CN201198551Y - Integrated ballast bed of coal mine narrow gauge railway - Google Patents

Integrated ballast bed of coal mine narrow gauge railway Download PDF

Info

Publication number
CN201198551Y
CN201198551Y CNU2008200222384U CN200820022238U CN201198551Y CN 201198551 Y CN201198551 Y CN 201198551Y CN U2008200222384 U CNU2008200222384 U CN U2008200222384U CN 200820022238 U CN200820022238 U CN 200820022238U CN 201198551 Y CN201198551 Y CN 201198551Y
Authority
CN
China
Prior art keywords
railway roadbed
railway
road bed
track
solid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200222384U
Other languages
Chinese (zh)
Inventor
沙同庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200222384U priority Critical patent/CN201198551Y/en
Application granted granted Critical
Publication of CN201198551Y publication Critical patent/CN201198551Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model relates to an integral road bed that can be prevented from being pressed in the soft laneway soleplate, and is realized by increasing the width and reducing the pressure of the road bed on the laneway soleplate. The integral road bed is prefabricated by the concrete; a plurality of inherent stress reinforced bar and threaded reinforced bar hoops are arranged inside the integral road bed to improve the strength of the road bed. The road bed is provided with longitudinal central holes to reduce the weight of the road bed and to be used as the water flowing passages. Tow track-fixer substrates are pre-arranged on the upper panel of the road bed according to the requirements of the track distance, and the substrate is provided with a track fixer base. A track fixer spring that is used for the railway steel track is fixed on the track fixer base of the integral road bed, so as to complete the pavement of the track.

Description

Coal mine narrow gauge railway monolithic road-bed
Affiliated technical field
The utility model relates to a kind of novel railway roadbed of coal mine narrow gauge railway, especially is fit to the soft tunnel of base plate and lays a railway track.
Background technology
The laying of coal mine narrow gauge railway is railway ballast and a regular sleeper on the roadway floor upper berth at present, with railway spike rail is fixed on the sleeper then.Track needs often maintenance.Particularly in the soft tunnel of base plate, sleeper often is pressed into base plate, needs often maintenance.Influence traffic safety.
The utility model content
Be pressed into base plate and maintenance difficult in order to overcome the soft tunnel of base plate track, it is a kind of coal mine narrow gauge railway monolithic road-bed that the utility model provides, because this railway roadbed increases several times than original sleeper area, so not only can prevent that railway roadbed is pressed into roadway floor, and can directly railway roadbed be laid on the roadway floor, avoid using railway ballast.
The technical scheme that its technical problem that solves the utility model adopts is: coal mine narrow gauge railway monolithic road-bed is to form with concrete prefabricated, and its length keeps original size, and its width is increased to the several times of former sleeper, and its area has also increased several times.Arrange vertically that along solid concrete roabed several cavities, center can alleviate railway roadbed weight.Railway roadbed adopts the longitudinal prestressing reinforcing bar, laterally adopts indented bars to prick hoop.Press the prefabricated two solid track device pedestals of railway gauge at the railway roadbed upper face, the solid track device base is embedded on the pedestal.Rail is fixed on the solid track device base of railway roadbed with the solid track device spring.When laying a railway track, no longer stay the gap between railway roadbed and the railway roadbed.
Beneficial effect
The beneficial effects of the utility model are:
1, because the railway roadbed area increases, and railway roadbed reduces the specific pressure of roadway floor, the possibility that railway roadbed is pressed into roadway floor reduces.So the track maintenance reduces.
2, railway roadbed is laid on the roadway floor, avoids using railway ballast.Solid concrete roabed is paved with roadway floor, and the tunnel health is clean and tidy.
3, railway roadbed is provided with the longitudinal center cavity, and a gang of trickle in tunnel can flow in the ditch of tunnel opposite side along the cavity, center.
Description of drawings
Fig. 1---solid concrete roabed elevation
Fig. 2---solid concrete roabed vertical view
Fig. 3---solid concrete roabed lateral view
1---railway roadbed
2---the cavity, center
3---prestressed reinforcement
4---the solid track device pedestal
5---the solid track device base
6---rail
7---indented bars is pricked hoop
8---the solid track device spring
The specific embodiment
Solid concrete roabed 1 is concrete prefabricated forming among the figure, has made cavity, center 2 in the railway roadbed 1 alleviating the weight of railway roadbed, and has been used for flowing water.Railway roadbed vertically adopts prestressed reinforcement 3 to improve the longitudinal strength of railway roadbed; Laterally adopt indented bars to prick the transverse strength that hoop 7 improves railway roadbed.The upper face of railway roadbed 1 is used for pre-buried solid track device base 5 by the prefabricated two solid track device pedestals 4 of railway gauge requirement.Railway track 6 usefulness solid track device springs 8 are fixed on the solid track device base 5 of railway roadbed.When laying a railway track, no longer stay the gap between railway roadbed and the railway roadbed.

Claims (1)

1. solid concrete roabed made from concrete, it is characterized in that: solid concrete roabed (1) is to form with concrete prefabricated, the more original sleeper width of width of ballast bed increases several times, railway roadbed and railway roadbed are when laying, no longer stay the gap, made cavity, center (2) in the railway roadbed (1) alleviating the weight of railway roadbed, and be used for flowing water, railway roadbed vertically adopts prestressed reinforcement (3) to improve the longitudinal strength of railway roadbed; Laterally adopt indented bars to prick the transverse strength that hoop (7) improves railway roadbed, the upper face of railway roadbed (1) is used for pre-buried solid track device base (5) by the prefabricated two solid track device pedestals of railway gauge requirement (4), and railway track (6) is fixed on the solid track device base (5) of railway roadbed with solid track device spring (8).
CNU2008200222384U 2008-05-10 2008-05-10 Integrated ballast bed of coal mine narrow gauge railway Expired - Fee Related CN201198551Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200222384U CN201198551Y (en) 2008-05-10 2008-05-10 Integrated ballast bed of coal mine narrow gauge railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200222384U CN201198551Y (en) 2008-05-10 2008-05-10 Integrated ballast bed of coal mine narrow gauge railway

Publications (1)

Publication Number Publication Date
CN201198551Y true CN201198551Y (en) 2009-02-25

Family

ID=40449709

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200222384U Expired - Fee Related CN201198551Y (en) 2008-05-10 2008-05-10 Integrated ballast bed of coal mine narrow gauge railway

Country Status (1)

Country Link
CN (1) CN201198551Y (en)

Similar Documents

Publication Publication Date Title
US9222225B2 (en) Pre-stressed concrete track slab of slab-type ballast-less track
CN206538637U (en) A kind of track strengthening device for existing railway
CN203487475U (en) Line suspending and reinforcing structure for existing line jacking bridge and culvert construction
CN201581307U (en) Longitudinal connecting component of slab type ballastless track for high speed railway
RU2006136916A (en) METHOD FOR ADJUSTING HIGH RIGID RAILWAY
CN209412614U (en) A kind of double-block type sleeper and double-block type ballastless track structure
CN204959479U (en) Embedded frame track board and track structure thereof
CN201883346U (en) Prestressed concrete track slab of slab-type ballastless track
CN209798444U (en) Truss sleeper type ballastless track for ultra-large-gradient toothed rail railway
CN101798785A (en) Ballastless track structure
CN207159714U (en) A kind of subway fastener system
CN105133438A (en) Embedded frame track plate and track structure comprising same
CN101280542A (en) Coal mine narrow gauge railway monolithic road-bed
CN201648876U (en) Ballastless rail structure
CN201695285U (en) Tensioning lock for longitudinal connection of ballastless track slab
CN202064239U (en) Embedded telescoping type concrete turnout board
CN201915299U (en) Pretensioned prestressed concrete track slab of slab ballastless track
CN212801068U (en) Reinforced concrete integral crossing
CN104532691A (en) Ballastless track connected-block sleeper
CN202830761U (en) Railway steel truss girder bridge ballastless track laying structure
CN202000221U (en) Ballastless track structure for steep slope subgrade
CN202610659U (en) Subway turnout area plate-type ballastless track composite structure
CN202073037U (en) Bridge ballastless track structure
CN201198551Y (en) Integrated ballast bed of coal mine narrow gauge railway
CN203546516U (en) Longitudinal continuous limit ballastless track on steel truss girder bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090225

Termination date: 20110510