CN201181210Y - Rotating stairs lofting device - Google Patents
Rotating stairs lofting device Download PDFInfo
- Publication number
- CN201181210Y CN201181210Y CNU2008200332153U CN200820033215U CN201181210Y CN 201181210 Y CN201181210 Y CN 201181210Y CN U2008200332153 U CNU2008200332153 U CN U2008200332153U CN 200820033215 U CN200820033215 U CN 200820033215U CN 201181210 Y CN201181210 Y CN 201181210Y
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- central steel
- construction
- dial
- fixed cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a rotary staircase sampler in the field of assisted apparatus for building construction, which comprises a central steel pipe erectly arranged, a fixed sleeve arranged outside the central steel pipe and matched with the central steel pipe, a dial horizontally and coaxially arranged outside the fixed sleeve, a level fixed on the dial, a scale base sheathed outside the central steel pipe on the upper side of the dial, and a horizontal scale radially fixed outside the scale base. During mold construction, the central steel pipe is erectly arranged at the center point of the rotary staircase needing constructing the mold and is adjusted by the level to make the dial in the horizontal position, and the scale base can rotate around the central steel pipe by a certain angle, so that the circumference or an arc with a certain length can be conveniently divided into a plurality of equal parts, the horizontal scale can mark a line once after rotating by a certain angle, and the mold is constructed after setting out the line. By constructing the mold in the manner, the rotary staircase sampler has the advantages of convenient and rapid construction and high construction accuracy, and can improve the engineering quality and shorten the construction time.
Description
Technical field
The utility model relates to a kind of auxiliary implement of housing construction, particularly a kind of setting-out utensil in the construction of spiral stairs formwork erection.
Background technology
In the prior art, the formwork erection construction of the spiral stairs of general industrial and covil construction, adopt taped measurement, the method that messenger wire weighs down, carry out the unwrapping wire of stair, find central point during unwrapping wire earlier accurately, a center steel pipe uprightly is set on central point, on the steel pipe of center, install and fix some supporting steel pipes, the certain angle that rotates in a circumferential direction between adjacent two supporting steel pipes differs the distance of one-level stair step simultaneously on short transverse, template can be bearing on the supporting steel pipe, when formwork erection, need in conjunction with spirit-leveling instrument, transit comes the division of adjustment level and angle, often will be through repeatedly adjusting, data are inaccurate, time-consuming, error is bigger, and many is to meet the requirements of by repair afterwards, bring bigger trouble to construction, influenced duration and quality.
The utility model content
The purpose of this utility model provides a kind of spiral stairs applicator, makes spiral stairs formwork erection quick construction convenient, the construction precision height.
In order to achieve the above object, the utility model has adopted following technical scheme: a kind of spiral stairs applicator, comprise a upright center steel pipe that is provided with, center steel pipe peripheral hardware has and the suitable fixed cover of center steel pipe, fixed cover is horizontally disposed with the index dial coaxial with fixed cover outward, be fixed with level on the index dial, the center steel pipe overcoat of index dial upside is equipped with rear sight base, and the rear sight base outer radial is fixed with horizontal ruler.
When formwork erection, the center steel pipe uprightly is installed on the central point of the spiral stairs that needs formwork erection,, makes its bubble placed in the middle by adjusting level, index dial is horizontal, rear sight base can turn an angle around the center steel pipe, like this can be easily the circular arc of circumference or certain-length be divided into some equal portions, and the horizontal ruler revolution can draw one time line after crossing certain angle, carry out formwork erection behind the unwrapping wire again, formwork erection in this way, quick construction is convenient, the construction precision height.Compared with prior art, the utility model can improve construction quality, simultaneously the reduction of erection time.
For making things convenient for the installation and removal of index dial, scale, described fixed cover, rear sight base all each free two half block are formed by connecting through coupling bolt, and index dial is also corresponding with fixed cover to be divided into two, and is connected as a single entity with corresponding half block respectively.By coupling bolt, index dial, scale can be installed on the steel pipe of center, also can unload easily.
Carry out unwrapping wire on the short transverse for making things convenient for, described horizontal ruler end is provided with the Vertical surveyors' staff perpendicular with horizontal ruler.Described horizontal ruler and Vertical surveyors' staff can be socketed to form by the multistage expansion link that has scale; The unwrapping wire that can adapt to multiple size like this.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is that the A-A of Fig. 1 is to view.
Wherein, 1 Vertical surveyors' staff, 2 horizontal rulers, 3 center steel pipes, 4 rear sight bases, 5 levels, 6 index dials, 7 fixed covers.
Embodiment
As figure, be the spiral stairs applicator, comprise a upright center steel pipe 3 that is provided with, center steel pipe 3 is outer to be provided with the fixed cover 7 suitable with center steel pipe 3, fixed cover 7 is outer to be horizontally disposed with the index dial 6 coaxial with fixed cover 7, be fixed with level 5 on the index dial 6, be set with rear sight base 4 outside the center steel pipe 3 of index dial 6 upsides, rear sight base 4 outer radials are fixed with horizontal ruler 2; Fixed cover 7, rear sight base 4 all each free two half block are formed by connecting through coupling bolt, and index dial 6 is also corresponding with fixed cover 7 to be divided into two, and is connected as a single entity with corresponding half block respectively; Horizontal ruler 2 ends are provided with the Vertical surveyors' staff 1 perpendicular with horizontal ruler 2; Horizontal ruler 2 and Vertical surveyors' staff 1 are socketed to form by the multistage expansion link that has scale.
During use, advanced line data calculates, and calculates according to the step number of stair step and the arc angle that revolved, and obtains arc angle φ, height h, the inner arc radius r of each grade step, outer arc radius R that each grade step of spiral stairs occupies.
During formwork erection, at first lay center steel pipe 3, can proofread and correct by level 5, guarantee that the center steel pipe is strict vertically, index dial, horizontal ruler are horizontal simultaneously, proofread and correct with line bob or transit, center steel pipe 3 is placed in the circle centre position of spiral stairs.Behind the leveling instrument, horizontal ruler 2 is placed the position of initially marking time, read initial circle reading, rotate horizontal ruler 2, the angle value that turns over is φ, and horizontal ruler 2 outer ends are pulled out and made its outer end is R to centre distance, obtains the position of radius r simultaneously; Vertical surveyors' staff 1 is pulled out height h, and Vertical surveyors' staff 1 upper end is the upper level position of marking time, and connects template supporting steel pipe with fastener according to this position on center steel pipe 3.And the like, the rotary scale seat 4 once more, and the angle value is φ, and the outer end length of horizontal ruler 2 is constant, and slider position also immobilizes, and by drawing Vertical surveyors' staff 1 on 2h, 3h, the 4h......, determines the 3rd, the 4th supporting steel pipe position of marking time.
After unwrapping wire finishes, can index dial 6, horizontal ruler 2 and Vertical surveyors' staff 1 be removed, remove with template when 3 of center steel pipes remain to form removal by coupling bolt.
Claims (4)
1, a kind of spiral stairs applicator, comprise a upright center steel pipe that is provided with, it is characterized in that: center steel pipe peripheral hardware has and the suitable fixed cover of center steel pipe, fixed cover is horizontally disposed with the index dial coaxial with fixed cover outward, be fixed with level on the index dial, the center steel pipe overcoat of index dial upside is equipped with rear sight base, and the rear sight base outer radial is fixed with horizontal ruler.
2, spiral stairs applicator according to claim 1 is characterized in that: described fixed cover, rear sight base all each free two half block are formed by connecting through coupling bolt, and index dial is also corresponding with fixed cover to be divided into two, and is connected as a single entity with corresponding half block respectively.
3, spiral stairs applicator according to claim 2 is characterized in that: described horizontal ruler end is provided with the Vertical surveyors' staff perpendicular with horizontal ruler.
4, spiral stairs applicator according to claim 3 is characterized in that: described horizontal ruler and Vertical surveyors' staff are socketed to form by the multistage expansion link that has scale.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200332153U CN201181210Y (en) | 2008-03-17 | 2008-03-17 | Rotating stairs lofting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200332153U CN201181210Y (en) | 2008-03-17 | 2008-03-17 | Rotating stairs lofting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201181210Y true CN201181210Y (en) | 2009-01-14 |
Family
ID=40250709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200332153U Expired - Fee Related CN201181210Y (en) | 2008-03-17 | 2008-03-17 | Rotating stairs lofting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201181210Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161320A (en) * | 2013-04-10 | 2013-06-19 | 中国十九冶集团有限公司 | Multifunctional position line hanging device |
CN106595610A (en) * | 2016-07-29 | 2017-04-26 | 上海市建筑装饰工程集团有限公司 | Three-dimensional lofting rod member |
CN106595614A (en) * | 2016-12-30 | 2017-04-26 | 中南大学 | Slot raise cuthole precise lofting device and application method thereof |
CN106840116A (en) * | 2016-07-29 | 2017-06-13 | 上海市建筑装饰工程集团有限公司 | Three-dimensional lofting method |
CN108225292A (en) * | 2018-04-11 | 2018-06-29 | 佛山科学技术学院 | A kind of mixing pile construction setting-out Fast Fixed-point device |
CN110331862A (en) * | 2019-06-18 | 2019-10-15 | 中国一冶集团有限公司 | A kind of construction layout tool and component construction layout method |
-
2008
- 2008-03-17 CN CNU2008200332153U patent/CN201181210Y/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161320A (en) * | 2013-04-10 | 2013-06-19 | 中国十九冶集团有限公司 | Multifunctional position line hanging device |
CN103161320B (en) * | 2013-04-10 | 2015-04-08 | 中国十九冶集团有限公司 | Multifunctional position line hanging device |
CN106595610A (en) * | 2016-07-29 | 2017-04-26 | 上海市建筑装饰工程集团有限公司 | Three-dimensional lofting rod member |
CN106840116A (en) * | 2016-07-29 | 2017-06-13 | 上海市建筑装饰工程集团有限公司 | Three-dimensional lofting method |
CN106840116B (en) * | 2016-07-29 | 2019-05-31 | 上海市建筑装饰工程集团有限公司 | Three-dimensional lofting method |
CN106595610B (en) * | 2016-07-29 | 2023-02-28 | 上海市建筑装饰工程集团有限公司 | Three-dimensional lofting rod piece |
CN106595614A (en) * | 2016-12-30 | 2017-04-26 | 中南大学 | Slot raise cuthole precise lofting device and application method thereof |
CN108225292A (en) * | 2018-04-11 | 2018-06-29 | 佛山科学技术学院 | A kind of mixing pile construction setting-out Fast Fixed-point device |
CN110331862A (en) * | 2019-06-18 | 2019-10-15 | 中国一冶集团有限公司 | A kind of construction layout tool and component construction layout method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201181210Y (en) | Rotating stairs lofting device | |
CN108680103B (en) | Rapid and precise positioning measurement method for cable-stayed bridge ultrahigh bridge tower pier anchoring structure | |
CN102269585B (en) | Method for precisely measuring survey beacon height | |
CN102620717A (en) | Universal accurate and horizontal measuring device | |
CN203643450U (en) | Concrete slump measuring device | |
CN103205936B (en) | Device and method for accurately positioning spherical hinge | |
CN203022032U (en) | Auxiliary tool for retest of pile position | |
CN203672291U (en) | Cylindricity measuring device for large-size cylinder body | |
CN103557800B (en) | Multilayer floor slab layering horizontal displacement monitoring method | |
CN106738500B (en) | A kind of installation detection method of wind-powered blade mold pre-embedded bolt flange tooling | |
CN104164984B (en) | A kind of large cooling column barrel space geometry localization method with ribbing | |
CN209069170U (en) | Cutter head of shield machine, tool wear measurement rotation ruler, measuring system | |
CN106944676B (en) | The method that gate installation hole is opened up on the cylinder of steel containment vessel of nuclear power station | |
CN104567841B (en) | A method of for the centering of total station high-altitude | |
CN109405708B (en) | Cutter head of shield machine, cutter abrasion measurement rotating ruler, measurement system and measurement method | |
CN209416195U (en) | Pole and tower foundation point hole constructing device | |
CN201463795U (en) | Special tool for measuring axis coordinate | |
CN108532984B (en) | High-precision mounting method for supporting jig frame | |
CN109458999B (en) | Drilling construction foundation parameter correction measuring device and measuring method thereof | |
CN204495342U (en) | The special optical measuring device of a kind of column vertical bury pipe | |
CN202582540U (en) | Process pipeline assembling angle positioning device | |
CN212865918U (en) | Bored concrete pile steel reinforcement cage positioner | |
CN205156914U (en) | Slope measuring instrument | |
CN209230584U (en) | Rotating machinery shaft angle calibration device | |
CN202066477U (en) | Laser measuring target stand for flange positioning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090114 Termination date: 20110317 |