer; and round lug bosses and grooves used as mortise and tenon structures are formed at the central part of the columns. The structure has the functions of good ventilation and heat dissipation, is firmly fixed, has a certain adjusting space, and causes no adverse effects to the column-shaped bus bars of an electrolysis bath.

Description

A kind of aluminium busbar fixed support is prevented displacement structure
Technical field
The utility model belongs to the technical field of aluminum cell current feedway, is specifically related to the support bracket fastened anti-running gear of connection bus between a kind of aluminium electrolysis shop termination aluminium busbar fixed support and the workshop.
Background technology
In the production process of electrolytic aluminum, need the huge electric current of load on the aluminium busbar, with the 400KA aluminium cell is example, 6 negative electrode riser bus bars need be set, the electric current that compiles on every root post bus will reach 60~70KA, under powerful magnetic field, bus will bear the effect of huge lorentz's force, can want the occurred level displacement usually; On the other hand, load huge electric current like this on the bus, the Jiao Erre that electric current itself is produced also can make bus produce expansion and distortion, if can not be well fixing aluminium busbar, bus will move to a side of column, will produce some adverse influences by column, so, mounting and fixing bracket all wanted in the termination of aluminium electrolysis shop near the bus of electrolyzer one end and the connection bus between each workshop.
Chinese patent 200520200737.4 has proposed a kind of " bus is prevented mobile fixed support ", and it is provided with the upper and lower beam of bus structure, and the pre-embedded steel slab of the following and bracket basis of bus structure underbeam is connected; Be mounted with insulcrete, back up pad and bus above the underbeam successively; Put the beams in place and be mounted with back up pad, insulcrete and bus structure above the bus again.Be equipped with insulating in the bus both sides and clamp supporting tube, be with threaded stud in the pipe, by the upper and lower beam of bus structure bus is fixed with bolt, nut.Yet this scheme has following problem: (1) scheme has only been considered the upper and lower displacement of bus, promptly only uses, underbeam fixes bus; (2) do not consider that each the sense of current of bus is all identical, so the lorentz's force of its level should be to repel mutually, so the centre need not to add insulating barrier; (3) the clamping supporting tube of bus both sides can not limit the motion of bus on direction perpendicular with it, and because its two clamping supporting tubes are the same, underbeam becomes parallelogram sturcutre, this structure is unsettled, just is easy to the run-off the straight distortion after stressed.These all are the places that need make improvements.
The utility model content
The purpose of this utility model is exactly to seek a kind of simple in structure, reasonable in design and safe and reliable support bracket fastened anti-displacement structure of aluminium busbar when using.
Aluminium busbar fixed support of the present utility model is prevented displacement structure, comprises aluminium busbar, bus structure upper beam, bus structure underbeam, insulating mat, insulation tube, and studs and nut is characterized in that:
(1) with the plate shaped insulating mat of bus upper and lower is insulated column more than two pairs instead;
(2) the bus upper/lower terminal is provided with the U-shaped support that is connected with insulated column in addition;
Reserving space when (3) being provided with necessary confession bus thermal expansion between each bus.
Aluminium busbar fixed support of the present utility model is prevented displacement structure, and the upper and lower U-shaped support of bus can be taked double-deck plank frame, and it is outer to be that supporting steel plate, internal layer are insulating pad.The upper and lower U-shaped support of bus can be taked double-deck plank frame, and it is outer to be that supporting steel plate, internal layer are insulating pad.
Aluminium busbar fixed support of the present utility model is prevented displacement structure, and the insulated column of bus upper and lower is cylindrical, and they can be divided into upper and lower two-layer, and the right cylinder centre has as the round boss of joinery and its construction and groove.Between the two-layer insulated column, insulated column with between the upper and lower beam of bus structure and insulated column with all taking above-mentioned joinery and its construction to connect between the upper and lower U-shaped stent support steel plate with fixing.
Aluminium busbar fixed support of the present utility model is prevented displacement structure, during installation, earlier the bus structure underbeam is fixed on the pre-embedded steel slab of bracket basis, place following U-shaped support steel plate, the U-shaped support insulcrete of insulated column and bus then successively, aluminium busbar is installed, need not to settle cleat insulator between each aluminium busbar, as long as reserve certain interval.U-shaped support insulcrete and steel plate on aluminium busbar top cover Up Highway UHW are installed insulated column more in the above, cover bus structure and put the beams in place, at last with the outside put the studs of insulation tube and nut with they tighten up for one be installation.
Aluminium busbar fixed support of the present utility model is prevented displacement structure, because insulated column has certain height, and has bigger space between each cylinder, this helps the ventilation and heat of bus; Owing to add and pacified the U-shaped support, further limited bus to two side shiftings, fixed; And, between the outside of aluminium busbar is with insulation thimble, also leave certain space, like this, no matter be the effect that aluminium busbar is subjected to lorentz's force; Perhaps expanded by heating all has certain adjusting space, and the riser bus bar that is unlikely the workshop electrolyzer produces adverse influence.
Description of drawings
Fig. 1 is the front view of the anti-displacement structure of aluminium busbar fixed support of the present utility model; Fig. 2 is the side-view of the anti-displacement structure of this aluminium busbar fixed support.Among above-mentioned two figure: 1 aluminium busbar; 2 bus structures are put the beams in place; 3 bus structure underbeams; 4 supports insulative posts; 5 insulation tubes; 6 studs; 7 nuts; 8U shape stent support steel plate; 9 support insulcretes.
Embodiment
Below in conjunction with accompanying drawing the anti-displacement structure of aluminium busbar fixed support of the present utility model is further described and replenishes.
As shown in Figure 1, 2, earlier bus structure underbeam 2 is fixed on the pre-embedded steel slab of bracket basis, place following U-shaped support steel plate 8, the U-shaped support insulcrete 9 of insulated column 4 and bus then successively, aluminium busbar 1 is installed, need not to settle cleat insulator between each aluminium busbar, as long as reserve certain interval.Insulated column makes cylindrical, and its centre simultaneously is provided with circular boss, and another side then is provided with the groove that matches with boss, also is provided with boss on upper and lower beam of support and the upper and lower U-shaped stent support steel plate, so that fixing upper and lower insulation cylinder.U-shaped support insulcrete and steel plate on aluminium busbar top cover Up Highway UHW are installed insulated column more in the above, cover bus structure and put the beams in place 2, at last with the outside put the studs 6 of insulation tube 5 and nut 7 with they tighten up for one be installation.

Claims (3)

1. the anti-displacement structure of aluminium busbar fixed support comprises aluminium busbar, bus structure upper beam, bus structure underbeam, insulating mat, insulation tube, and studs and nut is characterized in that:
(1) with the plate shaped insulating mat of bus upper and lower is insulated column more than two pairs instead;
(2) the bus upper/lower terminal is provided with the U-shaped support that is connected with insulated column in addition;
Reserving space when (3) being provided with necessary confession bus thermal expansion between each bus.
2. by the anti-displacement structure of the described aluminium busbar fixed support of claim 1, it is characterized in that the upper and lower U-shaped support of said bus can take double-deck plank frame, its outer for supporting steel plate, internal layer be insulating pad.
3. by the anti-displacement structure of the described aluminium busbar fixed support of claim 1, it is characterized in that said insulated column is cylindrical, they can be divided into upper and lower two-layer, and the right cylinder centre has as the round boss of joinery and its construction and groove.
CNU2008200124076U 2008-04-29 2008-04-29 Structure for preventing shifting of aluminum busbar fixed frame Expired - Fee Related CN201206172Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200124076U CN201206172Y (en) 2008-04-29 2008-04-29 Structure for preventing shifting of aluminum busbar fixed frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200124076U CN201206172Y (en) 2008-04-29 2008-04-29 Structure for preventing shifting of aluminum busbar fixed frame

Publications (1)

Publication Number Publication Date
CN201206172Y true CN201206172Y (en) 2009-03-11

Family

ID=40465239

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200124076U Expired - Fee Related CN201206172Y (en) 2008-04-29 2008-04-29 Structure for preventing shifting of aluminum busbar fixed frame

Country Status (1)

Country Link
CN (1) CN201206172Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002733A (en) * 2010-12-17 2011-04-06 河南中孚实业股份有限公司 Aluminum electrolysis bath surrounding bus with adjustable position and height
CN102510009A (en) * 2011-11-15 2012-06-20 德州亚太集团有限公司 Parallel malposed copper bar bracket
CN102560557A (en) * 2010-12-07 2012-07-11 中铝国际技术发展有限公司 Electrolytic tank anode large bus vertical supporting structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102560557A (en) * 2010-12-07 2012-07-11 中铝国际技术发展有限公司 Electrolytic tank anode large bus vertical supporting structure
CN102002733A (en) * 2010-12-17 2011-04-06 河南中孚实业股份有限公司 Aluminum electrolysis bath surrounding bus with adjustable position and height
CN102510009A (en) * 2011-11-15 2012-06-20 德州亚太集团有限公司 Parallel malposed copper bar bracket

Similar Documents

Publication Publication Date Title
CN104481178B (en) Composite material substation structure
CN201206172Y (en) Structure for preventing shifting of aluminum busbar fixed frame
CN202402793U (en) Plastic-steel cable bridge with insertion side plates
CN201206173Y (en) Structure for preventing shifting of aluminum busbar guide frame
CN201590633U (en) Bus-suspending simple bracket
CN101488422A (en) Installation rack for outdoor high voltage circuit breaker
CN212267236U (en) High-strength novel pantograph carbon slide plate
CN103510117A (en) Direct electricity conducting type movable steel claw with exchangeable claw head
CN214624671U (en) Power transformer installation device
CN212811154U (en) Combined cable support structure
CN201629873U (en) Short net system of electric arc furnace
CN220707012U (en) Clamping fixing mechanism for iron tower installation equipment
CN201981268U (en) Insulator bracket for large outdoor junction direct current bus
CN213026917U (en) Vertical side outlet arrangement structure of three-phase conductor at end part of power distribution device
CN202323061U (en) Aluminum electrolytic cell cathode bus support frame
CN219569801U (en) Metal railing with safety protection structure
CN108677215B (en) Anode conductive device for reinforcing bar die casting and its manufacturing method
CN212968976U (en) Wind power tubular bus installation structure
CN217692550U (en) Alloy bus duct of high conductivity
CN203632159U (en) Bearing and supporting structure for vertical section of heavy-current enclosed bus
CN209799315U (en) Novel steel constructs support device
CN220085775U (en) Support column cap
CN219241435U (en) Light steel spouts builds formula composite wall body strengthening mechanism
CN2920947Y (en) Slide-wire device for bridge type crane
CN213477332U (en) Curtain wall framework mounting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090311

Termination date: 20110429